This skill should be used when reviewing floor-area-ratio (FAR / 容積) exemption items for buildings in Taiwan and avoiding the gap between nominal drawing dimensions and finished clear dimensions. It covers the elevator/stair lobby (梯廳) FAR-exemption clear-dimension trap and the cross-regulation 'finished clear dimension' pattern where finishing layers (e.g. stone cladding) erode the legally-measured dimension and jeopardize the use permit (使照). 電梯車廂/機道之無障礙尺寸請用accessible-elevator-shaft-dimensi...
Scanned 9/5/2026
Install to Claude Code
npx -y skills add h30190/HJPLUS_Taiwan_Architect_KB --skill floor-area-exemption-pitfalls --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Floor Area Exemption Pitfalls?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/h30190-floor-area-exemption-pitfalls)More formats (shields.io, HTML) on the badges page.
---
type: Skill
name: floor-area-exemption-pitfalls
description: "This skill should be used when reviewing floor-area-ratio (FAR / 容積) exemption items for buildings in Taiwan and avoiding the gap between nominal drawing dimensions and finished clear dimensions. It covers the elevator/stair lobby (梯廳) FAR-exemption clear-dimension trap and the cross-regulation 'finished clear dimension' pattern where finishing layers (e.g. stone cladding) erode the legally-measured dimension and jeopardize the use permit (使照). 電梯車廂/機道之無障礙尺寸請用accessible-elevator-shaft-dimensions。Trigger words: 容積免計、梯廳淨深度、完成面淨尺寸。"
license: CC-BY-SA-4.0
compatibility: claude-code,opencode,agent-skills
metadata:
audience: architects
region: taiwan
class: C
---
# Floor-Area Exemption Pitfalls (容積免計項目實務陷阱)
## Overview
This skill captures field-level pitfalls in Taiwan's floor-area-ratio (FAR / 容積) exemption items — the practitioner know-how that statutory text omits. Plain code lists the exemption threshold; it does not warn you that a value drawn exactly at the threshold will fail at completion. Invoke this skill when:
- Planning FAR-exempt spaces (elevator/stair lobbies, MEP rooms, etc.)
- Deciding whether drawn clear dimensions must reserve thickness for finishing layers
- FAR is nearly maxed out and any failed exemption causes an overage
- Self-checking before use-permit (使照) inspection to avoid completion-stage failures
---
## Core Principle: Nominal Drawing Dimension ≠ Finished Clear Dimension
Many FAR (and other) exemption/compliance thresholds are checked against the **finished clear dimension**, but drawings often note the **structural / rough nominal dimension**. Finishing layers consume the difference:
```
nominal clear dimension − two-side finishing thickness (stone, tile, substrate) = finished clear dimension (the value the regulator actually measures)
```
When a threshold is "**greater-than-or-equal**", drawing exactly at the threshold guarantees a completion-stage shortfall. The correct practice is to reserve finishing thickness as buffer and draw above the threshold.
This is a **cross-regulation recurring pattern**. The elevator/stair lobby FAR exemption is the most typical and highest-consequence instance — the first card in this series.
---
## Pitfall Card: Elevator/Stair Lobby (梯廳) FAR Exemption — Finished Clear Dimension Trap
| Field | Value |
|---|---|
| **Regulatory basis** | Building Technical Regulations (Design & Construction) **Article 162, Paragraph 1, Subparagraph 1** |
| **Threshold** | The shared stair/elevator lobby **clear depth (淨深度) must be ≥ 2.0 m** (note: *clear* depth — measured at the finished face). Also: exempt lobby area ≤ 10% of that floor's area; balcony + lobby combined ≤ 15% of that floor's area (excess counts toward FAR) |
| **Gap mechanism** | nominal depth − stone-cladding/finishing thickness on both ends = finished clear depth (eroded by finishes; dropping below 2 m forfeits the exemption) |
| **Drawing countermeasure** | Draw nominal **2.1 m**, reserving finishing thickness (≈5 cm per side, adjust to actual build-up), so the **clear depth** stays ≥ 2.0 m after cladding |
| **Failure consequence** | finished face < 2.0 m → lobby area **counts toward FAR gross floor area** → if FAR already maxed, overage → **use permit (使照) inspection fails** |
| **Failure timing** | Surfaces only after finishing is installed; very hard to remediate (may require demolishing finishes or altering structure) |
| **Linked items** | FAR gross-floor-area calculation, interior fit-out, use-permit completion inspection |
| **Severity** | 🔴 High (directly blocks the use permit; a late-stage, post-completion risk) |
> Mnemonic: the 2 m threshold is what must be measurable **after** cladding; draw 2.1 m so the stone's thickness is given away up front.
---
## Cross-Regulation Siblings (to be added)
The same "finishing layer / construction tolerance erodes clear dimension → crosses a critical threshold → blocked" structure recurs elsewhere. Each sibling files under its own regulatory home but reuses this card format and cross-links here:
| Sibling pitfall (TBD) | Likely regulatory home | Threshold direction |
|---|---|---|
| Accessible route / corridor clear width | Accessibility design | ≥ (often fails after cladding) |
| Stair clear width / tread depth | Building Tech Reg (egress) | ≥ |
| Driveway / parking stall clear dimensions | Building Tech Reg (parking) | ≥ |
| Fire door / stair-lobby clearances | Building Tech Reg (fire egress) | ≥ |
| Other FAR-exemption critical/upper limits | FAR & coverage calculation | varies |
---
## To Verify
- Clear-depth determination for **irregularly-shaped lobbies** (how the "> 2 m clear depth" portion is recognized when the lobby is non-rectangular) — see National Land Management Agency interpretation ([nlma 12840](https://www.nlma.gov.tw/ch/titlelist/interpcomp/12840)).
- Article 162 §1 subparagraphs 2–3 (MEP, parking exemptions) carry separate execution interpretations to review alongside the lobby exemption.
### MCP Tool Examples
- `taiwan-building-code_search_building_interpretations(query: "容積免計 梯廳", limit: 5)`
- `taiwan-building-code_search_building_code(query: "容積率", limit: 10)`
## References
- Building Technical Regulations (Design & Construction) Article 162 — FAR gross-floor-area calculation and exemption items ([Laws & Regulations Database](https://law.moj.gov.tw/LawClass/LawSingleRela.aspx?PCODE=D0070115&FLNO=162&ty=L))
- National Land Management Agency interpretation letters (lobby FAR-exemption review)
- Local-government building-permit and use-permit inspection rules
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!