Skip to content
Back to skills

S4h Resource Waste Audit

ASecurity

Finds where resources are being lost, duplicated, or underused — the seven wastes applied to knowledge work. Triggers: 'waste audit', 'where are we wasting resources', 'inefficiency audit', 'find the waste', 'what's being duplicated', 'resource leakage'.

  • 219 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added September 6, 2026
ai-agentsgo

Security analysis

A100/100

Scanned September 6, 2026

npx -y skills add human-avatar/skills-for-humanity --skill s4h-resource-waste-audit --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of S4h Resource Waste Audit?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for S4h Resource Waste Audit
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/human-avatar-s4h-resource-waste-audit/badge)](https://www.skillsdirectory.com/skills/human-avatar-s4h-resource-waste-audit)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: s4h-resource-waste-audit
description: "Finds where resources are being lost, duplicated, or underused — the seven wastes applied to knowledge work. Triggers: 'waste audit', 'where are we wasting resources', 'inefficiency audit', 'find the waste', 'what's being duplicated', 'resource leakage'."
---

# Resource Waste Audit

In manufacturing, Toyota identified seven categories of waste. They apply equally to knowledge work — with a different surface appearance but the same underlying structure. The goal is to find where resources are consumed without producing value.

---

## The Seven Wastes in Knowledge Work

| Waste | Description |
|-------|-------------|
| **Waiting** | Idle time between steps — work blocked pending a decision, review, or dependency |
| **Overproduction** | Producing more than is needed — reports no one reads, features no one uses |
| **Rework** | Fixing what should have been right — re-doing work due to unclear requirements or poor handoffs |
| **Duplication** | The same work being done in two places — parallel efforts, re-discovered knowledge |
| **Motion** | Unnecessary switching or handoffs — context switching, excessive meetings, process overhead |
| **Inventory** | Work in progress that is not flowing — large backlogs, features built but not shipped |
| **Over-processing** | More effort than the task requires — over-engineered solutions, unnecessary polish |

---

## Your Process

**Step 1: Map the Workflow or Resource Allocation**
Describe how work moves through the system — the full path from input to value delivery.

**Framing check:** Confirm the specific workflow or resource area before continuing. State what you've identified — the system or team being audited and its primary resource inputs — in one sentence, then use `AskUserQuestion`:
- **Question:** "I'm reading this as: [your one-sentence framing of the workflow or resource area being audited]. Is that right?"
- **Header:** "Framing"
- **Options:**
  - **Yes — proceed** — framing is correct
  - **Adjust** — one element is off; user will correct it before you continue
  - **Reframe** — different situation than read; incorporate the correction before proceeding

**Step 2: Scan Each Waste Category**
For each of the seven wastes: where does it appear in the workflow? Look for specific instances, not general impressions.

**Step 3: Quantify Each Waste**
Estimate roughly how much resource each waste consumes — time per week, headcount, or percentage of capacity. Rough estimates are fine; the goal is to rank, not to audit precisely.

**Step 4: Root Cause per Waste**
Why does this waste exist? Process design? Incentive structure? Unclear ownership? Identifying the root cause determines whether the fix is simple or systemic.

**Step 5: Rank by Impact and Recommend**
Which waste removal would free the most resource?

**Before narrowing:** Show the complete set of identified waste instances to the user first. Use `AskUserQuestion`:
- **Question:** "I've identified [N] waste instances across the seven categories. Before I select the top three by impact, are there any you'd flag as especially important, or any I've missed?"
- **Header:** "Prioritise"
- **Options:**
  - **Proceed with your selection** — the set looks right
  - **Flag one** — user will name a specific waste instance to include in the top three
  - **Add a missing one** — user will describe a waste instance not yet identified

Prioritise the top three and propose specific actions.

---

## Human Check-in

Before proceeding, use the `AskUserQuestion` tool. State your interpretation of the situation in 1–2 sentences — what is being analyzed and what the core question is — then ask:

- **Question:** "My read: [your 1–2 sentence interpretation]. How do you want to proceed?"
- **Header:** "Scope"
- **Options:**
  - **Full analysis** — Complete all steps, reasoning shown throughout
  - **Key findings only** — Bottom-line output, skip step-by-step detail
  - **Biggest waste items only** — Top 3 losses by magnitude, skip smaller inefficiencies
  - **Reframe** — The read is off; correct it and the analysis will follow the corrected framing

Proceed based on their selection. If the user reframes, incorporate the correction before running any analysis.

## Output Format

### Waste Inventory
| Waste Type | Where It Appears | Estimated Resource Cost | Root Cause |
|-----------|-----------------|------------------------|------------|
| Waiting | ... | ... | ... |
| Overproduction | ... | ... | ... |
| Rework | ... | ... | ... |
| Duplication | ... | ... | ... |
| Motion | ... | ... | ... |
| Inventory | ... | ... | ... |
| Over-processing | ... | ... | ... |

### Top 3 Waste Reductions (Ranked by Impact)
1. **[Waste type]** — [Specific action] — [Expected resource freed]
2. **[Waste type]** — [Specific action] — [Expected resource freed]
3. **[Waste type]** — [Specific action] — [Expected resource freed]

---

## Notes

Rework and duplication are usually the most expensive wastes in knowledge work, but waiting is often the most demoralising. Address the highest-cost waste first, but don't ignore the one most affecting morale.

---

## What's Next

After delivering this output, use `AskUserQuestion` to offer the next move:

- **Question:** "Waste audited. What's next?"
- **Header:** "Next"
- **Options:**
  - `/s4h-resource-allocation-analysis` — Reallocate resources freed by eliminating waste
  - `/s4h-resource-leverage-mapping` — Reinvest freed capacity into high-leverage areas
  - `/s4h-decision-criteria-weighting` — Weight decisions after waste is removed from the picture
  - **Done** — Wrap up and synthesise what we have so far

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.