Assess the cleanliness status a programme has to put in front of a design or production readiness review under ECSS-Q-ST-70-01C. Use when the contamination data pack for a preliminary design, critical design, manufacturing readiness, test readiness or flight acceptance review is being assembled, or when a board has to decide whether contamination control is ready to let the next phase start: derive the items the review owes from its type and the contamination sensitivity of the hardware, comp...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill q7001-cleanliness-reviews --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Q7001 Cleanliness Reviews?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-q7001-cleanliness-reviews)More formats (shields.io, HTML) on the badges page.
---
name: q7001-cleanliness-reviews
description: "Assess the cleanliness status a programme has to put in front of a design or production readiness review under ECSS-Q-ST-70-01C. Use when the contamination data pack for a preliminary design, critical design, manufacturing readiness, test readiness or flight acceptance review is being assembled, or when a board has to decide whether contamination control is ready to let the next phase start: derive the items the review owes from its type and the contamination sensitivity of the hardware, compare them with what was submitted, weigh the open contamination actions by severity, and return a ready, conditional or not-ready verdict that names every missing item. Trigger: ecss, q-st-70-01c-cleanliness-scope, cleanliness-review-data-pack, contamination-control-readiness-review, design-review-cleanliness-input, contamination-open-action-severity, cleanliness-review-verdict, contamination-control-plan-maturity."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, q-st-70-01c-cleanliness-scope, q7001-cleanliness-reviews, cleanliness-review-data-pack, contamination-control-readiness-review, design-review-cleanliness-input, contamination-open-action-severity, cleanliness-review-verdict, contamination-control-plan-maturity]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Cleanliness — Status Inputs to Readiness Reviews (space-systems/ecss/q7001-cleanliness-reviews)
Use when the task is the review duty of ECSS-Q-ST-70-01C — deciding
what contamination control has to show at a design or production
readiness review, and whether what has been submitted lets the board
release the next phase.
## Domain quick reference
- A review is a gate on evidence, not a status briefing. The question
is not whether contamination control is going well but whether the
items this particular review depends on exist and say what they need
to say.
- The data pack is a function of the review, not of the programme. A
preliminary design review wants requirements, a budget and a plan; a
test readiness review wants the facility, the monitoring set-up and
the measurement the article entered with. Sending the same pack to
both leaves each one short of the thing it actually gates.
- Contamination sensitivity widens the pack. Optics, cryogenic
surfaces, detectors and propulsion feed systems carry effects that
ordinary structure does not, so sensitive hardware additionally owes
the sensitivity analysis and the end-of-life performance prediction.
- Items are mandatory or supporting, and the two do not trade. A
missing mandatory item is a stop; a missing supporting item is an
action. Averaging them into a completeness percentage hides which
kind is absent.
- Open actions are weighted by severity, and a major carries a veto. A
board that lets a major contamination action run past its own gate
has moved the risk into a phase with less time to absorb it.
- The useful output names what is absent. A percentage tells the board
how it feels; a list tells it what to ask for before it sits again.
- Conditional is a real verdict, not a softened pass. It says the gate
opens once named, dated actions close, and it is only honest if
those actions are listed.
## Workflow
1. Take the review type, the contamination sensitivity of the hardware
and the submitted item list, and reject a case that cannot name the
review rather than assuming one.
2. Derive the required pack: the items the review type owes, plus the
items sensitive hardware adds, each carrying its mandatory or
supporting status.
3. Compare the required pack with what was submitted, and separate the
absentees into mandatory and supporting.
4. Categorize and count the open contamination actions by severity,
and compute a weighted action load so several minors are visible
next to one major.
5. Compute a completeness fraction over the mandatory items only, so
the number cannot be inflated by supporting material.
6. Decide the verdict: not-ready while a mandatory item is absent or a
major action is open; conditional while supporting items or minor
actions remain; ready only when both are clear.
7. Report the missing items and the open actions together, so one
board sitting can clear them all.
## Pitfalls
- Sending one data pack to every review. Each gate depends on
different evidence, and a pack built for the last review is missing
exactly the item this one exists to check.
- Treating the contamination control plan as sufficient at every gate.
The plan is what the programme intends; from the manufacturing
readiness review onwards the board also needs what the facility and
the hardware have actually done.
- Trading a missing mandatory item against a rich set of supporting
material. A pack can be thick and still be missing the one document
the gate is about.
- Carrying a major contamination action through the gate on a promise.
The later the action closes, the less able the programme is to act
on what it finds.
- Omitting the sensitivity analysis for optical or cryogenic hardware
because the general budget looks comfortable. The budget is an areal
figure; the sensitivity analysis is what turns it into a performance
loss, and only one of the two answers the board's question.
- Reporting completeness as a single percentage. Two packs at the same
percentage can be in entirely different states, and the one missing
a mandatory item is not ready at any percentage.
## Behavior contract (gate 3)
Pack derivation, sensitivity extension, mandatory and supporting
separation, action weighting, mandatory completeness and the review
verdict are exercised by the gate 3 contract test:
scripts/test_q7001_cleanliness_reviews.py against
scripts/q7001_cleanliness_reviews_logic.py (stdlib unittest, offline).
Run: python3 scripts/test_q7001_cleanliness_reviews.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.