Translate a finalized plan into Beads epics and issues with clear dependencies, design notes, and parallelization. Use when asked to file Beads from a plan/spec (OpenSpec, PRD, design doc), or when converting an external plan into a detailed Beads tracking structure.
Installs into .claude/skills of the current project.
Are you the author of Beads Create?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/david-li0406-beads-create)
---
name: beads-create
description: Translate a finalized plan into Beads epics and issues with clear dependencies, design notes, and parallelization. Use when asked to file Beads from a plan/spec (OpenSpec, PRD, design doc), or when converting an external plan into a detailed Beads tracking structure.
---
# Beads Create
Use this skill to import a plan into Beads as a well-structured set of epics and issues.
## Workflow
1. **Load beads guidance if needed**
- If bd CLI usage or bead structure is unclear, read `/Users/btraut/Development/skills-external/beads/SKILL.md` and follow its session protocol.
2. **Confirm the plan is ready**
- Ensure there is a finalized plan or spec outside Beads.
- If the plan is still fuzzy, ask for revisions first and iterate up to 5 times before importing.
3. **Translate the plan into Beads structure**
- Create epics that map to major milestones or deliverables.
- Create issues for concrete, implementable tasks.
- Add dependencies, ordering constraints, and opportunities for parallel work.
4. **Add implementation detail**
- Include design notes, assumptions, and acceptance criteria on each issue.
- Make tasks small and unambiguous so a fresh agent can pick up a single issue.
5. **Hand off to review**
- Recommend running the `beads-review` skill to proofread and polish the filed beads.
6. **Restart the agent**
- Finish this task, then stop. Encourage a fresh agent for the next task to keep sessions small.
## Output expectations
- Provide a concise mapping of epics and issues you created.
- Call out any dependencies or blockers that need user confirmation.
- If asked to iterate beyond 5 plan revisions, say you do not think it can be improved further.