Skip to content
Back to skills

References

ASecurity

Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs.

  • 10 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 24, 2026
ai-agentsgo

Works with

  • cli

Security analysis

A100/100

Pro scans all 2 files and shows the line behind each finding

Scanned September 24, 2026

npx -y skills add furkantokkan/agent-foundry --skill references --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of References?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for References
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/furkantokkan-references-18ebbc85/badge)](https://www.skillsdirectory.com/skills/furkantokkan-references-18ebbc85)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: sprint-plan
description: "Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs."
argument-hint: "[new|update|status] [--review full|lean|solo]"
user-invocable: true
allowed-tools: Read Glob Grep Write Edit Task AskUserQuestion
model: inherit
---

## Phase 0: Parse Arguments

Extract the mode argument (`new`, `update`, or `status`) and resolve the review mode (once, store for all gate spawns this run):
1. If `--review [full|lean|solo]` was passed → use that
2. Else read `production/review-mode.txt` → use that value
3. Else → default to `lean`

See `.claude/docs/director-gates.md` for the full check pattern.

**Review mode check** (before gates run):
- Read `production/review-mode.txt` if it exists. Use that mode.
- If the file doesn't exist and this is a `new` sprint: use `AskUserQuestion`:
  - Prompt: "No review mode is set. Which review depth would you like for this sprint?"
  - Options:
    - `[A] full — spawn all director and lead gates`
    - `[B] lean — skip non-phase-gate director reviews (recommended for most sprints)`
    - `[C] solo — skip all gate spawning`
  - After selection: write `production/review-mode.txt` with the chosen mode. Say: "Review mode set to [mode] and saved to production/review-mode.txt."
- If the file doesn't exist and this is NOT a `new` sprint (e.g., updating an existing sprint): default to `lean` silently.

---

## Phase 1: Gather Context

1. **Read the current milestone** from `production/milestones/`.

2. **Read the previous sprint** (if any) from `production/sprints/` to
   understand velocity and carryover.

3. **Scan design documents** in `design/gdd/` for features tagged as ready
   for implementation.

4. **Check the risk register** at `production/risk-register/`.

---

## Phase 2: Generate Output

For `new`:

**Generate a sprint plan** following this format and present it to the user. Do NOT ask to write yet — the producer feasibility gate (Phase 4) runs first and may require revisions before the file is written.

```markdown
# Sprint [N] — [Start Date] to [End Date]

## Sprint Goal
[One sentence describing what this sprint achieves toward the milestone]

## Capacity
- Total days: [X]
- Buffer (20%): [Y days reserved for unplanned work]
- Available: [Z days]

## Tasks

### Must Have (Critical Path)
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|

### Should Have
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|

### Nice to Have
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|

## Carryover from Previous Sprint
| Task | Reason | New Estimate |
|------|--------|-------------|

## Risks
| Risk | Probability | Impact | Mitigation |
|------|------------|--------|------------|

## Dependencies on External Factors
- [List any external dependencies]

## Definition of Done for this Sprint
- [ ] All Must Have tasks completed
- [ ] All tasks pass acceptance criteria
- [ ] QA plan exists (`production/qa/qa-plan-sprint-[N].md`)
- [ ] All Logic/Integration stories have passing unit/integration tests
- [ ] Smoke check passed (`/smoke-check sprint`)
- [ ] QA sign-off report: APPROVED or APPROVED WITH CONDITIONS (`/team-qa sprint`)
- [ ] No S1 or S2 bugs in delivered features
- [ ] Design documents updated for any deviations
- [ ] Code reviewed and merged
```

For `update`:

**Update an existing sprint plan**:

1. Read the most recent sprint plan from `production/sprints/`.
2. Present the current story list with their current statuses from `production/sprint-status.yaml`.
3. Ask the user what to change: stories to add, remove, reprioritize, or re-estimate. Use `AskUserQuestion` to gather changes.
4. Apply the changes and re-present the full revised plan for review.
5. Re-run the producer feasibility gate (Phase 4) on the revised plan.
6. Write the updated markdown plan and yaml together (same approval as `new` mode).

Note: `update` mode does not reset story statuses. Stories already marked `in-progress` or `done` keep their status. Only `backlog` and `ready-for-dev` stories can be removed or reprioritized freely.

For `status`:

**Generate a status report**:

```markdown
# Sprint [N] Status -- [Date]

## Progress: [X/Y tasks complete] ([Z%])

### Completed
| Task | Completed By | Notes |
|------|-------------|-------|

### In Progress
| Task | Owner | % Done | Blockers |
|------|-------|--------|----------|

### Not Started
| Task | Owner | At Risk? | Notes |
|------|-------|----------|-------|

### Blocked
| Task | Blocker | Owner of Blocker | ETA |
|------|---------|-----------------|-----|

## Burndown Assessment
[On track / Behind / Ahead]
[If behind: What is being cut or deferred]

## Emerging Risks
- [Any new risks identified this sprint]
```

---

## Phase 3: Prepare Sprint Status File

After generating a new sprint plan, also prepare the `production/sprint-status.yaml` content.
This is the machine-readable source of truth for story status — read by
`/sprint-status`, `/story-done`, and `/help` without markdown parsing.

**Do not write the yaml yet** — hold it in context. The producer feasibility
gate (Phase 4) may revise the story list. Both files are written together after
the final plan decision; no separate file approval follows.

