Evaluate an MMIC design-review programme before fabrication release. Use when the question is whether the microwave circuit design cleared every formal checkpoint ECSS-Q-ST-60-12C clause 7.3 expects, not merely whether reviews happened: normalise the declared checkpoints into canonical gate order, name the mandatory gates never held, detect a gate held out of sequence, measure the schedule slip against the planned day, accumulate the action-item closure ratio over the held gates, and check th...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill q6012-mmic-design-review-process --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Q6012 Mmic Design Review Process?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-q6012-mmic-design-review-process)More formats (shields.io, HTML) on the badges page.
---
name: q6012-mmic-design-review-process
description: "Evaluate an MMIC design-review programme before fabrication release. Use when the question is whether the microwave circuit design cleared every formal checkpoint ECSS-Q-ST-60-12C clause 7.3 expects, not merely whether reviews happened: normalise the declared checkpoints into canonical gate order, name the mandatory gates never held, detect a gate held out of sequence, measure the schedule slip against the planned day, accumulate the action-item closure ratio over the held gates, and check the fabrication release day clears the last gate plus its quiet period. Trigger: ecss, q-st-60-12c-clause-7-3, mmic-design-review-programme, mmic-pre-fabrication-release-gate, mmic-review-checkpoint-sequence, mmic-review-action-closure-ratio, mmic-review-schedule-slip."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, q-st-60-12-mmic-scope, q6012-mmic-design-review-process, mmic-design-review-programme, mmic-pre-fabrication-release-gate, mmic-review-checkpoint-sequence, mmic-review-action-closure-ratio, mmic-review-schedule-slip]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS MMIC — Design Review Process (space-systems/ecss/q6012-mmic-design-review-process)
Use when the task is the clause 7.3 programme question of ECSS-Q-ST-60-12C:
a microwave monolithic circuit is approaching fabrication release and the
question is whether the formal checkpoints that examine the design were
actually walked through, in order, with their actions closed — not whether
review meetings appear somewhere in the schedule.
## Domain quick reference
- Clause 7.3 is a gate sequence, not a single event. The design is examined
at requirements, architecture, detailed design and layout checkpoints, and
again at the pre-release gate that authorises the mask set. Each gate
depends on the one before it, so the order is part of the requirement.
- A gate that was planned is not a gate that was held. A programme listing
five checkpoints with four held days has one open gate, and the correct
reading of the fifth is "never held", not "assumed closed by the schedule".
- Holding a gate out of order is a real defect, not a bookkeeping quirk. A
layout review held before the detailed-design review it depends on examined
a layout whose schematic baseline had not yet been agreed, so both gates
have to be re-walked rather than reordered on paper.
- The output of a gate is its action list. The programme's readiness is
therefore a closure ratio over the actions raised at the gates that were
held; actions raised at a gate that never happened do not exist, and a
record claiming them is an input error.
- Fabrication release is a separate day from the last review day. A quiet
period between the two is what lets the final actions be dispositioned and
the released data package be assembled, so a release landing inside that
window is a finding even when every gate was held.
- Schedule slip is reported, not gated. A gate held late is information the
programme owner needs; it does not by itself block release, and conflating
the two hides the gates that genuinely do.
## Workflow
1. Normalise the declared programme: refuse an unknown checkpoint key, a
duplicate entry, a non-integer or negative day, and a record closing more
actions than it raised or raising actions at a gate never held.
2. Sort the records into canonical gate order so the sequence check reads
dependency order rather than the order the entries were typed in.
3. Name every mandatory gate that is absent or planned-but-unheld. A gate
explicitly marked non-mandatory and unheld is not a finding.
4. Walk the held gates in canonical order and flag any pair whose held days
run backwards. Two gates held the same day are combined, not out of order.
5. Compute the action closure ratio over the held gates and the coverage
fraction over the mandatory ones, plus the worst positive schedule slip.
6. Compare the closure ratio with the required value, absorbing floating-point
representation error at the boundary with a named tolerance rather than by
relaxing the required ratio.
7. Decide release: every mandatory gate held, no sequence violation, closure
ratio met, and the release day at or after the last gate plus the quiet
period. Report each failed condition as its own finding.
## Pitfalls
- Reading a planned checkpoint as a held one. The planned day says what the
schedule intended; only a held day is evidence the design was examined, and
a programme graded on planned days passes every gate it never ran.
- Reordering an out-of-sequence gate in the record instead of re-walking it. A
gate held early examined a baseline that did not exist yet; moving its row
in the table changes the report, not the evidence.
- Gating on schedule slip. Slip is reported so the programme owner can act on
it; treating a late gate as a failed gate buries the checkpoints that were
genuinely skipped under a list of dates.
- Counting actions raised at a gate that never happened. That inflates both
numerator and denominator of the closure ratio and can make an incomplete
programme look better closed than a complete one.
- Releasing on the last review day. The quiet period is where the residual
actions are dispositioned and the data package frozen; a same-day release
means the package that went to fabrication is not the one the gate saw.
- Widening the required closure ratio to make an exact-equality case pass. An
equality at the limit is a representation question, handled by the tolerance
inside the comparison; the required value stays as specified.
## Behavior contract (gate 3)
The checkpoint validation, canonical ordering, missing-gate detection,
sequence check, slip and closure-ratio computation and the release verdict are
exercised by the gate 3 contract test:
scripts/test_q6012_mmic_design_review_process.py against
scripts/q6012_mmic_design_review_process_logic.py (stdlib unittest, offline).
Run: python3 scripts/test_q6012_mmic_design_review_process.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.