Use when reasoning about how a SIGMOD research paper moves through a PACMMOD round, covering double-anonymous CMT reviewing, the author feedback phase, accept/reject/revision verdicts, the one-month revision window, the 12-month rejection embargo, and how database PC members actually weigh evidence.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill sigmod-review-process --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Sigmod Review Process?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-sigmod-review-process)More formats (shields.io, HTML) on the badges page.
---
name: sigmod-review-process
description: Use when reasoning about how a SIGMOD research paper moves through a PACMMOD round, covering double-anonymous CMT reviewing, the author feedback phase, accept/reject/revision verdicts, the one-month revision window, the 12-month rejection embargo, and how database PC members actually weigh evidence.
---
# SIGMOD Review Process
A SIGMOD research submission enters a journal pipeline with a conference
cadence: papers submitted to a PACMMOD round are reviewed double-anonymously
through Microsoft CMT, authors get a mid-round feedback window, and the first
verdict is three-valued — accept, reject, or revise. Understanding which
lever moves which outcome is most of review-stage strategy. Mechanics shift
by cycle; reconfirm against the live CFP before relying on any date.
## Anatomy of a round (SIGMOD 2027 Round 3 as the concrete case)
```text
Jul 10, 2026 Abstract + conflict declarations close
Jul 17, 2026 Paper deadline (11:59 PM AoE)
Sep 10-17 Author feedback phase: reviews visible, short reply window
Oct 19, 2026 Verdict: accept / reject / major or minor revision
Nov 19, 2026 Revised paper + 4-page letter due (revision cases)
Dec 12, 2026 Final accept/reject on revisions
```
Roughly three months from PDF to first verdict, five to final — faster than
most journals, slower than a rebuttal-only conference, and repeatable four
times a year.
## The three verdicts, decoded
| Verdict | What it means operationally | Author's real decision |
|---|---|---|
| Accept | Into the round's PACMMOD issue; camera-ready port begins | None — execute |
| Revision (minor/major) | A contract: enumerated requirements, +1 page, one month | Can every requirement land in 30 days? |
| Reject | 12-month embargo from SIGMOD research track (≈3 rounds) | PVLDB / ICDE / rework, not a quick resubmit |
Two consequences deserve emphasis. First, a revision verdict is genuinely
winnable — the requirements are written down, and reviewers judge compliance
rather than re-litigating taste. Second, the embargo makes "just resubmit
next round" impossible, so a rejected SIGMOD paper's next stop is usually a
different venue (see `sigmod-topic-selection`).
## Who is reading
The PC is dominated by database systems researchers and industrial engine
builders. Predictable evaluation reflexes:
- They benchmark mentally: the first skim looks for the workload table and
the hardware paragraph before the design section gets full attention.
- They know the baselines personally — sometimes literally, as authors or
maintainers — so an untuned competitor is recognized on sight.
- Architecture claims are audited against systems they have built:
"this cannot be lock-free as described" is a common decisive comment.
- Novelty is measured against both recent PACMMOD/PVLDB output and decades
of systems history; rediscovering a 1990s technique under a new name is a
classic kill.
## Feedback phase leverage
The mid-round window is short and asymmetric: reviewers have already scored,
and you are trying to change specific minds before the PC discussion. Highest
expected value, in order: correcting an outright factual misreading;
answering a direct question with a pointer to a specific table; resolving an
apparent contradiction between two of your own sections. Near-zero value:
arguing significance, promising future work, or thanking reviewers at length
inside a tight character budget.
## Reading a split panel
- One detailed negative review plus shallow positives → the verdict follows
the detailed one; answer it line by line in the feedback phase.
- Universal "interesting but evaluation thin" → expect major revision;
start the missing experiments before the verdict arrives.
- A correctness objection from a builder of a rival system → treat as the
round's decisive issue even if other scores are high.
- Complaints about clarity of the problem statement → often masks a fit
problem; consider whether the framing buried the data-management core.
## Round vocabulary, decoded
Terms that trip up newcomers to the PACMMOD model:
- **Round** — one of the year's submission batches; your paper lives its
whole life inside a single round unless rejected.
- **Issue** — the PACMMOD journal number your round's acceptances publish
in; citable independently of the conference.
- **Feedback phase** — the mid-round reply window; not a rebuttal in the
score-flipping sense, and not the revision.
- **Revision** — a formal verdict with enumerated requirements, not an
informal second chance; compliance is what gets re-reviewed.
- **Embargo** — the 12-month bar on returning to the research track after
rejection or late withdrawal.
- **Shepherd** — when assigned, the PC member who verifies promised
camera-ready changes; treat their notes as binding.
## Etiquette with teeth
Confidentiality and anonymity bind for the whole round: no tweeting the
submission, no updating a named preprint mid-round in a way that links to
the anonymous version, no contacting suspected reviewers. Violations here
are policy matters for chairs, not style points.
## After the final decision
Close the loop regardless of outcome. On acceptance, archive the full
review thread beside the paper — the shepherding and ARI stages quote it.
On rejection, hold a one-hour post-mortem within a week while memory is
fresh: classify each objection as fixable-evidence, fixable-writing, or
fit, and let that classification pick the next venue rather than pride or
sunk cost. Reviews from a SIGMOD round are unusually actionable input for
a PVLDB or ICDE resubmission precisely because the reviewer pools overlap.
## Output format
```text
[Round position] submitted / feedback window / awaiting verdict / revising
[Panel read] per-reviewer stance and the decisive reviewer
[Verdict forecast] accept / revision / reject, with the driving issue
[Feedback plan] top corrections worth the character budget
[Revision feasibility] 30-day workload if a revision lands
[Embargo contingency] next venue if rejected
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!