Format:

```yaml
# Auto-generated by /sprint-plan. Updated by /story-done and /dev-story.
# DO NOT edit manually — use /story-done to update story status.
#
# Status value mapping (yaml ↔ story file Status field):
#   backlog        ↔  Not Started
#   ready-for-dev  ↔  Ready
#   in-progress    ↔  In Progress
#   review         ↔  In Review
#   done           ↔  Complete
#   blocked        ↔  Blocked

sprint: [N]
goal: "[sprint goal]"
start: "[YYYY-MM-DD]"
end: "[YYYY-MM-DD]"
generated: "[YYYY-MM-DD]"
updated: "[YYYY-MM-DD]"

stories:
  - id: "[epic-story, e.g. 1-1]"
    name: "[story name]"
    file: "[production/stories/path.md]"
    priority: must-have        # must-have | should-have | nice-to-have
    status: ready-for-dev      # backlog | ready-for-dev | in-progress | review | done | blocked
    owner: ""
    estimate_days: 0
    blocker: ""
    completed: ""
```

Initialize each story from the sprint plan's task tables:
- Must Have tasks → `priority: must-have`, `status: ready-for-dev`
- Should Have tasks → `priority: should-have`, `status: backlog`
- Nice to Have tasks → `priority: nice-to-have`, `status: backlog`

For `update`: read the existing `sprint-status.yaml`, carry over statuses for
stories that haven't changed, add new stories, remove dropped ones.

---

## Phase 4: Producer Feasibility Gate

**Review mode check** — apply before spawning PR-SPRINT:
- `solo` → skip. Note: "PR-SPRINT skipped — Solo mode." Proceed to Phase 5 (QA plan gate).
- `lean` → skip (not a PHASE-GATE). Note: "PR-SPRINT skipped — Lean mode." Proceed to Phase 5 (QA plan gate).
- `full` → spawn as normal.

Before finalising the sprint plan, spawn `producer` via Task using gate **PR-SPRINT** (`.claude/docs/director-gates.md`).

Pass: proposed story list (titles, estimates, dependencies), total team capacity in hours/days, any carryover from the previous sprint, milestone constraints and deadline.

Present the producer's assessment.

If UNREALISTIC: revise the story selection (defer stories to Should Have or
Nice to Have) and re-present it for final plan approval.

If CONCERNS, use `AskUserQuestion`:
- Prompt: "Producer flagged concerns with this sprint plan. How do you want to proceed?"
- Options:
  - `[A] Proceed as planned — I accept the risk`
  - `[B] Adjust scope — defer some Should Have stories`
  - `[C] Extend the sprint timeline`

If [A]: persist the approved plan outputs.
If [B]: revise the story list, re-present the updated plan, then persist after approval.
If [C]: adjust sprint dates and capacity, re-present the updated plan, then persist after approval.

After the producer's plan verdict is approved, write
`production/sprints/sprint-[N].md` and `production/sprint-status.yaml` as the
declared outputs without a second file prompt. Verdict: **COMPLETE** — plan and
status created. If the plan decision is declined, Verdict: **BLOCKED**.

After writing, add:

> **Scope check:** If this sprint includes stories added beyond the original epic scope, run `/scope-check [epic]` to detect scope creep before implementation begins.

---

## Phase 5: QA Plan Gate

Before closing the sprint plan, check whether a QA plan exists for this sprint.

Use `Glob` to look for `production/qa/qa-plan-sprint-[N].md` or any file in `production/qa/` referencing this sprint number.

**If a QA plan is found**: note it in the sprint plan output — "QA Plan: `[path]`" — and proceed.

**If no QA plan exists**: do not silently proceed. Surface this explicitly:

> "This sprint has no QA plan. A sprint plan without a QA plan means test requirements are undefined — developers won't know what 'done' looks like from a QA perspective, and the sprint cannot pass the Production → Polish gate without one.
>
> Run `/qa-plan sprint` now, before starting any implementation. It takes one session and produces the test case requirements each story needs."

Use `AskUserQuestion`:
- Prompt: "No QA plan found for this sprint. How do you want to proceed?"
- Options:
  - `[A] Run /qa-plan sprint now — I'll do that before starting implementation (Recommended)`
  - `[B] Skip for now — I understand QA sign-off will be blocked at the Production → Polish gate`

If [A]: close with "Sprint plan written. Run `/qa-plan sprint` next — then begin implementation."
If [B]: add a warning block to the sprint plan document:

```markdown
> ⚠️ **No QA Plan**: This sprint was started without a QA plan. Run `/qa-plan sprint`
> before the last story is implemented. The Production → Polish gate requires a QA
> sign-off report, which requires a QA plan.
```

---

## Phase 6: Next Steps

After the sprint plan is written and QA plan status is resolved:

- `/qa-plan sprint` — **required before implementation begins** — defines test cases per story so developers implement against QA specs, not a blank slate
- `/story-readiness [story-file]` — validate a story is ready before starting it
- `/dev-story [story-file]` — begin implementing the first story
- `/sprint-status` — check progress mid-sprint
- `/scope-check [epic]` — verify no scope creep before implementation begins

**Review mode configuration:** All director gates (producer feasibility, QA review, code review) respect the project review mode. The review mode is set in Phase 0 when the file does not exist (for `new` sprints), or can be overridden per-run with `--review full|lean|solo` as an argument. The file `production/review-mode.txt` contains one of:
- `lean` — skip automated director gates (default if file is absent — fastest for solo dev)
- `full` — run all director gates as spawned sub-agents
- `solo` — skip all gates unconditionally (single-developer, no review)

This file is read by `/sprint-plan`, `/story-readiness`, `/story-done`, and other skills at startup.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…