description: Plan team capacity across sprints accounting for holidays and availability
---
# Capacity Planning
Plan team capacity for "$ARGUMENTS" across upcoming sprints. List team members, calculate available working days accounting for holidays and leave, apply focus factors, estimate capacity in story points, and identify capacity risks over the next 3-6 sprints.
## Prerequisites
None — this is a utility skill. It can be run at any time, with or without existing project artifacts.
If `.project/$ARGUMENTS/` exists, read any available artifacts for context (especially team setup, sprint metrics, and velocity data). If it does not exist, proceed based on information the user provides.
## Process
1. **Gather context:**
- If `.project/$ARGUMENTS/` exists, read available artifacts for team composition, velocity history, and sprint cadence
- If no artifacts exist, ask the user for: team members, sprint length, and upcoming sprint dates
- Determine the planning horizon: typically 3-6 sprints ahead
2. **List team members with their roles:**
- For each team member, document:
- **Name** and **role** (developer, designer, QA, etc.)
- **Allocation** — full-time (100%) or part-time (specify percentage)
- **Individual velocity** — if known from historical data (story points per sprint)
- **Skills or specialties** — useful for identifying single points of failure
- Note any planned team changes: new hires joining, members departing, role changes
3. **For each sprint period, calculate available working days:**
- **Total business days** in the sprint (exclude weekends)
- **Minus public holidays** — list specific holidays that fall in the sprint
- **Minus known PTO and leave** — planned vacations, sick leave patterns, parental leave, training days
- **Minus company events** — offsites, all-hands, hackathons, conferences
- Calculate per person and as a team total
- Present as a table: team member x sprint with available days in each cell
4. **Subtract overhead:**
- **Meetings and ceremonies** — sprint planning, standup, review, retro, backlog refinement (typically 15-20% of time)
- **Support and maintenance** — on-call duties, production support, bug triage (estimate based on historical patterns)
- **Administrative tasks** — code reviews, documentation, mentoring, hiring interviews
- Default overhead: 20% of available time, adjust based on team's actual experience
- Document the overhead percentage used and rationale
5. **Apply focus factor:**
- Focus factor accounts for context switching, interruptions, and ramp-up time
- **0.8 (high focus):** dedicated team, minimal interruptions, mature processes
- **0.7 (normal):** typical team with some interruptions and context switching
- **0.6 (low focus):** frequent interruptions, multiple projects, many ad-hoc requests
- Select the appropriate factor based on the team's working environment
- Document the chosen factor and rationale
6. **Calculate capacity in story points per sprint:**
- **Formula:** available days x (1 - overhead%) x focus factor x individual velocity factor
- If individual velocity is unknown, use a default of 1 story point per productive day as a starting point
- If team historical velocity is known, use it as a cross-check:
- Calculate capacity bottom-up (sum of individual capacities)
- Compare with top-down (historical team velocity adjusted for availability)
- Use the lower of the two estimates for safer planning
- Present capacity per person and as a team total for each sprint
7. **Sum team capacity per sprint:**
- Create a summary table: sprint x total capacity (story points)
- Show the range: minimum (pessimistic), expected (realistic), maximum (optimistic)
- Compare with backlog demand if known — is there enough capacity to deliver the planned work?
- Highlight sprints with significantly reduced capacity (holidays, leaves)
8. **Identify capacity risks across the planning horizon:**
- **Holiday clusters** — sprints with multiple holidays reducing capacity significantly
- **Planned leaves** — periods where multiple team members are out simultaneously
- **Key-person dependencies** — sprints where a specialist is unavailable and work depends on them
- **Ramp-up periods** — new team members who will not be at full velocity initially (expect 25-50% for first sprint, 50-75% for second)
- **Competing priorities** — known events that will pull team members away (releases, on-call rotations, company events)
- For each risk, note the impact on capacity and suggest mitigation (shift work, cross-train, adjust scope)
9. **Recommend commitment levels per sprint:**
- Based on calculated capacity, recommend how many story points to commit to in each sprint
- **Commitment guideline:** commit to 80% of calculated capacity to leave room for unknowns
- Flag sprints where capacity is below 70% of normal — consider reducing scope or extending timelines
- Flag sprints where commitment should be especially conservative (first sprint of a new team, post-holiday sprints)
- Suggest which work to prioritize or defer based on capacity constraints
10. **Write the artifact** — save to `.project/$ARGUMENTS/capacity-planning.md`:
- **Team Roster** — members, roles, allocation, and velocity
- **Sprint Calendar** — dates, business days, holidays, and PTO for each sprint
- **Capacity Table** — available days, overhead, focus factor, and story points per person per sprint
- **Team Capacity Summary** — total capacity per sprint with min/expected/max range
- **Capacity Risks** — identified risks with impact and mitigation
- **Commitment Recommendations** — recommended story point commitment per sprint
- **Assumptions** — overhead percentage, focus factor, velocity factors used
## Output
Capacity plan saved to `.project/$ARGUMENTS/capacity-planning.md`. Present a summary highlighting:
- Team size and total capacity across the planning horizon
- Sprints with significantly reduced capacity and why
- Top capacity risk and recommended mitigation
- Commitment recommendations per sprint