Plan the whole ECSS-Q-ST-60-05C clause 7.3.2 approval sequence for a hybrid circuit design with no qualified predecessor to build on, from design definition review through technology and parts selection, engineering model build, design verification testing, process identification, qualification lot manufacture, the qualification test programme and results evaluation, to the approval grant. Use when a new hybrid circuit type enters approval and the question is which stage may start now and how...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill q6005-approval-of-new-circuit-designs --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Q6005 Approval Of New Circuit Designs?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-q6005-approval-of-new-circuit-designs)More formats (shields.io, HTML) on the badges page.
---
name: q6005-approval-of-new-circuit-designs
description: "Plan the whole ECSS-Q-ST-60-05C clause 7.3.2 approval sequence for a hybrid circuit design with no qualified predecessor to build on, from design definition review through technology and parts selection, engineering model build, design verification testing, process identification, qualification lot manufacture, the qualification test programme and results evaluation, to the approval grant. Use when a new hybrid circuit type enters approval and the question is which stage may start now and how far the grant still sits. Compute the stages whose prerequisites are met, report any stage recorded ahead of its prerequisites, and hold the grant while a stage is open or failed. Trigger: ecss, q-st-60-hybrid-scope, new-hybrid-circuit-approval-sequence, hybrid-qualification-lot, hybrid-design-verification-testing, approval-stage-prerequisite, hybrid-approval-critical-path."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, q-st-60-hybrid-scope, q6005-approval-of-new-circuit-designs, new-hybrid-circuit-approval-sequence, hybrid-qualification-lot, hybrid-design-verification-testing, approval-stage-prerequisite, hybrid-approval-critical-path]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Hybrids — Approval of New Circuit Designs (space-systems/ecss/q6005-approval-of-new-circuit-designs)
Use when the task is the heaviest branch of ECSS-Q-ST-60-05C clause 7.3
-- the clause 7.3.2 sequence owed by a hybrid circuit design that has no
qualified predecessor to inherit from, and the question of which stage
may be worked now and how far the approval grant still is.
## Domain quick reference
- Clause 7.3.2 is where a design lands when none of the lighter routes
are open: no approved predecessor, or one that carries nothing
forward. Nothing is inherited, so the whole sequence is owed from the
design definition review to the grant.
- The sequence is a dependency graph, not a list. Design verification
testing and manufacturing process identification run on separate
branches out of technology and parts selection, and both have to land
before the qualification lot can be built.
- A stage whose prerequisites are not finished has not really started,
however the schedule records it. A stage recorded complete or running
ahead of its prerequisites is a defect in the record, and it outranks
every other reading of the position.
- The grant stage is itself a stage with prerequisites -- the
qualification results evaluation and the design verification testing.
A grant recorded complete with the sequence behind it open is a record
the approval does not stand on.
- A failed stage holds the grant rather than delaying it. Nothing behind
a failure is legitimately complete, so a failure with downstream work
recorded done is a broken sequence, not a held one.
- Remaining time is the longest chain still to run, not the sum of what
is left. The process identification branch is shorter than the
verification branch, so finishing it alone moves no date at all.
- Progress reported as a fraction of nominal effort is a planning
figure. It answers how much has been done, never whether the grant can
be issued -- that is a separate question with a separate verdict.
## Workflow
1. Declare a state for every stage -- not started, in progress, complete
or failed. Reject an incomplete declaration: an undeclared stage is
not started, not absent, and defaulting it hides an untouched stage
behind a healthy-looking plan.
2. Check the record before reading it. List every stage recorded
complete or in progress while one of its prerequisites is not
complete, and treat that list as the first finding.
3. Compute the stages that may be worked now: those still open whose
prerequisites are all complete. Expect more than one where the graph
branches.
4. Compute the remaining critical path as the longest chain through the
open stages, taking a per-stage remaining-days override where the
project has one and the nominal duration otherwise.
5. Report progress as the share of nominal effort complete, separately
from the verdict, so the two are never read as the same claim.
6. Decide the grant in priority order: a broken sequence first, then a
failed stage, then a grant only when every stage is complete, and
pending otherwise.
## Pitfalls
- Working the sequence as a straight list. Two branches open together
after technology and parts selection, and a plan that serializes them
books a longer approval than the design actually needs.
- Adding up the remaining stage durations. That overstates the date by
the whole shorter branch; the answer is the longest remaining chain,
which the branch durations decide between them.
- Reading a completed grant stage as an approval. It is a record like
any other, and a grant standing on an open qualification evaluation is
exactly the defect the prerequisite check exists to surface.
- Treating a failure as a schedule slip. It holds the grant, and any
stage recorded complete behind it makes the record itself unsafe to
read rather than merely late.
- Quoting the completion share as readiness for the grant. A sequence
can be most of the way through nominal effort with the qualification
test programme untouched, because the share weighs days and says
nothing about which stages are still owed.
- Chasing the shorter branch because it is easier to close. Finishing
manufacturing process identification on its own leaves the
verification branch in charge and moves no date.
## Behavior contract (gate 3)
The stage-order check, state validation, prerequisite and
sequence-violation analysis, executable-stage selection, critical path,
completion share and the priority-ordered grant verdict are exercised by
the gate 3 contract test:
scripts/test_q6005_approval_of_new_circuit_designs.py against
scripts/q6005_approval_of_new_circuit_designs_logic.py (stdlib unittest,
offline). Run:
python3 scripts/test_q6005_approval_of_new_circuit_designs.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.