Use when planning an IEEE PerCom project timeline from venue fit through paper registration, the September submission, the early-rejection gate, the bounded rebuttal, the IEEE Xplore camera-ready, and in-person presentation, with backward-planning offsets for a human-subjects sensing paper and honest handling of the single-annual-deadline cycle.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill percom-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Percom Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-percom-workflow)More formats (shields.io, HTML) on the badges page.
---
name: percom-workflow
description: Use when planning an IEEE PerCom project timeline from venue fit through paper registration, the September submission, the early-rejection gate, the bounded rebuttal, the IEEE Xplore camera-ready, and in-person presentation, with backward-planning offsets for a human-subjects sensing paper and honest handling of the single-annual-deadline cycle.
---
# PerCom Workflow
Use this as the project-management skill for a PerCom submission. Replace every date with the
current official timetable and work backwards from the HotCRP **registration** cutoff — which
precedes the paper deadline by about a week. PerCom runs a **single annual deadline** feeding one
review round with a **bounded rebuttal** and an **early-rejection gate**; there is no journal-style
revision, so plan for the paper to be complete at submission.
PerCom is an IEEE Computer Society conference: it has **no standing editor-in-chief** and **no APC**
in the open-access sense. Rotating leadership is the per-edition General and TPC (Program) Co-Chairs
(PerCom 2027 full roster **待核实** as of 2026-07-09), and the cost model is IEEE registration with
at least one author presenting **in person**.
## Milestones
- **Venue fit:** confirm PerCom over ACM UbiComp/IMWUT, MobiCom, SenSys, or IPSN, and confirm the
paper is ready this cycle (`percom-topic-selection`).
- **Data collection lock:** IRB/consent secured, subjects recruited, sensing protocol frozen — the
long pole for a human-subjects paper.
- **Evidence lock:** freeze claims, cross-subject splits, baselines, metrics, limitations, and the
dataset contents. Nothing can be added in the rebuttal.
- **Registration:** submit real title, abstract, authors, topics by the earlier registration
deadline (PerCom 2027: 4 Sep 2026).
- **Submission:** upload the anonymized PDF and the open-data plan (PerCom 2027: 11 Sep 2026 AoE).
- **Early-rejection gate:** notification (~20 Nov 2026) either early-rejects or invites a rebuttal.
- **Rebuttal (if invited):** answer explicit reviewer questions from existing evidence, anonymously
(~26 Nov 2026).
- **Decision:** accept/reject (~18 Dec 2026); archive reviews, rebuttal, and every submitted
version.
- **Acceptance:** prepare the IEEE Xplore camera-ready (PDF eXpress, eCopyright, ORCID), deposit the
de-identified dataset, register, and present in person.
## Backward plan from the submission deadline
| Weeks out (heuristic) | Human-subjects sensing milestone |
|---|---|
| 16+ | IRB/consent approved; recruitment and data collection begun (the long pole) |
| 12 | Data collection complete; labeling protocol run with annotator agreement |
| 10 | Claims fixed; cross-subject (LOSO) splits and baselines chosen |
| 8 | Experiments complete; F1/event-level results with per-subject spread computed |
| 6 | Analysis done; limitations drafted alongside results; dataset de-identified |
| 4 | Full draft in the IEEEtran 9+1 template; artifact assembled and anonymized |
| 3 | Internal mock review by a ubicomp reader ("is this within-subject only?") |
| 2 | Limitations hardened, related-work delta sharpened, 9-page budget met |
| 1 | Double-blind sweep on PDF and dataset link; open-data plan final |
| 0 | Registration by its earlier cutoff, then paper + dataset link on HotCRP |
These offsets are planning heuristics only — anchor every one to the current Important Dates page,
never to a previous cycle's calendar. Note the **16-week IRB/collection pole**: human-subjects data
cannot be rushed in the final month.
## Cycle reality: one shot per year, gated early
PerCom runs one annual research deadline. As of 2026-07-09, PerCom 2026 (Pisa) has concluded, so the
live next target is **PerCom 2027** (Goa; deadline 11 Sep 2026). Two planning consequences:
- **There is no revision cycle.** A paper that is not complete — especially one lacking cross-subject
evidence — cannot be rescued in the rebuttal; it will likely be early-rejected. Finish the
evaluation before submitting.
- **Missing the annual deadline costs roughly a year** at PerCom; ACM **IMWUT** has rolling
quarterly deadlines and a revise cycle, so a paper that needs another round of experiments may be
better routed there than held for a year — factor that into routing rather than idling.
## Failure modes by stage
- **IRB or recruitment slipping** pushes data collection into the final month and forces a
within-subject-only evaluation — the classic PerCom early-reject in the making.
- **Discovering at week 3 that the split was within-subject** is fatal with no time to recollect;
design the LOSO split at week 10.
- **Leaving the anonymized dataset to the final week** is how a testbed name, a re-identifying photo,
or an owner string leaks identity under double-blind review.
- **Skipping the mock review** forfeits the one chance to hear "your evaluation is within-subject"
from a friend instead of a reviewer — and there is no revision to fix it.
- **Treating the rebuttal as a revision** and planning to "add the experiment then" — the process
neither expects nor permits it.
## Coordination notes
- Assign one owner for IRB/consent and the dataset, and another for the double-blind anonymity
sweep; shared ownership is how both slip.
- Archive the exact submitted PDF, dataset, and (later) rebuttal — the discussion must quote them
precisely and stay anonymous.
## Output format
```text
[Current stage] idea / IRB+collection / evidence / writing / registration / submitted / rebuttal / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness -- IRB/collection is usually one>
[Risk register] <IRB / cross-subject evaluation / 9-page budget / anonymity / dataset / presentation>
[Owner map] <task -> person or role>
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!