Use when explaining or planning around IEEE ICDE peer review: the two-round-per-edition structure, area-chair-coordinated assignment with at least three reviewers, two-phase reviewing with a possible Revise & Resubmit, single-blind dynamics, how a builder-heavy committee reads a systems paper, and how outcomes feed IEEE Xplore.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill icde-review-process --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Icde Review Process?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-icde-review-process)More formats (shields.io, HTML) on the badges page.
---
name: icde-review-process
description: Use when explaining or planning around IEEE ICDE peer review: the two-round-per-edition structure, area-chair-coordinated assignment with at least three reviewers, two-phase reviewing with a possible Revise & Resubmit, single-blind dynamics, how a builder-heavy committee reads a systems paper, and how outcomes feed IEEE Xplore.
---
# ICDE Review Process
Use this to reason about review-stage strategy. Reopen the current call, important-dates page,
and any reviewer instructions before making process claims; ICDE re-declares its review model
each edition.
## Process model
- ICDE takes research papers in **two rounds per edition** (ICDE 2027: ≈June and November).
Each paper draws **at least three reviewers**, coordinated by an **area chair** who
synthesizes the reviews into a recommendation.
- The ICDE 2026 model ran **two reviewing phases** inside a round: the first phase returned
**Revise & Resubmit, Accept, or Reject**; invited revisions were re-reviewed (≈4-week window)
before a final **Accept/Reject**. Whether the current edition keeps the R&R phase is
edition-specific (待核实).
- Review is **single-blind**: reviewers see author identity; authors do not see reviewers. This
changes the calculus — reputational priors exist, so the paper must earn belief on evidence,
not on names.
- A **Round 1 reject is terminal for the edition**; the paper cannot re-enter Round 2. That
raises the stakes on getting the evaluation right the first time.
- Accepted papers publish in **IEEE Xplore**; camera-ready compliance and IEEE metadata matter
as much as the acceptance itself.
## Who reviews here
- The committee is **builder-heavy**: reviewers who have implemented indexes, optimizers, and
storage engines. They read an evaluation the way an engineer reads a benchmark — skeptical of
untuned baselines, single-point results, and hidden costs.
- Because scope overlaps SIGMOD and VLDB, at least one reviewer will likely know the nearest
prior system intimately; a novelty claim that ignores it is caught, not skimmed past.
- Borderline systems papers usually fail on one of three edges: an untuned or unfair baseline, a
performance claim with no operating point, or a mechanism whose benefit is never isolated by
an ablation.
## Scoring leverage table
| Review dimension | What raises it | What sinks it |
|---|---|---|
| Novelty | A named mechanism a builder could not have trivially derived | "Yet another index" with no isolable new idea |
| Evaluation | Tuned baselines, scale curves, variance, disclosed cost | Single-point wins on one synthetic workload |
| Soundness | Ablations that isolate the mechanism's contribution | Gains that could come from unrelated engineering |
| Reproducibility | Runnable supplement whose availability is evident | Empty or unrunnable supplemental material |
| Significance | A primitive an ecosystem can adopt | A narrow tweak with no downstream reach |
## Stage-by-stage realism
- **Phase 1 reviews:** read them as the area chair will — is the central evaluation objection
answerable? A Revise & Resubmit is an opportunity, not a soft reject; treat the requirement
list as binding.
- **Revision re-review:** the same reviewers check the list; unrequested scope changes hurt.
- **Decision:** one unresolved fairness or cost objection outweighs several resolved clarity
nits, because a builder-heavy committee anchors on the evaluation.
- **Round choice as strategy:** since Round 1 rejects skip the edition, aiming an immature
evaluation at the earlier round is a common self-inflicted loss.
## Output format
```text
[Current stage] submitted / phase-1 reviews / revision / decision / camera-ready
[Round] Round 1 or Round 2 (edition)
[Decision actors] <reviewers / area chair / program chairs>
[Likely leverage] <novelty / evaluation / soundness / reproducibility>
[Central objection] <the one thing the area chair will weigh most>
[Next response move] <one action>
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!