Use to plan a full ACM/IEEE Design Automation Conference (DAC) Research-Manuscript campaign backward from the mid-to-late-November manuscript deadline through the two-stage abstract-then-manuscript submission on Softconf, the winter review, the March notification, the April camera-ready and copyright for the ACM Digital Library, and the July conference in Long Beach — with the Engineering-Track and Late-Breaking-Results side calendars.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill dac-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Dac Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-dac-workflow)More formats (shields.io, HTML) on the badges page.
---
name: dac-workflow
description: Use to plan a full ACM/IEEE Design Automation Conference (DAC) Research-Manuscript campaign backward from the mid-to-late-November manuscript deadline through the two-stage abstract-then-manuscript submission on Softconf, the winter review, the March notification, the April camera-ready and copyright for the ACM Digital Library, and the July conference in Long Beach — with the Engineering-Track and Late-Breaking-Results side calendars.
---
# DAC Workflow
Run the DAC year backward from the deadline. DAC's Research-Manuscript cycle is a **single annual
deadline in mid-to-late November** (DAC 2026: manuscript ~19 November 2025) leading to a **July**
conference (DAC 2026: Long Beach, California, 26-29 July 2026). Unlike the two-cycle software
venues, DAC gives you one archival shot per year, so the calendar is unforgiving. Every date below
is a **DAC 2026 snapshot** read on 2026-07-09; reopen the live event pages first
(`resources/official-source-map.md`).
## The two-stage submission (do not miss stage one)
DAC splits the research submission into **two stages on the Softconf/START system** (`dac26`):
- **Stage 1 — Abstract.** Register title, full abstract, and **all co-authors** roughly a week
before the manuscript deadline. This stage seeds reviewer assignment and conflict detection; if
you skip it, the system will not accept your PDF later.
- **Stage 2 — Manuscript.** Upload the anonymized 6+1-page PDF by the manuscript deadline. There is
**no grace period** to fix a malformed or non-anonymous PDF after the cutoff.
Register with the real title and abstract, not a placeholder — the abstract drives which TPC
members bid on and are assigned to your paper.
## The DAC 2026 research calendar (snapshot — verify each cycle)
```text
[~Nov 12, 2025] Abstract stage closes (title/abstract/co-authors on Softconf) 待核实 exact day
[Nov 19, 2025] Research Manuscript deadline (final anonymized 6+1 PDF) 待核实 exact day
[Nov 2025-Feb] Double-blind TPC review + program-committee discussion
[Feb 23, 2026] Accepted research-manuscript IDs published
[Mar 9, 2026] Accept / reject notifications
[Mar 23, 2026] Acceptance confirmation forms due
[Apr 14, 2026] Copyright form + final (proceedings) manuscript due — ACM DL camera-ready
[Jul 26-29, 2026] DAC 2026, Long Beach Convention Center — presentation + exhibition
```
Whether DAC 2026 runs an **author rebuttal / response period** between review and notification is
**待核实** — DAC's research review has historically been TPC-driven without the ISCA/MICRO-style
author response. Do not plan a rebuttal window into your calendar until the live cycle confirms one.
## Side calendars (different deadlines — do not conflate)
- **Engineering Track:** separate call, separate committee, later Call-for-Contributions deadline
(DAC 2026 extended to ~20 January 2026). Presentation-oriented; see `dac-topic-selection`.
- **Late Breaking Results (LBR):** short poster-style track on `softconf.com/dac26/lbr26`, deadline
in early 2026 (extended in past cycles into ~March). Good for a timely, early result that is not
yet an archival Research Manuscript.
- **Special Sessions / Panels / Tutorials / Workshops:** proposal-based, their own timelines.
## Backward plan from the November manuscript deadline
```text
[Deadline − 12 wk] Lock the contribution and the QoR claim; pick benchmark suites (ISPD/EPFL/
ISCAS/ITC/TAU/CircuitNet) and the baselines you must beat
[Deadline − 8 wk] Freeze the experimental harness; start the runs that take longest (full-flow
P&R, large-benchmark sweeps) — these cannot be compressed at the end
[Deadline − 4 wk] Full draft in the ACM double-column template; check the 6-page body budget early
[Deadline − 2 wk] Internal review; tighten to 6+1; build every figure at column width and legible
[Deadline − 1 wk] Complete the abstract stage on Softconf with the real title/abstract/co-authors
[Deadline − 3 day] Double-blind sweep on the PDF; re-run the headline numbers on a clean checkout
[Deadline − 1 day] Upload; re-download and read the PDF cold; confirm it is the intended file
```
## Between notification and camera-ready
- **Accept:** de-anonymize, apply the ACM template's final-version rules, complete metadata and the
copyright form, and hit the April proceedings deadline for the **ACM Digital Library** archival
version (`dac-camera-ready`).
- **Reject:** DAC has no formal appeal; reroute promptly — **ICCAD** (fall), **DATE** (Europe),
**ASP-DAC** (January), or a journal (TCAD/TODAES) — using `dac-topic-selection`.
## Standing reminders
- One archival deadline a year: a missed November means a full year, so calendar the abstract stage,
not just the manuscript stage.
- The 6-page body budget is tight; plan the paper's argument to *fit* six double-column pages rather
than writing long and cutting.
- Track choice (Research vs Engineering) is a workflow decision made *before* the deadline, not a
fallback after rejection.
## Output format
```text
[Cycle target] DAC 20XX research manuscript / engineering track / LBR
[Abstract stage] locked by the earlier cutoff? yes/no
[Manuscript stage] on track for the November deadline? blockers?
[Longest runs] which experiments gate the deadline; started? yes/no
[Post-decision] camera-ready plan (ACM DL, April) or reroute target (ICCAD/DATE/ASP-DAC)
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!