Use when planning a USENIX FAST project timeline from venue fit through choosing a Spring or Fall deadline, double-blind submission, the author-response period, shepherding or a one-shot revision, artifact evaluation, and the open-access camera-ready, with backward-planning offsets tuned to storage evaluation and honest handling of the two-deadline cycle.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill fast-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Fast Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-fast-workflow)More formats (shields.io, HTML) on the badges page.
---
name: fast-workflow
description: Use when planning a USENIX FAST project timeline from venue fit through choosing a Spring or Fall deadline, double-blind submission, the author-response period, shepherding or a one-shot revision, artifact evaluation, and the open-access camera-ready, with backward-planning offsets tuned to storage evaluation and honest handling of the two-deadline cycle.
---
# FAST Workflow
Use this as the project-management skill for a FAST submission. Replace every date with the current
official timetable and work backwards from the deadline you choose. FAST — the USENIX Conference on
File and Storage Technologies — runs **two deadlines a year**, has an **author-response** period,
and can issue a **one-shot revision** that spans into the next deadline, so plan for a longer arc
than a plain accept/reject conference.
FAST is a USENIX conference: it has **no standing editor-in-chief** and **no article-processing
charge**. Rotating leadership is the per-edition Program Co-Chairs and the program committee, and
the cost model is registration plus USENIX membership — proceedings are open access. Chairs and the
Artifact Evaluation Committee rotate yearly; re-check the current committee page rather than carrying
a name forward (FAST '27 rosters: **待核实** beyond what the CFP names).
## Choose the deadline, then plan backward
FAST '27 offers **Spring** (submit 17 Mar 2026, notify 4 Jun 2026, final files 28 Jul 2026) and
**Fall** (submit 15 Sep 2026, notify 8 Dec 2026, final files 26 Jan 2027). Pick by *evidence
readiness* — storage measurements at steady state on real, aged devices take real calendar time —
not by whichever is nearest. As of 2026-07-09 the Spring round is notified and the live target is
the **Fall deadline, 15 Sep 2026**.
## Milestones
- **Venue fit:** confirm FAST over OSDI/ATC/EuroSys and that the core lesson is storage
(`fast-topic-selection`).
- **Evidence lock:** freeze the testbed (devices, firmware, kernel), the workloads/traces, the
device-state protocol (aging, fill, TRIM), the baselines, and the metrics.
- **Registration:** register real title, abstract, authors, topics, and conflicts on the *correct*
Spring/Fall HotCRP instance.
- **Submission:** upload the anonymized, double-blind PDF and the availability statement.
- **Author response:** during the response window, answer reviewer questions with existing evidence
or a concrete, feasible plan.
- **Decision:** Accept / Accept-with-shepherding / **One-shot Revision** / Reject.
- **Shepherding or one-shot revision (if issued):** make the required changes; a one-shot revision
may demand *new experiments* and is resubmitted at the next deadline.
- **Acceptance:** prepare the open-access camera-ready, pursue USENIX artifact badges on the AEC's
own timeline, register, and present.
## Backward plan from the submission deadline
| Weeks out (heuristic) | Storage-evaluation milestone |
|---|---|
| 12+ | Testbed fixed: device models/firmware, kernel, mkfs options; workloads/traces chosen |
| 10 | Device-state protocol locked (aging/preconditioning, fill level, TRIM); baselines built and tuned |
| 8 | Measurement runs complete at steady state; device counters (SMART/logs) captured; provenance logged |
| 6 | Analysis done; tail-latency distributions, write-amplification, endurance projections computed |
| 4 | Full draft in the USENIX template; artifact + trace-replay scripts assembled and anonymized |
| 3 | Internal mock review by a storage reader |
| 2 | Caveats hardened, related-work delta sharpened, page limit met |
| 1 | Double-blind sweep on PDF and artifact; availability statement final |
| 0 | Register the abstract on the correct HotCRP, then upload |
These offsets are planning heuristics only — anchor every one to the current Important Dates block,
never to a previous cycle's calendar. Note that storage runs (aging a drive, replaying a long trace,
an endurance test) can dominate the schedule; size them explicitly.
## The two-deadline reality and one-shot revision
- **Missing one deadline is not a lost year.** The other FAST deadline is months away — but so is a
sibling (OSDI/ATC/EuroSys) date; factor that into routing rather than idling.
- **A one-shot revision is a second full deadline, not a formality.** Its instructions can require
specific new experiments, the revised paper is re-read, and it can be rejected. Budget the
revision window like a fresh submission, and note the paper stays *under review at FAST* during it,
so it cannot go elsewhere in parallel.
## Failure modes by stage
- **Testbed still moving at week 6** forces last-minute measurements nobody audited — the classic
storage-soundness reject in the making.
- **Reporting fresh-out-of-box instead of steady-state** numbers invites the "did you precondition?"
objection that can sink an SSD paper.
- **Leaving the anonymized artifact and trace hosting to the final week** is how a device dump,
hostname, or personal trace URL leaks identity under double-blind.
- **Treating a one-shot revision as an accept** and under-budgeting its experiments turns a winnable
revision into a reject.
## Coordination notes
- Assign one owner for the testbed/provenance log and another for the double-blind sweep; shared
ownership is how both slip.
- Archive the exact submitted PDF, artifact, and (later) the response/revision documents — the
revision round must quote reviews precisely and stay anonymous.
## Output format
```text
[Current stage] idea / evidence / writing / registration / submitted / response / shepherd-or-revision / accepted
[Target deadline] Spring / Fall <date and source, or unknown>
[Critical path] <three tasks that determine readiness — often measurement-time-bound>
[Risk register] <page limit / anonymity / device state / provenance / tail latency / artifact>
[Owner map] <task -> person or role>
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!