Use when ISCA reviews arrive and the rebuttal-plus-revision window opens — triaging objections by what a three-week window can actually fix, deciding between textual rebuttal and a revised PDF with new experiments, structuring responses that arm a champion at the PC meeting, and avoiding window-burning mistakes.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill isca-author-response --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Isca Author Response?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-isca-author-response)More formats (shields.io, HTML) on the badges page.
---
name: isca-author-response
description: Use when ISCA reviews arrive and the rebuttal-plus-revision window opens — triaging objections by what a three-week window can actually fix, deciding between textual rebuttal and a revised PDF with new experiments, structuring responses that arm a champion at the PC meeting, and avoiding window-burning mistakes.
---
# ISCA Author Response
ISCA 2026 gave authors a combined **rebuttal/revision period, February 16 to
March 6** — three weeks in which the team could both argue and *change the
paper*. That design rewards teams that treat the window as an engineering sprint
with a triage phase, and punishes teams that spend it composing indignation.
Everything here assumes that verified 2026 structure; the 2027 window's
existence, length, and rules are 待核实 until the new CFP posts.
## Day 1-2: triage before any writing or computing
Read all reviews twice: once fast for temperature, once slow building the
objection ledger. Classify every distinct point:
| Class | Definition | Window response |
|---|---|---|
| **F** — factual error | Reviewer misread something present in the PDF | Quote page/section/figure; one sentence; zero new work |
| **E** — evidence gap, closable | Missing experiment your infrastructure can run in days | Run it; report in response; fold into revision if permitted |
| **E∞** — evidence gap, not closable | Needs silicon, months, or data you lack | Concede scope honestly; state what the existing evidence does cover |
| **D** — design objection | "This breaks under X" / "cost is understated" | Analyze X concretely; if real, add the limitation; if not, show why |
| **P** — premise objection | "This problem doesn't matter" | Strongest countermeasure is motivation data; if you have none beyond the paper, one calm paragraph and move on |
| **T** — taste | "I'd have designed it differently" | Acknowledge once; do not redesign the paper |
Then rank by *leverage*: an F held by two reviewers outranks an E held by one;
anything a likely champion needs to defend the paper outranks everything else
(`isca-review-process` explains why the champion is the audience).
## Day 2: freeze the experiment plan
Pick at most three new experiments — the ones that convert the highest-leverage
E-class objections into numbers. Assign owners and a hard finish date one week
before window close, leaving prose time. The classic window failure is five
half-finished experiments and a response that promises rather than shows.
```text
window-plan.md
R2.O3 (E, leverage=high) "no comparison vs LazyMerge at equal storage"
-> run: lazymerge @ 18KB/core, full suite; owner: MK; due Feb 27
R1.O1 (F, leverage=high) "warm-up unstated"
-> answer: §5.1 para 2, 50M inst; also add to config table in revision
R3.O2 (D, leverage=med) "decay threshold fragile"
-> run: sweep T in {2K..64K}; expect plateau; owner: JL; due Feb 25
R3.O5 (T, leverage=low) "why not epoch-based?"
-> one paragraph, cite §4.2 rationale; no experiment
```
## Writing the response document
Structure for committee reading, not reviewer combat:
1. **Opening block (5-6 lines):** thank, then list the concrete changes/results
produced during the window — the things a champion can repeat in the room.
2. **Per-objection sections keyed to review IDs**, highest-leverage first.
Each: restate the objection in one neutral line, answer with evidence
(number, table row, or PDF pointer), stop.
3. **Shared-objection consolidation:** answer once, cross-reference the copies —
it shows the committee the objection set is smaller than it looks.
Tone rules that survive contact with real committees: concede real limitations
in plain declarative sentences (concessions buy credibility that transfers to
your rebuttals); never speculate about reviewer expertise or identity; never
claim "all reviewers agree" about anything they don't.
## Using the revision half of the window
If the cycle permits an updated PDF (2026's window was named rebuttal/revision):
- Make surgical edits keyed to objections: the missing baseline column, the
config-table row, the limitation paragraph, the clarified walk-through.
- Do not restructure the paper — reviewers re-reading diff mentally against
their memory, and a rewritten paper resets their evaluation instead of
repairing it.
- Maintain a change log mapping edit → objection; if the process provides no
place to submit it, embed the mapping in the response document.
- Keep the paper inside all format rules; a revision that breaks the 11-page
budget converts goodwill into a violation. This is what the half-page of slack
from `isca-writing-style` was for.
## What not to spend the window on
- **New contributions.** Results beyond the paper's claimed scope read as a
different paper and invite "needs another round of review" — the phrase that
kills borderline papers.
- **Rebutting every sentence.** A 15-point response to a 3-objection review
buries your leverage. Committees skim; make the skim land the top three.
- **Premise litigation at length.** One paragraph of motivation defense with
data; more looks defensive and reads worse each repetition.
- **Simulator relitigating.** If a reviewer distrusts your instrument globally,
the fix is the validation anchor you either have (point to it) or don't
(concede and scope) — not an essay on simulation philosophy.
## Window-close checklist
- [ ] Every review ID answered or explicitly consolidated
- [ ] Top-3 objections answered with *numbers produced this window*
- [ ] All F-class errors corrected with pointers, tone neutral
- [ ] Revision (if permitted) diff-minimal, format-legal, change-mapped
- [ ] A colleague outside the project read the response cold and could state
your three key answers back to you
- [ ] Submitted with margin — the window closes AoE like everything else
## The three weeks on a calendar
Using the 2026 window (Feb 16 - Mar 6) as the shape:
| Days | Activity |
|---|---|
| 1-2 | Triage; objection ledger; leverage ranking; no computing yet |
| 2 | Experiment plan frozen: ≤3 runs, owners, due dates |
| 3-12 | Experiments execute; response skeleton drafted in parallel |
| 13-15 | Results in; response written against real numbers |
| 16-18 | Revision edits (if permitted), diff-minimal, format-checked |
| 19-20 | Cold read by an outside colleague; tone pass; consolidation pass |
| 21 | Submit with hours to spare, AoE-checked |
After the window, silence until decisions; outcome handling branches in
`isca-review-process`, and calendar context lives in `isca-workflow`. Verified
dates: `../../resources/official-source-map.md` (2026-07-08).
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!