Assess whether the radiation analysis reporting reaches each project milestone review at the depth and on the date that review is owed. Use when the ECSS-Q-ST-60-15C clause 4.5 reporting obligation has to be planned or graded: read the depth an equipment category owes at a given review from the closed depth ladder, count working days back from the review date to turn that depth into a submission deadline, and grade every report separately on delivery, on depth against what was demanded, and o...

  • 2 stars
  • 0 votes
  • 0 copies
  • 4 views
  • Added September 27, 2026
ai-agentspythongo

Works with

  • claude code

Security analysis

A100/100

Pro scans all 3 files and shows the line behind each finding

Scanned September 27, 2026

npx -y skills add ashfordeOU/aero-agent-skills --skill q6015-radiation-review-milestones --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Q6015 Radiation Review Milestones?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Q6015 Radiation Review Milestones
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/ashfordeou-q6015-radiation-review-milestones/badge)](https://www.skillsdirectory.com/skills/ashfordeou-q6015-radiation-review-milestones)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: q6015-radiation-review-milestones
description: "Assess whether the radiation analysis reporting reaches each project milestone review at the depth and on the date that review is owed. Use when the ECSS-Q-ST-60-15C clause 4.5 reporting obligation has to be planned or graded: read the depth an equipment category owes at a given review from the closed depth ladder, count working days back from the review date to turn that depth into a submission deadline, and grade every report separately on delivery, on depth against what was demanded, and on timeliness against its own deadline. Trigger: ecss, q-st-60-15c-clause-4-5, radiation-review-milestone-reporting, radiation-analysis-report-depth, equipment-radiation-category, review-submission-lead-time, milestone-reporting-completeness."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
  - id: ecss
    reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
  domain: space-systems
  subdomain: ecss
  tags: [ecss, q-st-60-15-radiation-hardness-assurance-scope, q6015-radiation-review-milestones, q-st-60-15c-clause-4-5, radiation-review-milestone-reporting, radiation-analysis-report-depth, equipment-radiation-category, review-submission-lead-time, milestone-reporting-completeness]
  version: 0.1.0
  author: Aero Agent Skills
---

# ECSS Radiation Hardness Assurance — Review Milestone Reporting (space-systems/ecss/q6015-radiation-review-milestones)

Use when the task is the reporting obligation of ECSS-Q-ST-60-15C clause 4.5
— deciding what radiation analysis each milestone review is owed for a given
equipment, when it has to be in the board's hands, and whether what was
actually delivered met both.

## Domain quick reference

- Reporting depth is a ladder, not a label. A summary, an assessment, a
  detailed analysis and a full verification dossier are ordered, so a deeper
  report always satisfies a shallower demand and a shallower one never
  satisfies a deeper demand. Grading depth is therefore a rank comparison, not
  a string match.
- The depth owed is a function of two things together: the equipment category
  and the review. A category carrying a radiation-critical function deepens
  earlier in the project; a tolerant one can still be at summary depth when a
  critical one is already at detailed analysis.
- Depth never decreases along the project for a given category. Once a review
  has been fed a detailed analysis, the next review is not satisfied by a
  summary of it.
- Timing is derived from depth, not set independently. A deeper report is
  longer and is owed more reading time, so the deadline is counted back from
  the review date in working days by depth — which is why a deep report for a
  critical equipment has an earlier deadline than a shallow one for the same
  review on the same date.
- Counting in working days matters. A twenty-working-day lead crosses four
  weekends, so a calendar-day count lands the deadline nearly a month wrong
  and always in the optimistic direction.
- Delivery, depth and timeliness are three separate answers. A report that
  arrived but was too shallow, and a report at the right depth that arrived
  after the deadline, are different failures needing different recovery, so
  the grading never collapses them into a single pass or fail.

## Workflow

1. Normalise the equipment category, the review and any declared depth
   against their closed sets; an unrecognised value is an input error rather
   than a default.
2. Read the depth owed from the category-by-review matrix.
3. Convert that depth into a lead time in working days and step back from the
   review date, skipping weekends, to obtain the submission deadline.
4. Grade delivery first: a review entry with neither a depth nor a date is a
   report that was never submitted, and a half-declared entry with one of the
   two is an input error, not an absent report.
5. Grade depth by rank, so an over-delivered report passes, and grade
   timeliness by date, treating a submission landing exactly on the deadline
   as on time.
6. Order the graded entries by project sequence, refuse a duplicate entry for
   the same review, and return compliant only when no finding was raised.

## Pitfalls

- Matching the delivered depth against the demanded one as text. The ladder is
  ordered; a full dossier delivered where an assessment was owed is a pass,
  and treating it as a mismatch generates a finding nobody should act on.
- Counting the lead time in calendar days. Weekends make a working-day lead
  substantially longer on the calendar, and the error always makes a late
  report look on time.
- Setting one submission deadline for a review and applying it to every
  equipment. Two boxes reviewed on the same day owe different depths and
  therefore different deadlines.
- Reading an absent report as a shallow one. A report that does not exist has
  no depth to grade, and folding it into the depth finding hides that nothing
  was delivered at all.
- Grading only the review being held. The reporting record is a sequence, and
  a missing earlier report still leaves the current board without the basis
  the current analysis was built on.

## Behavior contract (gate 3)

The category, review and depth normalisation, the depth matrix, the
working-day deadline arithmetic, the three independent submission grades and
the project-level reporting verdict are exercised by the gate 3 contract test:
scripts/test_q6015_radiation_review_milestones.py against
scripts/q6015_radiation_review_milestones_logic.py (stdlib unittest,
offline). Run:
python3 scripts/test_q6015_radiation_review_milestones.py

## Compliance

- ECSS standards are freely downloadable (ESA); cite the source and
  paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.

Files in this skill

  • SKILL.md5.8 KB
  • scripts/q6015_radiation_review_milestones_logic.py9.8 KB
  • scripts/test_q6015_radiation_review_milestones.py10 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

View all in ai-agents →

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.