Use when managing an INTERSPEECH project across the annual ISCA cycle — backward-planning from the late-February deadline through the update window, spring review, June notification, camera-ready and registration coupling, and the September–October conference, including what to do in the current post-decision phase and 2027 planning.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill interspeech-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Interspeech Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-interspeech-workflow)More formats (shields.io, HTML) on the badges page.
---
name: interspeech-workflow
description: Use when managing an INTERSPEECH project across the annual ISCA cycle — backward-planning from the late-February deadline through the update window, spring review, June notification, camera-ready and registration coupling, and the September–October conference, including what to do in the current post-decision phase and 2027 planning.
---
# INTERSPEECH Workflow
Interspeech runs one cycle per year with an unforgiving rhythm: a winter deadline,
a silent spring, a June verdict, and a Northern-autumn conference. This skill is
the project-management layer; every date below is the verified 2026 (Sydney)
calendar and must be swapped for the live one each cycle.
## The 2026 reference clock
| Date (2026) | Event | Owner's job |
|---|---|---|
| 17 Jan | CMT portal opens | metadata drafted, area chosen |
| 25 Feb | Paper deadline | PDF + frozen metadata in |
| 4 Mar | Paper-update close | sanctioned typo/figure pass done |
| ~24 Apr – 1 May | Rebuttal window (reported, 待核实) | response team on call |
| 5 Jun | Notification | triage meeting same week |
| 19 Jun | Camera-ready close | de-anonymized PDF + metadata |
| 15 Jul | Early-bird registration closes | author registration secured |
| 16 Aug | Standard registration closes | stragglers covered |
| 27 Sep – 1 Oct | Conference, Sydney | talk/poster + audio fallback ready |
## Where the cycle stands today (2026-07-08)
Mid-cycle, post-decision. Accepted teams: camera-ready is behind you; **early-bird
registration closes in one week** — that is the live deadline — then presentation
prep, artifact publication (`interspeech-camera-ready`,
`interspeech-artifact-evaluation`), and travel/visa for Sydney. Rejected or
unsubmitted teams: the 2027 cycle (São Paulo, 29 Aug – 2 Sep 2027) is the target;
expect a deadline in the same late-winter region but **treat the 2027 dates as
unpublished until the São Paulo site posts them**.
## Backward plan from any Interspeech deadline
Offsets that have survived contact with real teams; anchor them to live dates:
- **T−10 weeks**: claims frozen; corpus/split/licensing decisions final.
- **T−6 weeks**: main results table filled with *some* number in every cell — the
quality improves later, the design cannot.
- **T−4 weeks**: draft exists in the official paper kit (not a one-column doc —
the 4-page reality only shows in the template).
- **T−2 weeks**: internal review by one speech scientist *and* one engineer,
mirroring the reviewer mix; significance tests run.
- **T−1 week**: compression pass (`interspeech-writing-style`), anonymity sweep,
demo page frozen.
- **T**: submit half a day early; CMT queues at AoE cutoffs.
- **T+1 week**: proofread the submitted PDF; use the update window for repairs
only.
## Failure patterns by phase
- **Winter**: discovering at T−1 that the paper is 5.5 pages — compression is a
week of work, not a night (see the compression order in
`interspeech-writing-style`).
- **Spring silence**: team disbands; nobody owns the rebuttal when it lands.
Assign the response owner at submission time.
- **June**: acceptance euphoria eats the two-week camera-ready window; the
registration coupling (no registered author → no proceedings entry) surfaces in
August as a crisis.
- **September**: audio demos that only ever ran on the lab machine meet a
conference-hall AV chain. Rehearse playback; carry spectrogram fallbacks.
## Parallel-track decisions
- **Interspeech vs ICASSP double rhythm**: the sibling deadline (typically autumn
for ICASSP) means a rejected February idea has a fall retry — decide in June
whether reviews point to "fix and ICASSP" or "grow and Interspeech 2027".
- **Challenge alignment**: many Interspeech papers ride a challenge (CHiME,
VoxSRC, ASVspoof…); challenge timelines are their own clocks, published by each
organizer, and system-description papers have separate rules — verify per
challenge.
- **Journal extension**: an accepted 4-pager with leftover material has a
standard afterlife at TASLP / Computer Speech & Language / Speech Communication;
start the extension outline while the reviews are fresh.
## Standing owner map
Assign at kickoff, not at crisis:
- **Paper owner** — format, compression, the submitted PDF, the update-window
proofread.
- **Evidence owner** — experiment matrix, seeds, significance, scoring scripts.
- **Compliance owner** — anonymity sweep (PDF + demo page + repo), license
chain, policy checkboxes.
- **Rebuttal watcher** — has CMT credentials, watches the reported window, owns
the response draft calendar.
- **Logistics owner** — registration before the tier cutoffs, visa timelines,
AV rehearsal for the talk or poster QR codes.
One person can hold two hats; no hat may be unassigned. Every 2026 failure
pattern above maps to exactly one vacant hat.
## Minimal milestone ledger
```text
[frozen] claims / corpus / splits ........ T-10w owner: evidence
[in-kit] draft in official template ...... T-4w owner: paper
[reviewed] internal science+eng pass ....... T-2w owner: paper
[swept] anonymity + demo page frozen .... T-1w owner: compliance
[in] CMT submission confirmed ........ T owner: paper
[patched] update-window proofread ......... T+1w owner: paper
[watched] rebuttal window covered ......... spring owner: watcher
[final] camera-ready + registration ..... June owner: logistics
```
## Output format
```text
[Phase] pre-deadline / update-window / silent-spring / rebuttal /
post-decision / conference-run-up / post-conference
[Live deadline] <date + what it gates + source URL>
[Owner map] paper / rebuttal / camera-ready+registration / artifacts / talk
[Backward plan] next three offsets with dates
[Parallel tracks] ICASSP retry? challenge clock? journal extension?
[Risk now] <single most time-critical item>
```
Verified anchors and the 待核实 list live in
`resources/official-source-map.md` (checked 2026-07-08). ISCA rotates organizing
committees per edition — the Sydney team's choices (tracks, rebuttal shape,
attachment rules) do not bind São Paulo.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!