Use when planning an ACM SoCC project timeline from venue fit through the two-round abstract+paper deadlines, the rebuttal, notification, camera-ready, and presentation, with backward-planning offsets for a cloud-systems measurement paper and honest handling of the two-rounds-per-year cadence and the no-cross-round-resubmission rule.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill socc-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Socc Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-socc-workflow)More formats (shields.io, HTML) on the badges page.
---
name: socc-workflow
description: Use when planning an ACM SoCC project timeline from venue fit through the two-round abstract+paper deadlines, the rebuttal, notification, camera-ready, and presentation, with backward-planning offsets for a cloud-systems measurement paper and honest handling of the two-rounds-per-year cadence and the no-cross-round-resubmission rule.
---
# SoCC Workflow
Use this as the project-management skill for a SoCC submission. Replace every date with the current
official timetable and work backwards from the **round's abstract-registration cutoff** — which
precedes the paper deadline by about a week. SoCC — the ACM Symposium on Cloud Computing, jointly
sponsored by SIGMOD and SIGOPS — runs **two review rounds per year**, so the first planning
decision is *which round* you are genuinely ready for.
SoCC is a conference with **no standing editor-in-chief**; its rotating leadership is the
per-edition **General Chair(s)** and **Program Committee Co-Chairs** appointed under SIGMOD and
SIGOPS (SoCC 2026 PC Co-Chairs reported as Eric Lo and Ivan Beschastnikh, verified 2026-07-09 via
committee-page rendering; confirm on the live page). The cost model is conference registration; at
least one author presents.
## Milestones
- **Venue fit:** confirm SoCC over OSDI/NSDI/EuroSys/ATC and over SIGMOD/VLDB
(`socc-topic-selection`), and confirm the contribution spans the systems-and-data intersection.
- **Evidence lock:** freeze the system/mechanism, the testbed or trace, the workloads, the
baselines, and the measurement pipeline.
- **Round choice:** pick Round 1 or Round 2 knowing a Round-1 reject **cannot** be resubmitted to
Round 2 the same year.
- **Abstract registration:** submit real title, abstract, authors, subject tags, and conflicts by
the round's abstract cutoff.
- **Submission:** upload the anonymized acmart PDF and (where possible) the artifact link by the
round's paper deadline (AoE).
- **Rebuttal:** during the round's author-response window, answer reviewers on the axes they raised.
- **Notification:** accept / reject for that round; archive reviews, rebuttal, and every version.
- **Acceptance:** prepare the camera-ready, pursue ACM artifact badges if the edition offers
evaluation, register, and present in Singapore (SoCC 2026).
## Backward plan from a round's paper deadline
| Weeks out (heuristic) | Cloud-systems milestone |
|---|---|
| 10+ | System/mechanism feature-frozen; testbed or trace and baselines chosen |
| 8 | Experiments running; measurement harness logs throughput, latency, tail, and cost |
| 6 | Analysis done; cost-latency and tail results computed; baselines tuned with a documented budget |
| 4 | Full draft in acmart sigconf; artifact (trace-replay/testbed scripts) assembled and anonymized |
| 3 | Internal mock review by a systems reader and a data/measurement reader |
| 2 | Tail and cost results hardened; related-work delta sharpened; 12-page budget met |
| 1 | Dual-anonymous sweep on PDF and artifact (traces, cluster names, system names) |
| 0 | Abstract registered by its earlier cutoff, then paper + artifact link on HotCRP |
These offsets are planning heuristics only — anchor every one to the current Important Dates /
HotCRP deadlines page, never to a previous cycle's calendar.
## Two-rounds-per-year: the honest calendar reality
SoCC's twin-round model is a genuine advantage and a trap:
- **Advantage:** there are **two shots per calendar year** at the same venue (a winter/February
round and a summer/July round for SoCC 2026), so a paper that misses one round is only months
from the next.
- **Trap:** a paper **rejected in Round 1 may not be resubmitted to Round 2** the same year, so a
rushed Round-1 submission does not buy a discounted retry — it costs you the year at SoCC. Submit
to the round you can make *strong*, not merely the nearer one.
- As of 2026-07-09, the live target is **SoCC 2026 Round 2** (paper 14 Jul 2026); Round 1 (13 Feb
2026) has passed.
## Failure modes by stage
- **Evidence still moving at week 4** forces last-minute measurement nobody has audited — the
classic soundness reject for a systems paper.
- **Simulation-only at submission** invites the "does it hold on a real testbed?" reject from both
sponsoring communities.
- **Reporting only the mean** — omitting tail latency and cost — reads as not understanding what a
cloud paper is judged on.
- **Leaving the anonymized trace/artifact to the final week** is how a cluster name or provider
hint leaks identity under dual-anonymous review.
- **Treating Round 1 as a free draft** and getting rejected forfeits the whole SoCC year.
## Coordination notes
- Assign one owner for the measurement harness and reproducibility package and another for the
dual-anonymous sweep; shared ownership is how both slip.
- Archive the exact submitted PDF and artifact — the rebuttal must quote the paper precisely and
stay anonymous.
## Output format
```text
[Current stage] idea / evidence / round-choice / submitted / rebuttal / accepted
[Target round] round 1 / round 2, with the next official deadline and source
[Critical path] <three tasks that determine readiness>
[Risk register] <page budget / anonymity / simulation-vs-testbed / tail+cost evidence / artifact>
[Owner map] <task -> person or role>
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!