Use to plan an ITCS campaign end to end on its single annual cycle — backward from the early-September deadline through the no-rebuttal review, the November notification, the LIPIcs camera-ready, and the January conference with its Graduating Bits session.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill itcs-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Itcs Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-itcs-workflow)More formats (shields.io, HTML) on the badges page.
---
name: itcs-workflow
description: Use to plan an ITCS campaign end to end on its single annual cycle — backward from the early-September deadline through the no-rebuttal review, the November notification, the LIPIcs camera-ready, and the January conference with its Graduating Bits session.
---
# ITCS Workflow
ITCS runs on **one annual cycle** with a distinctive rhythm: submit in **early September**, get a
**yes/no in November with no rebuttal in between**, and present the following **January**, with
open-access publication in **LIPIcs**. There is no second round, no revise-and-resubmit, and no
author-response phase, so the leverage is almost entirely *before* the deadline. Plan the year
backward from that September date. Every date below is the **ITCS 2026 snapshot** (Bocconi,
Milan); reopen the current call — see
[`../../resources/official-source-map.md`](../../resources/official-source-map.md).
## The single-cycle calendar (ITCS 2026 anchor)
| Phase | ITCS 2026 date | What actually happens |
|---|---|---|
| Abstract / registration | **4 Sep 2025** (7:59:59 PM EDT) | Title, abstract, authors, conflicts locked in HotCRP; the abstract drives PC bidding |
| Full-paper submission | **6 Sep 2025** (7:59:59 PM EDT) | Anonymized PDF with complete proofs uploaded |
| Reviewing (no rebuttal) | Sep-Oct 2025 | PC + external reviewers read; **no author-response phase** |
| Notification | **~10 Nov 2025** | Accept / reject; there is no Major Revision category |
| Camera-ready | Late 2025 (per call) | `lipics-v2021` class, de-anonymized, LIPIcs metadata |
| Conference | **27-30 Jan 2026** | Talks, Graduating Bits session, community mixing at Bocconi |
Because there is no rebuttal and no second deadline, treat the September upload as **final** in a
way authors from rebuttal venues underestimate: the paper must answer the reviewer's objections
on its own.
## Working backward from the deadline
```text
D-day (early Sep) : full paper, complete proofs, anonymized, uploaded and re-downloaded
D-2 days : abstract/registration + conflicts locked (earlier than the paper!)
D-1 to 2 weeks : full version to arXiv/ECCC/ePrint (encouraged; lightweight double-blind)
final proof-completeness pass (no "proof omitted" on a central claim)
D-3 to 4 weeks : freeze the model and definitions; polish the first-10-pages merits window
D-2 months : decide ITCS vs STOC/FOCS/SODA on the novelty axis (itcs-topic-selection)
```
The two commonest self-inflicted failures: (1) missing the **abstract/registration** cutoff,
which is ~2 days *before* the paper deadline — no registration, no submission slot; and (2)
carrying a rebuttal-venue mindset that leaves objections for "later," when there is no later.
## The no-rebuttal consequence, planned for
Since you cannot answer reviewers after they read, you must **answer them inside the paper**:
- Anticipate the "is this model empty/trivial?" question with an anchoring result up front.
- Anticipate the "is this actually new?" question with an honest related-work delta.
- Anticipate the "why should I care?" question with a first-page conceptual payoff.
- State scope and limitations yourself, so a reviewer does not raise them as your blind spot.
See [`itcs-author-response`](../itcs-author-response/SKILL.md) for how the *absence* of a rebuttal
reshapes strategy, and [`itcs-writing-style`](../itcs-writing-style/SKILL.md) for pre-empting
objections in the prose.
## After notification
- **Accept:** move to [`itcs-camera-ready`](../itcs-camera-ready/SKILL.md) — switch to
`lipics-v2021`, de-anonymize, complete ACM CCS / keywords / funding, and hit the LIPIcs
production deadline. Register at least one author to present. Consider submitting a Graduating
Bits talk if a coauthor is near graduation.
- **Reject:** there is no resubmission to a later ITCS round this year (single cycle). Route the
paper — often to STOC/FOCS/SODA on depth, or to a journal — via the table in
[`itcs-topic-selection`](../itcs-topic-selection/SKILL.md). The reviews, though not rebuttable,
are usually substantive; use them to sharpen the next submission.
## The Graduating Bits and community layer
ITCS is a **smaller-community** venue with a strong direction-setting culture. The **Graduating
Bits** session — short talks by researchers near graduation (on either side) presenting results,
plans, and themselves — is a fixture worth planning for if you or a coauthor is on the market. The
conference is as much about *seeding directions* as reporting finished work, which is why bold,
early ideas fare well here; budget time for the hallway and session conversations, not just the
talk.
## Reverify each cycle
- The exact abstract and paper deadlines, and the AoE/EDT timezone of the cutoff.
- Whether the current call still runs **no rebuttal** (the theory-venue norm, but confirm).
- The camera-ready deadline and the current LIPIcs class/version.
- The host, city, and dates — **ITCS 2027 is 待核实** as of 2026-07-09; do not carry Bocconi
forward.
## Output format
```text
[ITCS cycle status] on track / at risk
[Registration] title/abstract/authors/conflicts locked by the earlier cutoff? yes/no
[Paper] complete proofs present? anonymized? first-10-pages merits window done?
[Preprint] full version posted (arXiv/ECCC/ePrint)? yes/no
[Post-notification] accept -> camera-ready owner+date ; reject -> reroute target
[Calendar risks] <ordered, with dates before the early-September cutoff>
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!