Saas Scope Check

ASecurity

Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'

  • 9 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added November 7, 2026
documentationrustbashgitdocumentation

Security analysis

A100/100

Scanned November 7, 2026

npx -y skills add Basinfy/Basinfy-SaaS-Studio --skill saas-scope-check --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Saas Scope Check?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Saas Scope Check
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/basinfy-saas-scope-check/badge)](https://www.skillsdirectory.com/skills/basinfy-saas-scope-check)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: saas-scope-check
description: "Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'"
argument-hint: "[feature-name or sprint-N]"
user-invocable: true
allowed-tools: Read, Glob, Grep, Bash(git log *)
model: haiku
---

# Scope Check

> **Interaction Localization Rule**:
> When `locale: pt-BR` (or user speaks Portuguese), ALL questions (`AskUserQuestion` / `ask_question`), confirmation prompts, and selectable options MUST be translated and presented in **Brazilian Portuguese (PT-BR)**.
> Any English question text or options in this skill are illustrative examples — NEVER display English questions or options to a Portuguese developer.
> Internal reasoning, code synthesis, tests, and documentation files MUST remain in English.

This skill is read-only — it reports findings but writes no files.

Compares original planned scope against current state to detect, quantify, and triage
scope creep.

**Argument:** `$ARGUMENTS` — the whole string: a feature name (it may be several words), sprint number, or milestone name.

---

## Phase 1: Find the Original Plan

Locate the baseline scope document for the given argument:

- **Feature name** → read `design/prd/[feature].md` or matching file in `design/`
- **Sprint number** (e.g., `sprint-3`) → read `production/sprints/sprint-003.md` (the name `/saas-sprint-plan` writes) or similar
- **Milestone** → read `production/milestones/[name].md`

If the document is not found, report the missing file and stop. Do not proceed without
a baseline to compare against. Read a PRD by section: check if `.basinfy/` exists: if present, use the Basinfy Protocol (`basinfy_search` then `basinfy_read`); otherwise check if `.basinfy/` exists: if present, use the Basinfy Protocol (`basinfy_search` then `basinfy_read`); otherwise check if `.basinfy/` exists: if present, use the Basinfy Protocol (`basinfy_search` then `basinfy_read`); otherwise check if `.basinfy/` exists: if present, use the Basinfy Protocol (`basinfy_search` then `basinfy_read`); otherwise find the headings you need with the Basinfy Protocol (`basinfy_search` / `basinfy_read` if `.basinfy/` exists) or the Basinfy Protocol (`basinfy_search` / `basinfy_read` if `.basinfy/` exists) or the Basinfy Protocol (`basinfy_search` / `basinfy_read` if `.basinfy/` exists) or the Grep tool (pattern `^#`, content mode) and Read those ranges with offset and limit.

---

## Phase 2: Read the Current State

Check what has actually been implemented or is in progress:

- Scan the codebase for files related to the feature/sprint
- Read git log for commits related to this work (`git log --oneline --since=[start-date]`)
- Check for TODO/FIXME comments that indicate unfinished scope additions
- Check active sprint plan if the feature is mid-sprint

---

## Phase 3: Compare Original vs Current Scope

Produce the comparison report:

```markdown
## Scope Check: [Feature/Sprint Name]
Generated: [Date]

### Original Scope
[List of items from the original plan]

### Current Scope
[List of items currently implemented or in progress]

> **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.**
> Replace the counts and the Bloat Score with
> `[Baseline | Current state] unusable — see verdict` (whichever side could not
> be read) and give the reason. A rendered
> `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED
> verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to
> kill, one phase earlier — and readers trust a number over a caveat.

### Scope Additions (not in original plan)
| Addition | Source | When | Justified? | Effort |
|----------|--------|------|------------|--------|
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |

### Scope Removals (in original but dropped)
| Removed Item | Reason | Impact |
|-------------|--------|--------|
| [item] | [why removed] | [what's affected] |

### Bloat Score
- Original items: [N]
- Current items: [N]
- Items added: [N] (+[X]%)
- Items removed: [N]
- Net scope change: [+/-N] ([X]%)

### Risk Assessment
- **Schedule Risk**: [Low/Medium/High] — [explanation]
- **Quality Risk**: [Low/Medium/High] — [explanation]
- **Integration Risk**: [Low/Medium/High] — [explanation]

### Recommendations
1. **Cut**: [Items that should be removed to stay on schedule]
2. **Defer**: [Items that can move to a future sprint/version]
3. **Keep**: [Additions that are genuinely necessary]
4. **Flag**: [Items that need a decision from delivery-producer/product-director]
```

---

## Phase 4: Verdict

Assign a canonical verdict based on net scope change:

| Net Change | Verdict | Meaning |
|-----------|---------|---------|
| ≤10% | **PASS** | On Track — within acceptable variance |
| >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
| >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
| >50% | **FAIL** | Out of Control — stop, re-plan, escalate to delivery-producer |

**Before applying that table, check that the percentage means something.** Emit
**NOT ASSESSED** instead — never a computed percentage — when any of:

- The **baseline document exists but enumerates no scope items** (all headings,
  placeholders, or `[TO BE CONFIGURED]`). Phase 1 stops when the file is *absent*;
  this is the case where it is present and empty, and it is the more dangerous
  one, because zero items yields a 0% net change that renders as **PASS — On
  Track**. Nothing was compared. Nothing was on track.
- The **current state cannot be determined** — no related source files, no commits
  in the window, nothing in progress to read. Comparing a real baseline against an
  unreadable present is not a 0% change, and not the −100% that zero current
  items computes — the table reads both as PASS.
- The denominator would be zero for any other reason. A percentage computed from
  no baseline items is not a small number; it is not a number.

`NOT ASSESSED` **outranks PASS** (a comparison that never happened has not shown
scope is on track) and **ranks below CONCERNS and FAIL** (measured creep is more
actionable than an unmeasurable baseline).

Output the verdict prominently:

```
**Scope Verdict: [PASS / CONCERNS / NOT ASSESSED / FAIL]**
Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control]
           [or: NOT ASSESSED — [which side could not be read, and why]]
```

---

## Phase 5: Next Steps

After presenting the report, offer concrete follow-up:

- **PASS** → no action required. Suggest re-running before next milestone.
- **NOT ASSESSED** → say which side was unreadable and what would fix it (populate
  the baseline document, or point the skill at where the work actually lives).
  Do not offer a re-run against the same inputs — it will produce the same
  non-answer.
- **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/saas-sprint-plan update` to formally re-scope (if the project has no sprint plan, as on the default minimal workflow, re-scope by editing the brief's build order).
- **FAIL** → recommend escalating to delivery-producer. Reference `/saas-sprint-plan update` for re-planning (if the project has no sprint plan, as on the default minimal workflow, edit the brief's build order) or `/saas-estimate` to re-baseline timeline.

End every verdict except NOT ASSESSED with:
> "Run `/saas-scope-check [name]` again after cuts are made to verify the verdict improves."

(NOT ASSESSED ends with what would make it assessable, above — a re-run against
the same inputs would repeat the non-answer.)

---

### Rules

- Scope creep is additions without corresponding cuts or timeline extensions
- Not all additions are bad — some are discovered requirements. But they must be acknowledged and accounted for
- When recommending cuts, prioritize preserving the core user experience over nice-to-haves
- Always quantify scope changes — "it feels bigger" is not actionable, "+35% items" is

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.