Use when you must plan a flight test program: order the test points with the build-up approach so risk increases step by step and every prerequisite is flown before the dependent point, check that the instrumentation covers the required sensors, and confirm the test matrix covers every test objective. Produces the risk-ordered flight sequence with missing prerequisites flagged, the missing instrumentation list with the completeness verdict, the uncovered objectives with the matrix verdict, an...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill flight-test-planning --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Flight Test Planning?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-flight-test-planning)More formats (shields.io, HTML) on the badges page.
---
name: flight-test-planning
description: "Use when you must plan a flight test program: order the test points with the build-up approach so risk increases step by step and every prerequisite is flown before the dependent point, check that the instrumentation covers the required sensors, and confirm the test matrix covers every test objective. Produces the risk-ordered flight sequence with missing prerequisites flagged, the missing instrumentation list with the completeness verdict, the uncovered objectives with the matrix verdict, and the go/no-go gate verdict that releases or blocks the flight. Trigger: build-up approach, test matrix, flight test planning, instrumentation completeness, go/no-go gate, prerequisites."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: far-25
reference-only: true
- id: cs-25
reference-only: true
gated: false
domain: flight-test-operations
pack: flight-test-operations
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: flight-test-operations
subdomain: planning
tags: [flight-test-planning, build-up-approach, test-matrix, instrumentation, go-no-go, flight-test, safety-review, envelope-expansion, prerequisites, test-point, risk-ordered]
version: 0.1.0
author: Aero Agent Skills
---
# Flight Test Planning (flight-test-operations/planning/flight-test-planning)
Use when the task is planning a flight test program: build-up
ordering of the test points, test matrix construction and coverage,
instrumentation completeness, and the go/no-go gate before each
flight.
## Domain quick reference
- Build-up approach: order the test points from lowest to highest
risk so the envelope is expanded step by step; a point may only be
flown after its prerequisites, and a prerequisite that is not part
of the point set must be flagged before the program starts.
- Test matrix: rows are test points, columns are test objectives; a
point covers an objective when it exercises it. The matrix is
complete when every objective has at least one covering point.
- Instrumentation completeness: compare the required sensor set
against the installed set; every missing instrument blocks the
affected test point.
- Go/no-go gate: weather, aircraft readiness, instrumentation, and
the safety review must all pass; any single failed check forces
NO-GO and names the blocker.
## Workflow
1. Collect the test points with their risk level and prerequisites.
2. Order them with build_up_order(test_points); review the flagged
missing prerequisites before the program starts.
3. Assemble the required and installed instrumentation sets and check
them with instrumentation_complete(required, provided).
4. Build the test matrix and check coverage with
test_matrix_complete(points, objectives); add points until every
objective is covered.
5. Before each flight, run the gate with
go_no_gate(weather_ok, aircraft_ready, instrumentation_ok,
safety_review_ok) and fly only on a GO verdict.
## Pitfalls
- Ordering by risk without checking prerequisites: a point whose
prerequisite is missing from the set is flagged, never silently
ordered.
- Risk ties: the sort keeps the input order, so identical risks stay
in the order you listed them; do not hand-shuffle ties.
- A matrix with one uncovered objective is incomplete even when every
other objective is covered.
- Instrumentation names match exactly after stripping whitespace; a
renamed sensor counts as missing.
- The gate rejects non-boolean inputs: "yes" or 1 is an error, not a
pass.
- Expanding the envelope in large steps: the build-up approach
increments risk so every step stays testable and recoverable.
## Behavior contract (gate 3)
The build-up ordering, instrumentation completeness, test matrix
coverage, and go/no-go gate logic is exercised by the gate 3 contract
test: scripts/test_flight_test_planning.py against
scripts/flight_test_planning_logic.py (stdlib unittest, offline). Run:
python3 scripts/test_flight_test_planning.py
## Compliance
- Standards referenced, not reproduced: FAR-25 and CS-25 set the
flight test and certification context; the build-up approach, test
matrix, instrumentation, and go/no-go practice is common
flight-test methodology, summary-only per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.