Use when planning a UIST cycle end to end — the late-March abstract and paper deadlines, the ten-week build-freeze before video production, the rebuttal window, conditional acceptance, the July camera-ready, adjunct-track parallel lanes, and the November conference — with owners and risk buffers.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill uist-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Uist Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-uist-workflow)More formats (shields.io, HTML) on the badges page.
---
name: uist-workflow
description: Use when planning a UIST cycle end to end — the late-March abstract and paper deadlines, the ten-week build-freeze before video production, the rebuttal window, conditional acceptance, the July camera-ready, adjunct-track parallel lanes, and the November conference — with owners and risk buffers.
---
# UIST Workflow
A UIST year is engineered backwards from two fixed points: the paper deadline in late
March and the conference in the fall. Between them sits a pipeline with almost no
slack for hardware failures, video production, or study scheduling. This skill turns
the cycle into a managed project. All dates below are the verified 2026 numbers
(checked 2026-07-08); reopen `uist.acm.org/<year>/cfp/` before committing a calendar.
## The 2026 reference calendar
| Date (2026) | Event | Author obligation |
|---|---|---|
| Mar 24 | Abstract deadline (AoE) | Title, abstract, authors, track metadata in PCS |
| Mar 31 | Paper deadline (AoE) | PDF + video figure + supplementary, all anonymous |
| May 28 - Jun 5 | Rebuttal window | 5,000-character self-contained response |
| Jun 27 | Notification | Decisions are conditional on rebuttal-promised changes |
| Jul 24 | Camera-ready | TAPS source, alt text, final video, +10% page allowance |
| Nov 2 | Doctoral Symposium (in person) | Separate track, separate deadline |
| Nov 2-5 | Conference, Detroit | Talk + (typically) live demo of the system |
As of 2026-07-08 the live obligations are the camera-ready chain for accepted papers
and the adjunct tracks (Demos, Posters — deadlines 待核实, read the CFP) for everyone
else; new submissions target the 2027 cycle.
## Backwards plan for a systems paper
Work in reverse from the paper deadline; the ordering below is where UIST projects
actually fail, not a generic writing schedule:
1. **T minus 0-1 weeks — submission mechanics.** PCS uploads, anonymity sweeps,
abstract-field consistency (see `uist-submission`).
2. **T minus 1-3 weeks — video figure production.** Scripting, capture, edit,
captions, anonymization. The video cannot be shot until the system is stable, and
it competes with the writing for the same people (see `uist-supplementary`).
3. **T minus 3-6 weeks — evaluation.** Technical benchmarks and any user study; IRB
approval must predate this window, so file it in the fall.
4. **T minus 6-10 weeks — feature freeze.** Everything demonstrated in the paper
must exist by here. Features added after freeze belong to the next paper.
5. **T minus 10+ weeks — build.** Include one full hardware re-spin or one major
refactor in the estimate, because there will be one.
## Owners and risk register
Assign names, not roles, and write the mitigation before the risk fires:
```text
RISK OWNER MITIGATION
Hardware breaks in video week <name> Build two units; film B-roll early
Study participants no-show <name> Over-recruit 30%; pilot in freeze week
Video render/caption pipeline <name> Dry-run export at T-3w with dummy edit
Page-limit overflow (10pp body) <name> Appendix plan agreed at T-4w
Rebuttal week hits a holiday <name> Pre-draft objection playbook (uist-author-response)
Camera-ready owner on vacation <name> TAPS + alt-text buddy named at notification
```
## The two parallel lanes
UIST is one conference with two archival containers, and a healthy group uses both:
- **Papers lane** (main proceedings): the full pipeline above.
- **Adjunct lane** (Demos, Posters — separate chairs, separate deadlines, adjunct
proceedings): a rejected paper's system can still appear at the conference as a
demo; early-stage work can test community reaction as a poster; the same work must
not be submitted to both Demos and Posters (the 2026 rule converts it to a demo and
drops the poster). Decide the fallback lane on notification day, not after the
adjunct deadlines pass.
## Planning UIST 2027 from a mid-2026 vantage
For teams reading this in the live window (post-notification 2026), the next Papers
deadline is roughly nine months out and the calendar is not yet published (待核实 —
watch the 2027 site from its first announcement). Provisional planning rules that
survive cycle drift:
- Assume the abstract/paper pair lands in **late March ± a few weeks** and the
conference in the fall; anchor the feature-freeze ten weeks before the assumed
deadline and adjust when the real dates post.
- Anything involving **human subjects** needs ethics approval filed by roughly
December; anything involving **custom hardware** needs its final revision ordered
by January (fab and shipping queues do not respect AoE).
- Book **video-production capacity** — the person, the rig, the edit suite — for
the two pre-deadline weeks now; it is the least substitutable resource in the
pipeline.
- Draft the **contribution list before the spring**: if you cannot write three
capability claims in January, the project is a 2028 paper wearing a 2027 badge.
## The month-by-month cadence (generic UIST year)
| Months before deadline | Focus |
|---|---|
| 9-7 | Routing decision, system architecture, ethics filing |
| 7-4 | Core build; related-work sweep running in parallel |
| 4-2.5 | Feature freeze; evaluation harness and pilots |
| 2.5-1 | Studies and technical characterization; paper skeleton |
| 1-0.5 | Video production; full drafts circulating |
| 0.5-0 | Submission mechanics only — nothing new enters the paper |
## Between cycles
- File a post-mortem within two weeks of notification while reviews are fresh:
which review criticism was predictable at freeze time?
- Convert the submission's infrastructure — build scripts, benchmark harnesses,
capture rigs — into reusable lab property; UIST groups compound or burn out on
exactly this.
- Watch the next edition's site from its first announcement: dates shift by weeks
between editions and the length rules have changed across recent cycles.
## Output format
```text
[Cycle target] UIST <year> papers / demos / posters / DS
[Today's phase] build / freeze / evaluation / video / submission / review / rebuttal / camera-ready / conference prep
[Critical path] <the single task that moves the finish date>
[Risk register] top three, each with named owner
[Next fixed date] <date + obligation>
```