Skip to content
Back to skills

Archicad Basic Workflow

ASecurity

This skill should be used when architects need to understand Archicad project setup, BIM modeling workflow, view organization, drawing production, and publishing processes. Scope: project setup and modeling workflow only — actual drawing production, issue sets and PDF/DWG publishing belong to archicad-documentation. Trigger words: Archicad 建模、專案設定。

  • 153 stars
  • 0 votes
  • 0 copies
  • 9 views
  • Added September 5, 2026
businessshelldocumentation

Works with

  • cli

Security analysis

A100/100

Pro scans all 2 files and shows the line behind each finding

Scanned September 5, 2026

npx -y skills add h30190/HJPLUS_Taiwan_Architect_KB --skill archicad-basic-workflow --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Archicad Basic Workflow?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Archicad Basic Workflow
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/h30190-archicad-basic-workflow/badge)](https://www.skillsdirectory.com/skills/h30190-archicad-basic-workflow)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
type: Skill
name: archicad-basic-workflow
description: "This skill should be used when architects need to understand Archicad project setup, BIM modeling workflow, view organization, drawing production, and publishing processes. Scope: project setup and modeling workflow only — actual drawing production, issue sets and PDF/DWG publishing belong to archicad-documentation. Trigger words: Archicad 建模、專案設定。"
license: CC-BY-SA-4.0
compatibility: claude-code,opencode,agent-skills
metadata:
  audience: architects
  region: taiwan
  class: A
---

# Archicad Basic Workflow

This skill covers the core Archicad workflow for architectural projects, from project setup and model organization to view creation, layout documentation, coordination, and publishing.

---

## Section 1: Project Startup

### 1.1 Initial Setup Checklist

| Item | Purpose | Typical Decision |
|---|---|---|
| Project origin | Defines the shared reference point | Align with survey or agreed BIM coordination point |
| Stories | Controls vertical building levels | Match architectural levels and structural datums |
| Grid system | Establishes planning and structural references | Coordinate with structural consultant |
| Units | Controls display and documentation precision | Set by office standard and project phase |
| Project location | Supports sun studies and geolocation | Use site location when relevant |
| Attributes | Controls graphic and BIM consistency | Start from office template where possible |

### 1.2 Recommended Early Decisions

- Confirm project phase and expected deliverables before modeling in detail.
- Set story heights before placing major walls, slabs, stairs, and curtain walls.
- Establish layer combinations, model view options, and renovation filters early.
- Use favorites for repeated assemblies, components, and annotation types.
- Define naming conventions for views, layouts, zones, modules, and hotlinks.

---

## Section 2: Modeling Workflow

### 2.1 Model From Big To Small

Start with architectural massing and primary building systems before detailed components.

| Stage | Model Focus | Output |
|---|---|---|
| Concept | Massing, levels, gross zones | Feasibility diagrams and area checks |
| Schematic | Walls, slabs, openings, stairs | Plans, sections, elevations, basic schedules |
| Design development | Assemblies, key details, consultant references | Coordinated drawings and model review |
| Construction documents | Accurate dimensions, annotations, details | Permit or construction drawing package |

### 2.2 Core Elements

- Use walls, slabs, roofs, shells, columns, beams, stairs, railings, doors, and windows as native BIM elements.
- Use Morphs and Objects only when native tools cannot represent the design intent efficiently.
- Keep classification, ID, layer, renovation status, and surface settings consistent.
- Avoid over-modeling details that should be drawn as 2D details or worksheets.

---

## Section 3: Views And Documentation

### 3.1 View Structure

| Archicad Area | Role |
|---|---|
| Project Map | Raw model viewpoints |
| View Map | Saved documentation views with scale and graphic settings |
| Layout Book | Sheet composition and title block management |
| Publisher Sets | Export sets for PDF, DWG, BIMx, or coordination packages |

### 3.2 View Settings To Control

- Scale
- Layer combination
- Model view options
- Graphic overrides
- Pen set
- Renovation filter
- Dimension standard
- Partial structure display

---

## Section 4: Coordination Rhythm

### 4.1 Weekly Coordination Cycle

1. Update linked references, survey files, and consultant models.
2. Review clashes and design changes in 3D and section.
3. Resolve ownership: architectural, structural, MEP, interior, or client decision.
4. Update saved views and affected layouts.
5. Publish a dated coordination set.

### 4.2 Quality Checks

- Model origin and consultant model alignment.
- Story height and level consistency.
- Door and window IDs.
- Zone names, numbers, and areas.
- Layout issue date and revision status.
- PDF output scale and title block information.

Files in this skill

  • SKILL.md4 KB
  • domain.md1.9 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.