Use when planning an ATC (ACM SIGOPS Annual Technical Conference, formerly USENIX ATC) campaign end to end — running the year backward from the early-June deadline through the two review rounds, the rebuttal, conditional-acceptance shepherding, the post-acceptance artifact evaluation, and the ACM Open Access camera-ready for the November Hong Kong conference.
Scanned 9/5/2026
Install to Claude Code
npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill atc-workflow --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Atc Workflow?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/brycewang-stanford-atc-workflow)More formats (shields.io, HTML) on the badges page.
---
name: atc-workflow
description: Use when planning an ATC (ACM SIGOPS Annual Technical Conference, formerly USENIX ATC) campaign end to end — running the year backward from the early-June deadline through the two review rounds, the rebuttal, conditional-acceptance shepherding, the post-acceptance artifact evaluation, and the ACM Open Access camera-ready for the November Hong Kong conference.
---
# ATC Workflow
Plan the campaign backward from the deadline. ATC 2026 — the first **ACM SIGOPS** edition of the
former **USENIX ATC** — runs on a calendar and a review structure that both changed in the
transition: an **early-June 2026** submission deadline (AoE; 1 vs. 10 June unresolved across
renderings — 待核实), a **two-round, extended-abstract** review, **conditional acceptance with
shepherding**, a separate **artifact-evaluation** track, and the conference in **Hong Kong, 15-18
November 2026**. Reopen the SIGOPS call for the exact dates before committing to any of the offsets
below.
## The arc (backward from the deadline)
```text
[T-0 Submission] paired upload: 2-page extended abstract + full paper on atc26.hotcrp.com
[Round one] two reviewers judge each extended abstract; below-bar papers cut early
[Round two] 3-4 reviewers read the full paper of survivors
[Rebuttal] ~1 page: correct factual misreadings; note prior-submission changes if any
[Decision] conditional accept / reject
[Shepherding] a PC shepherd signs off required revisions before final acceptance
[Artifact evaluation] separate post-acceptance AEC track -> Available / Functional / Reproduced
[Camera-ready] de-anonymize, satisfy shepherd, ACM Open Access metadata + production checks
[Nov 15-18] present at the Hong Kong conference; talk video/slides per the venue norm
```
## Backward plan from the June deadline
- **T-10 to T-8 weeks:** lock the system and freeze the experiments. On a systems paper the testbed
and measurements are the long pole; leave prose churn for later. Pin environments now
(`atc-reproducibility`) — provenance cannot be reconstructed at the deadline.
- **T-6 weeks:** full-paper draft complete against `atc-writing-style`; baselines and honest costs
in place per `atc-experiments`.
- **T-3 weeks:** write and stress-test the **two-page extended abstract** — the round-one decision
surface. Have someone read *only* the abstract and tell you the problem, contribution, testbed,
and result. If they cannot, fix it.
- **T-2 weeks:** build the anonymized, runnable artifact and the claim-to-experiment map.
- **T-1 week:** double-blind sweep on the final PDF, abstract, and artifact; fill HotCRP fields and
conflicts; confirm the exact AoE deadline day.
- **T-0:** upload both the extended abstract and the paper; re-download and read cold.
## Between submission and decision
- **Round one is silent from your side** — there is no action between upload and the round-one cut;
the abstract is your entire round-one argument. Do not start major new experiments hoping to swap
in a stronger paper mid-cycle.
- **If you advance to round two,** prepare for the rebuttal: keep a running list of the measurements
and clarifications a skeptical reviewer would ask for, so the ~1-page window is spent well
(`atc-author-response`).
## After a conditional accept
- Treat the **shepherd's required revisions as binding**. Make each change or explicitly justify
declining it; the shepherd holds final acceptance until satisfied.
- Start the **artifact-evaluation** package immediately: the AEC track has its **own post-acceptance
deadline**, independent of the camera-ready (`atc-artifact-evaluation`). De-anonymize and archive
the artifact in a DOI-issuing repository for the Available badge.
- Prepare the **camera-ready**: de-anonymize the paper, fold in the shepherd's changes, and complete
**ACM Open Access** metadata (`atc-camera-ready`). Budget for the transition **APC**
(subsidized for 2026; exact figure per the ACM/SIGOPS terms).
## Calendar reconnaissance
```text
[Deadline] confirm the exact early-June AoE day on the SIGOPS call (1 vs 10 June — 待核实)
[Conference] Hong Kong (Hyatt, Shatin), Nov 15-18, 2026 — plan travel/visa early for HK
[Rotation] under SIGOPS, ATC rotates Asia/Europe/North America; next-year location differs
[Artifact] find the AEC submission date on the call for artifacts (separate from camera-ready)
[Backup] if rejected, line up OSDI/NSDI/EuroSys/FAST dates via atc-topic-selection
```
## Reverify each cycle
- The exact deadline day, notification/rebuttal dates, and camera-ready date.
- Whether the two-round extended-abstract model and the reviewer counts persist.
- Artifact-evaluation timing and the badge set; the Deployed Systems lane (**待核实**).
- ACM Open Access / APC terms; template file (USENIX vs. ACM) (**待核实**).
## Output format
```text
[ATC workflow stage] planning / drafting / abstract-hardening / submitted / round two / rebuttal / shepherding / artifact / camera-ready
[Critical path] the long-pole task (usually testbed + measurements, then the extended abstract)
[Deadline set] submission (early June AoE), rebuttal, shepherd sign-off, artifact, camera-ready
[Next action] the single most schedule-critical step, with a date
[Risk] the item most likely to slip (provenance pinning / abstract self-containment / shepherd changes)
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!