Use after design approval for milestone plans with executable acceptance.
1,531 stars
0 votes
0 copies
0 views
Added November 7, 2026
ai-agentsgogit
Security analysis
A100/100
Scanned November 7, 2026
$npx -y skills add hashgraph-online/awesome-codex-plugins --skill plan --agent claude-code
Installs into .claude/skills of the current project.
Are you the author of Plan?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/hashgraph-online-plan-9576b957)
---
name: plan
description: Use after design approval for milestone plans with executable acceptance.
---
# Plan
`docs/staging/plans/YYYY-MM-DD-<topic>.md`. Reference the spec; don't restate it.
If unresolved spec notes affect implementation or task order, return to `design`.
## Multi-module plan
If `topology=multi-module` (triage announcement or coordinator spec/plan declaration), read `../references/multi-module.md`. Open the workspace plan with the declaration block (`topology: multi-module`, `change-set`, `coordinator`, `repos`, module plan paths, integration task) - it is the on-disk mode marker downstream skills rely on.
- Write the workspace plan in the coordinator repository and a module plan in every affected module's owning repository.
- The workspace plan lists the change-set ID, coordinator, repositories, module plan paths, and the integration task.
- Every task names exactly one `repository:` and one `module:`. Cross-module verification is an `integration` task owned by the coordinator.
- Order contract tasks before consumers, local acceptance before integration, and integration before linked commits.
- Mark tasks parallel only when they have independent write scopes and acceptance.
- Adding a repository after implementation starts: update the declaration block and confirm with the user. Return to `design` only if the addition changes a shared contract.
## Rolling wave
Spec references a milestone (`milestone: MN`)? Check `docs/ROADMAP.md` — expand only that milestone. Leave the rest as stubs.
After `ship`: open `docs/ROADMAP.md`, confirm which milestone is next, then expand it. Return to `design` only if the milestone's goal materially changed.
## Milestone tasks (30-60 min each)
Every task is `- [ ] T<n>: <name>` - always a checkbox, never a heading. `tdd`/`subagents` flip it to `- [x]` on completion; `ship` refuses to run while any `- [ ]` remains.
```
goal: <one sentence>
files: <paths>
acceptance: <test or cmd>
spec: <docs/staging/specs/...#anchor>
```
No exact code. No step-by-step. Acceptance is verifiable: a test, command, or scripted check — or, when none is possible, an explicit manual check (steps + expected result). Each task leaves the repo green.
Mark independent tasks: `[parallel] T3, T4, T5`.
Only mark `[parallel]` when shared contracts, state, errors, and acceptance are closed.
**Atomic expansion is deferred until dispatch time** - `subagents` expands a milestone into 2-5 min steps at dispatch time, not here.
for **New project**: derive an initialization task — scaffold code, tests, CI, and always include: `README.md`, `CHANGELOG.md`, `.gitignore`, and a `Makefile` (or equivalent task runner config).
## Don't put in the plan
background, architecture, rationale (spec), CI commands, copy-pasted acceptance.
## Hand off
`<gate>` The plan must exist on disk before handing off to `tdd`/`subagents`. For multi-module work, this means the coordinator workspace plan and every affected module plan in its owning repository. `</gate>`
Confirm plan with the user.
mostly `[parallel]` → `subagents`. Otherwise → `tdd`.