Use when you must build the vehicle mass budget for the conceptual design: allocate the subsystem masses, apply the growth allowance and the contingency margin policy, roll up the total estimated mass, and check the margin-backed total against the MTOW target. Produces the mass breakdown, the total mass with margin, and the within-target or over-target verdict that gate the weight control plan. Trigger: mass budget, growth allowance, contingency margin, MTOW target, mass breakdown.
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill mass-budget --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Mass Budget?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-mass-budget)More formats (shields.io, HTML) on the badges page.
---
name: mass-budget
description: "Use when you must build the vehicle mass budget for the conceptual design: allocate the subsystem masses, apply the growth allowance and the contingency margin policy, roll up the total estimated mass, and check the margin-backed total against the MTOW target. Produces the mass breakdown, the total mass with margin, and the within-target or over-target verdict that gate the weight control plan. Trigger: mass budget, growth allowance, contingency margin, MTOW target, mass breakdown."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: far-25
reference-only: true
- id: cs-25
reference-only: true
gated: false
domain: vehicle-design
pack: vehicle-design
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: vehicle-design
subdomain: mass-properties
tags: [mass-budget, mass-allocation, growth-allowance, contingency-margin, margin-policy, mtow-target, mass-breakdown]
version: 0.1.0
author: Aero Agent Skills
---
# Mass Budget (vehicle-design/mass-properties/mass-budget)
Use when the task is building the vehicle mass budget at the
conceptual level: allocating subsystem masses, applying the growth
allowance and contingency margin policy, rolling up the estimated
total mass, and checking the margin-backed total against the MTOW
target.
## Domain quick reference
- The mass budget is the mass breakdown of the vehicle by subsystem
(wing, fuselage, empennage, systems, payload, and so on); the rollup
is the sum of the subsystem masses in kg.
- Growth allowance is the percentage added to an estimated mass to
cover later design refinement; common practice tightens it as the
design matures: about 10 percent in the conceptual phase, about 6
percent in the preliminary phase, and about 3 percent in the
detailed phase.
- Contingency margin is an extra percentage on top of the
growth-allowance total to cover estimation uncertainty.
- Margin-backed total mass: estimated total multiplied by
(1 + growth allowance) and then by (1 + contingency margin).
- The MTOW target check subtracts the margin-backed total from the
target takeoff mass; a non-negative margin is within target, a
negative margin is over target, and the margin percent is relative
to the target.
- Mass budget practice sits in the FAR-25 / CS-25 weight and balance
context (CG limits and operating weights rely on the budgeted mass).
## Workflow
1. Collect the subsystem mass estimates in kg, one entry per
subsystem.
2. Roll up the budget with rollup_mass_budget.
3. Select the design phase and get its growth allowance with
phase_growth_allowance.
4. Apply the growth allowance with apply_growth_allowance and the
contingency margin with contingency_mass.
5. Check the margin-backed total against the MTOW target with
mtow_check and read the verdict before gating the weight control
plan.
## Pitfalls
- Applying the growth allowance and the contingency margin only to
selected subsystems: both apply to the rolled-up total, not per
item, unless the item has its own agreed margin.
- Confusing the two margins: growth allowance covers design
refinement, contingency covers estimation uncertainty; they are
separate percentages.
- Reporting the raw rollup as the budget total: the margin-backed
total is what the weight control plan tracks.
- Reading margin percent with the wrong reference: margin percent is
relative to the target mass, not to the estimated mass.
- Passing an empty subsystems dict or a negative fraction; the module
raises ValueError instead of guessing.
## Behavior contract (gate 3)
The rollup, growth allowance, contingency margin, and MTOW target
check logic are exercised by the gate 3 contract test:
scripts/test_mass_budget.py against scripts/mass_budget_logic.py
(stdlib unittest, offline). Run:
python3 scripts/test_mass_budget.py
## Compliance
- Standards referenced, not reproduced: FAR-25 is US government work
(public domain) and CS-25 is a free EASA download; growth allowance
and contingency margin values are common weight engineering
heuristics, summary-only per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.