Installs into .claude/skills of the current project.
Are you the author of Risk Assessment?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/bromso-risk-assessment-7d6da286)
---
description: Score and prioritize security risks by likelihood and impact
---
# Risk Assessment
Score and prioritize security risks by likelihood and impact for "$ARGUMENTS". Combine inputs from threat models and vulnerability assessments into a unified risk register with treatment strategies and assigned ownership.
## Prerequisites
Read `.metapowers/security/$ARGUMENTS/00-govern.md`. If this file does not exist, tell the user:
> Phase 0 (Govern) has not been completed for "$ARGUMENTS". Run a Govern skill first (e.g., `/security:security-policy $ARGUMENTS`), or use `--skip-checks` to bypass.
If `--skip-checks` is present in $ARGUMENTS, skip this check and log to `.metapowers/security/$ARGUMENTS/skip-log.md`.
## Process
1. **Identify risks from available sources:**
- Review threat model findings (if available in `.metapowers/security/$ARGUMENTS/01-identify.md`)
- Review vulnerability assessment results (if available)
- Consider operational risks: process gaps, staffing shortages, tooling limitations
- Consider environmental risks: regulatory changes, emerging threat landscape, industry-specific threats
- Deduplicate and consolidate related risks into distinct risk items
2. **Score each risk:**
- **Likelihood** (1-5):
- 1 = Rare — may occur only in exceptional circumstances
- 2 = Unlikely — could occur but not expected
- 3 = Possible — might occur at some time
- 4 = Likely — will probably occur in most circumstances
- 5 = Almost certain — expected to occur routinely
- **Impact** (1-5):
- 1 = Negligible — minimal effect on operations or data
- 2 = Minor — limited impact, easily recoverable
- 3 = Moderate — noticeable business disruption or data exposure
- 4 = Major — significant financial, reputational, or operational damage
- 5 = Catastrophic — existential threat, massive data breach, regulatory shutdown
- **Risk score** = likelihood x impact (range: 1-25)
3. **Categorize risks:**
- **Critical** (20-25) — requires immediate executive attention and action
- **High** (12-19) — requires mitigation plan within 30 days
- **Medium** (6-11) — managed through standard security controls and monitoring
- **Low** (1-5) — accepted and monitored through routine processes
- Plot risks on a 5x5 risk matrix for visual representation
4. **Define treatment strategy per risk:**
- **Mitigate** — implement controls to reduce likelihood or impact (most common)
- **Transfer** — shift risk to third party via insurance, outsourcing, or contractual terms
- **Accept** — acknowledge and monitor, used when cost of mitigation exceeds potential impact
- **Avoid** — eliminate the activity or technology creating the risk
- For each risk, document the chosen strategy with specific actions and expected residual risk
5. **Assign risk owners and set review dates:**
- Assign a named owner for each risk (individual, not team)
- Set review dates based on risk level:
- Critical: reviewed weekly until mitigated
- High: reviewed monthly
- Medium: reviewed quarterly
- Low: reviewed annually
- Define escalation criteria: when does a risk get re-scored or escalated?
6. **Write the artifact** to `.metapowers/security/$ARGUMENTS/01-identify.md` with heading:
## Risk Assessment
Include sections:
- **Risk Register** — all risks with ID, description, likelihood, impact, score, and category
- **Risk Matrix** — 5x5 visual matrix with risk placement
- **Treatment Strategies** — action plan per risk with expected residual risk
- **Risk Ownership** — assigned owners and review schedule
- **Top Risks Summary** — detailed analysis of critical and high risks
## Output
The risk assessment written to `.metapowers/security/$ARGUMENTS/01-identify.md`. Present a summary to the user highlighting:
- Total risks identified and distribution across categories
- Top 5 highest-scoring risks with treatment strategies
- Risk ownership assignments
- Recommended review cadence and next review date