Use when understanding how Journal of the Academy of Marketing Science (JAMS) review and decisions work — the Springer Editorial Manager flow, the double-anonymized developmental review, the area-editor structure, the dual theory-and-managerial evaluation bar, and how to read a decision letter. Explains the process and reads the letter; it does not draft the response (jams-rebuttal).
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill jams-review-process --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Jams Review Process?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-jams-review-process)More formats (shields.io, HTML) on the badges page.
---
name: jams-review-process
description: Use when understanding how Journal of the Academy of Marketing Science (JAMS) review and decisions work — the Springer Editorial Manager flow, the double-anonymized developmental review, the area-editor structure, the dual theory-and-managerial evaluation bar, and how to read a decision letter. Explains the process and reads the letter; it does not draft the response (jams-rebuttal).
---
# Review Process (jams-review-process)
## When to trigger
- Before submitting, to set realistic expectations about JAMS review
- A decision letter arrived and you need to interpret it before responding
- You are unsure who decides at JAMS and what reviewers are told to weigh
- You want to know what conditional acceptance triggers (data/code deposit)
## How JAMS review works
- **Double-anonymized.** Authors and reviewers are concealed from each other; keep every round anonymized, including revised files and any preregistration links.
- **Developmental philosophy.** JAMS, like the AMS journals, runs a **developmental review** — area editors and reviewers aim to improve promising papers across rounds, not merely gatekeep. A well-run R&R is the realistic best case; first-round acceptance is essentially unheard of.
- **Decision structure.** Manuscripts are handled by an **Area / Associate Editor** under the Co-Editors-in-Chief (Stephanie M. Noble and Charles H. Noble, University of Tennessee, since June 2024 — verified 2026-06-22; re-verify the masthead before submission). Your keyword/area choices in Editorial Manager influence routing, so choose them to reach the right editor and reviewers.
- **What reviewers weigh.** JAMS's evaluation is **dual**: (1) a genuine **theoretical contribution** to a broad marketing-science question, and (2) a clear **managerial contribution** — what a decision maker should do. Expect probes on construct validity / CMV (survey), endogeneity / identification (secondary data), mechanism and power (experiments), and on whether the contribution is more than a new-context replication.
- **Integrity.** Springer plagiarism screening; no concurrent submission; research-data and ethics policies apply.
## Likely decisions
| Decision | What it means |
|---|---|
| Desk reject | Out of scope, not a broad marketing-science contribution, or no managerial relevance |
| Reject (after review) | Theoretical or managerial contribution, or identification/validity, judged insufficient |
| Major revision (R&R) | Promising core; substantial work required (often multi-round) |
| Minor revision | Contribution sound; targeted fixes |
| Conditional acceptance | Triggers final transparency steps — data/code availability statement and any required deposit |
## Reading the decision letter
- **Read the AE/editor letter first** — it states the path to acceptance and which concerns are decisive ("must address") versus secondary.
- **Cluster reviewer comments** by theme: theoretical contribution, managerial relevance, construct validity/measurement, identification/analysis, positioning, exposition.
- **Flag the gatekeeping themes** — any comment touching the **theoretical-contribution** or **managerial-relevance** bar is top priority; these are JAMS's twin gates.
- **Separate new-data/analysis requests from reframing requests** — they have very different timelines.
- **Anticipate transparency** — if nearing conditional acceptance, prepare the data/code availability statement and any repository deposit.
## Calibrate expectations before you submit
- **First-round R&R, not acceptance, is the goal.** JAMS's developmental review means most successful papers go through two or more revision rounds; budget months, not weeks, between rounds.
- **Desk-reject risk is highest on scope and relevance.** A paper that is narrow, modeling-first, purely consumer-psychology, or missing a managerial implication is the most common early casualty — fix fit (`jams-topic-selection`) before submitting.
- **Reviewer continuity matters.** The same reviewers usually see your revision, so a response that visibly addresses *their* concern (not a generic improvement) is what advances the paper.
- **Routing is partly in your hands.** Keyword and area-of-interest choices in Editorial Manager steer the manuscript toward an area editor whose domain matches the paper; a mismatch slows the process and risks an unsympathetic read.
## Where JAMS differs from the siblings' processes
- **vs. JM (AMA):** JM is double-anonymized via ScholarOne with a Coeditor structure and a hard page limit; JAMS runs on Springer Editorial Manager with an area-editor structure and article-type guidance rather than one fixed page cap.
- **vs. JMR:** JMR enforces exact three-digit p-values and a Web Appendix convention; JAMS emphasizes construct validity and the managerial contribution more than a single statistics-reporting rule.
- **vs. Marketing Science / JCR:** those weigh modeling rigor or consumer-theory depth respectively; JAMS will not accept a paper strong on one of those but thin on the managerial takeaway.
## After the decision: the immediate moves
- **Desk reject:** re-evaluate fit before resubmitting elsewhere — a scope/relevance desk reject usually means the paper needs `jams-topic-selection` and `jams-contribution-framing` work, not a quick reformat.
- **Reject after review:** mine the reports for the decisive flaw; if it is fixable (identification, validity, a missing study), the work may suit a sibling or a later JAMS resubmission as a new paper — but do not re-submit the same paper to JAMS without a fundamental change.
- **R&R (major/minor):** move straight to `jams-rebuttal`; revise the manuscript before drafting the letter, and lead with the editor's decisive concerns.
- **Conditional acceptance:** finalize the data/code availability statement and any repository deposit, confirm declarations, and complete the production checklist.
Throughout, keep the manuscript and all correspondence anonymized until a decision releases that requirement; reviewers see your revisions, and a slip that reveals identity can compromise the round.
## Checklist
- [ ] AE/editor letter parsed: decisive vs. secondary concerns identified
- [ ] Reviewer comments clustered by theme
- [ ] Theoretical-contribution and managerial-relevance comments flagged top priority
- [ ] New-data vs. reframing requests separated for timeline planning
- [ ] Validity/identification concerns (CMV, endogeneity) mapped to specific fixes
- [ ] Conditional-acceptance transparency steps anticipated (data/code statement)
## Anti-patterns
- Treating all reviewer comments as equal, ignoring the editor's stated priorities
- De-anonymizing yourself in a response or a revised file
- Reading a major R&R as a near-accept and doing superficial edits
- Neglecting the managerial-contribution comments because the theory comments feel weightier
- Deferring data/code-availability prep until after conditional acceptance
## Output format
```text
【Decision】desk reject / reject / major R&R / minor / conditional accept
【Editor priorities】must-address: [...]; secondary: [...]
【Comment clusters】theory / managerial / measurement / identification / positioning / exposition
【Gatekeeper flags】theoretical + managerial contribution comments: [...]
【New data vs. reframing】[...]
【Transparency next】data/code availability + deposit readiness: [...]
【Next step】jams-rebuttal
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!