Use when planning a CVPR submission campaign end to end, covering the November abstract/paper/supplement deadline chain, coauthor reviewer-duty scheduling, the January rebuttal sprint, February decisions, camera-ready and June conference logistics, and the resubmission ladder across ICCV, ECCV, and the next CVPR.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill cvpr-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Cvpr Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-cvpr-workflow)More formats (shields.io, HTML) on the badges page.
---
name: cvpr-workflow
description: Use when planning a CVPR submission campaign end to end, covering the November abstract/paper/supplement deadline chain, coauthor reviewer-duty scheduling, the January rebuttal sprint, February decisions, camera-ready and June conference logistics, and the resubmission ladder across ICCV, ECCV, and the next CVPR.
---
# CVPR Workflow
CVPR is an annual machine with one intake: in the 2026 cycle, abstracts November 6,
papers November 13, supplements November 20, rebuttal late January, decisions
February 20, conference June 3–7 in Denver. This skill turns that spine into a
project plan with owners, because CVPR deadline weeks are lost to coordination
failures more often than to science failures.
## Campaign calendar (2026-cycle anchors)
| When | Milestone | Owner discipline |
|---|---|---|
| T–10 weeks (early Sep) | Freeze scope: claims, benchmarks, baselines | PI + first author sign one paragraph |
| T–8 weeks | Experiment matrix running; recipe ledger live | Every table row has a config |
| T–6 weeks | First full draft; flip-test the figures | Co-authors annotate, don't rewrite |
| T–4 weeks (early Oct) | OpenReview profiles audited for every author | One named owner; new coauthors close the list |
| T–1 week (Nov 6) | **Abstract registered; profiles valid** | Desk-reject exposure if missed |
| Nov 13 | **Paper + CRF submitted** | Freeze 24h early; upload before the panic hour |
| Nov 20 | **Supplement uploaded** | Videos/code packaged per `cvpr-supplementary` |
| Dec – Jan 12 | Coauthors deliver their assigned reviews | Late reviews endanger *your* paper |
| Jan 22–29 | Reviews land; one-page rebuttal | Pre-book this week; nobody travels |
| Jan 30 – Feb 5 | Discussion (no author access) | Resist mailing the AC |
| Feb 20 | Decisions | Both branches pre-planned |
| Spring (待核实) | Camera-ready + dataset release due | See `cvpr-camera-ready` |
| Jun 3–7 | Conference (workshops 3–4, main 5–7 in 2026) | Poster/talk/travel logistics |
## The two windows people fail to defend
**Deadline fortnight (early November).** The supplement trailing the paper by a week
tempts teams to leave packaging "for week two" — then week two evaporates into video
rendering and code scrubbing. Rule: the supplement plan (what goes in, who builds it)
is written *before* the paper deadline; week two only executes it.
**Rebuttal week (late January).** Seven days, one page, all reviewers at once. Assign
roles when reviews drop, not after a day of group grief:
```yaml
# rebuttal-roles.yaml — filled within 12 hours of review release
reader: # summarizes all reviews neutrally, one page, no rebuttals yet
runner: # owns the 1-2 small requested experiments; hard stop at day 5
writer: # owns the single page; everyone else feeds bullets
adjudicator: # PI decides which objections get space, which get one line
deadline: # internal freeze 24h before OpenReview close
```
## Reviewer duty as a planned workload
Submitting enrolls qualifying authors into a 25k-reviewer pool, and undelivered or
irresponsible reviews can desk-reject every paper the offender authored (verified 2026
enforcement). Treat December–January reviewing as a scheduled deliverable: at
submission time, list which coauthors are likely reviewers, block their calendar for
review weeks, and have the group's senior authors sanity-check first-time reviewers'
drafts against the official reviewer guidelines.
## Multi-paper coordination
Most labs submit several papers into the same November wall, which multiplies the
process risks nonlinearly:
- **Shared coauthors, shared exposure**: one person's undelivered January review
endangers every paper they touch; the duty ledger must be lab-level, not
paper-level.
- **Conflict hygiene**: OpenReview conflicts must be complete across all submissions;
a stale institution on one profile pollutes assignments for the whole batch.
- **Compute contention**: rebuttal-week reserve GPU allocations collide when three
papers each promised "small requested experiments"; pre-negotiate priority order.
- **Internal review**: schedule lab-mates' cross-reads at T–10, not T–2 — at T–2
everyone is defending their own draft.
## The resubmission ladder
At a 25.42% acceptance rate, the rational plan covers rejection before it happens. The
CV calendar offers a clean ladder — CVPR (Nov) → ICCV (spring deadline, odd years) /
ECCV (spring deadline, even years) → WACV/3DV or back to CVPR. Rules for climbing:
- Bank the reviews: fix every factual objection before the next deadline; reviewer
pools overlap across CVF venues and repeat objections read badly (triage method in
`cvpr-review-process`).
- Mind the dual-submission windows: the CVPR attestation covered Nov 13 – Feb 20 in
2026; the next venue's window must not overlap a paper still under CVPR review.
- Re-check freshness: three months of arXiv can obsolete a comparison table; budget a
baseline-refresh pass, not just an edit pass.
## Deadline fortnight, day by day
The last two weeks compress badly when run ad hoc. A schedule that has survived
contact with real teams:
- **T–14 to T–10**: results freeze for the main table. New numbers after this go to
the supplement or the rebuttal, not the body.
- **T–10 to T–7**: full-draft pass; run the figure flip test with an outsider; final
baseline-freshness check against the leaderboard.
- **T–7 (abstract day)**: register the abstract, verify every profile renders as
complete when logged out of the authors' accounts, lock the author list.
- **T–6 to T–3**: claim-calibration pass (`cvpr-writing-style`), bibliography venue
verification (`cvpr-related-work`), CRF mandatory sections drafted.
- **T–2**: full mechanical sweep from `cvpr-submission`; internal freeze.
- **T–1**: upload; re-download; cold read. Nobody edits after upload day.
- **T to T+7 (supplement week)**: execute — do not design — the supplement plan;
identity-scan code and videos; upload at T+5, not T+7, to survive a failed render.
## Cycle-status note
As of 2026-07-08, CVPR 2026 has concluded and the CVPR 2027 cycle (Seattle, reported
around June 20–24, 2027) had published **no** CFP or deadlines. Every date above is a
2026-cycle anchor for planning shape only — reopen cvpr.thecvf.com the moment your team
commits, because the deadline chain (and things like the CRF) can change between
editions.
## Output format
```text
[Campaign stage] scoping / building / deadline-fortnight / in-review / rebuttal / decided
[Calendar] next 3 milestones with dates and owners
[Duty ledger] reviewing coauthors + calendar blocked: yes/no
[Risk register] top 3 (missed-profile, supplement drift, rebuttal roles, …)
[Plan B] next venue + its verified deadline
[Cycle check] current-year pages reopened on: <date>
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!