Skip to content
Back to skills

Estimate

ASecurity

Break a task into estimated subtasks with assumptions, dependencies, and a total range

  • 3 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 3, 2026
ai-agentsgotestingapi

Works with

  • api

Security analysis

A100/100

Scanned September 3, 2026

npx -y skills add black141312/ada --skill estimate --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Estimate?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Estimate
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/black141312-estimate/badge)](https://www.skillsdirectory.com/skills/black141312-estimate)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: estimate
description: Break a task into estimated subtasks with assumptions, dependencies, and a total range
category: productivity
---

# Estimate

Reach for this when someone asks "how long will this take?" — turn a vague task into a decomposed, defensible estimate with the uncertainty made explicit instead of a single hopeful number.

1. Clarify the scope and the definition of done; note anything ambiguous as an explicit assumption you are estimating against.
2. Decompose the task into subtasks small enough that each is obvious in size (roughly a half-day or less); split anything you can't size.
3. For each subtask give a three-point estimate — optimistic / likely / pessimistic — and a one-line reason for the spread.
4. Mark dependencies and ordering between subtasks, plus any external blockers (reviews, access, third-party APIs).
5. Add explicit line items for testing, code review, and integration — the work that estimates usually forget.
6. Total the likely column for a point estimate and the optimistic-to-pessimistic span for a range; flag the riskiest 1-2 subtasks driving the spread.

## Rules
- Never give a single bare number — always a range, and always with the assumptions it rests on.
- Estimate effort, not calendar time; do not bake in meetings, context-switching, or someone's availability.
- If a subtask's pessimistic case is more than ~3x its optimistic, it's underspecified — split it or spike it first.
- Don't pad silently; if you add buffer, label it as buffer so it can be challenged.
- Re-estimate when scope or assumptions change rather than defending a stale number.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.