Use when you must compute parametric cost estimates for an aircraft development and production program: derive the learning curve exponent from a learning curve percentage, apply the learning curve to get unit cost and cumulative production cost, estimate development cost from airframe mass with a weight-based cost estimating relationship, and roll the recurring and non-recurring pieces into a total program cost. Produces the unit cost, the cumulative learning factor, the production total, an...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill parametric-cost --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Parametric Cost?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-parametric-cost)More formats (shields.io, HTML) on the badges page.
---
name: parametric-cost
description: "Use when you must compute parametric cost estimates for an aircraft development and production program: derive the learning curve exponent from a learning curve percentage, apply the learning curve to get unit cost and cumulative production cost, estimate development cost from airframe mass with a weight-based cost estimating relationship, and roll the recurring and non-recurring pieces into a total program cost. Produces the unit cost, the cumulative learning factor, the production total, and the program total that gate the program cost assessment. Trigger: parametric cost, cost estimating relationship, cer, learning curve, unit cost, development cost, program cost, cumulative average."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: far-25
reference-only: true
- id: cs-25
reference-only: true
gated: false
domain: vehicle-design
pack: vehicle-design
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: vehicle-design
subdomain: cost-estimation
tags: [parametric-cost, cost-estimation, cost-estimating-relationship, cer, learning-curve, unit-cost, development-cost, program-cost, cumulative-average]
version: 0.1.0
author: Aero Agent Skills
---
# Parametric Cost Estimation (vehicle-design/cost-estimation/parametric-cost)
Use when the task is parametric cost estimation for an aircraft
development and production program: learning curve exponents, unit
costs, cumulative production totals, weight-based development cost
estimating relationships, and the total program cost rollup.
## Domain quick reference
- All costs are in program currency units, airframe mass in kg, and
the learning curve lc is dimensionless (0.85 typical, 80-95% band).
- Learning curve exponent: s = ln(lc) / ln(2). For lc = 0.85, s =
-0.234465; each doubling of the unit number drops the unit cost to
lc times the previous doubling.
- Unit cost: c_n = c1 * n**s, with c1 the first-unit cost and n the
unit number (n >= 1). Defining property: the second unit costs lc
times the first, c2 = c1 * lc.
- Cumulative learning factor: F(n) = n**(s+1) / (s+1), the closed-form
cumulative average approximation; production total = c1 * F(n).
- Development cost (weight-based CER): c_dev = a * w**b, with a a
coefficient, w the airframe mass in kg, and b the exponent (b near
0.6 for aircraft airframe development).
- Program total = production total + development cost: recurring
production cost plus the non-recurring development cost.
- FAR-25 and CS-25 are referenced as program context only; the CERs
and the learning curve are common program cost estimating practice,
not regulation.
## Workflow
1. Set the program inputs: first-unit cost c1, unit number n, learning
curve lc, and the development CER coefficient a, mass w, and
exponent b.
2. Compute the learning curve exponent with learning_curve_exponent;
it guards lc against out-of-band values.
3. Compute the unit cost of unit n with unit_cost.
4. Compute the cumulative learning factor with
cumulative_learning_factor.
5. Compute the development cost with development_cost.
6. Roll everything up with total_program_cost; the returned dict
carries unit_n, cumulative_factor, production_total, and
program_total.
## Pitfalls
- Passing lc outside (0, 1): lc >= 1 gives a flat or rising curve and
lc <= 0 is meaningless; both raise ValueError instead of returning a
wrong exponent.
- Using the unit cost as the production total: the cumulative factor
sums the learning curve over all units up to n, and c_n alone
understates the fleet cost.
- Confusing n with the fleet size: n is the unit number of the last
unit in the production run, not the number of aircraft if the run
starts elsewhere.
- Mixing development CER units: w must be in kg and a scaled to the
program currency unit; a per-kg coefficient applied to a mass in lb
shifts the estimate by orders of magnitude.
- Treating the closed-form cumulative factor as exact: F(n) =
n**(s+1)/(s+1) is the standard approximation for n >= 1, not the
exact discrete sum.
- Passing n < 1 to cumulative_learning_factor: the module raises
ValueError instead of guessing.
## Behavior contract (gate 3)
The learning curve exponent, unit cost, cumulative learning factor,
weight-based development cost, and total program cost rollup are
exercised by the gate 3 contract test:
scripts/test_parametric_cost.py against
scripts/parametric_cost_logic.py (stdlib unittest, offline). Run:
python3 scripts/test_parametric_cost.py
## Compliance
- Standards referenced, not reproduced: FAR-25 is US government work
(public domain) and CS-25 is a free EASA download; the CERs and the
learning curve are common program cost estimating methodology,
summary-only per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.