Assess a device feasibility and risk report against the required contents of ECSS-E-ST-20-40C Annex F at the close of the definition phase. Use when the report has to show that each feasibility question is answered on evidence and that every risk behind it is scored, mitigated and stated as a residual: form the severity-by-likelihood magnitude of each risk before and after mitigation, band both into the declared risk categories, measure the reduction the mitigation actually buys, close a feas...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e2040-feasibility-risk-report-data-item --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E2040 Feasibility Risk Report Data Item?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2040-feasibility-risk-report-data-item)More formats (shields.io, HTML) on the badges page.
---
name: e2040-feasibility-risk-report-data-item
description: "Assess a device feasibility and risk report against the required contents of ECSS-E-ST-20-40C Annex F at the close of the definition phase. Use when the report has to show that each feasibility question is answered on evidence and that every risk behind it is scored, mitigated and stated as a residual: form the severity-by-likelihood magnitude of each risk before and after mitigation, band both into the declared risk categories, measure the reduction the mitigation actually buys, close a feasibility question only when its evidence exists and no linked residual sits above the accepted band, and compute the criticality-weighted feasibility confidence. Trigger: ecss, e-st-20-40-device-scope, e2040-feasibility-risk-report-data-item, feasibility-question-closure, risk-severity-likelihood-magnitude, residual-risk-banding, mitigation-reduction-credit, definition-phase-feasibility-confidence."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-40-device-scope, e2040-feasibility-risk-report-data-item, feasibility-question-closure, risk-severity-likelihood-magnitude, residual-risk-banding, mitigation-reduction-credit, definition-phase-feasibility-confidence]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Device Engineering — Feasibility and Risk Report Data Item (space-systems/ecss/e2040-feasibility-risk-report-data-item)
Use when the task is the required contents of the feasibility and risk
report of ECSS-E-ST-20-40C Annex F -- the record produced during the
definition phase that says which questions about building the device are
still open, what each one risks, and what is left after the mitigation
the project intends to fund.
## Domain quick reference
- A risk is scored on two ordinal scales, severity and likelihood, each
a whole index from 1 to 5. Their product is the **magnitude**, and the
magnitude is banded into named categories by declared boundaries. The
product is ordinal too: a magnitude of 12 is worse than one of 8, but
it is not "1.5 times" anything.
- Every risk carries two scores: the **initial** one and the
**residual** one after the mitigation is applied. A mitigation that
moves neither index buys nothing, however much text it carries, and a
residual worse than the initial is a bookkeeping error rather than a
risk that grew.
- Mitigation normally moves likelihood; moving severity usually means
changing the design, not adding an action. Both are permitted here,
but the reduction credit is computed from the magnitudes so a plan
claiming a category jump has to show the indices that produce it.
- A **feasibility question** is closed only on two conditions together:
a named piece of evidence exists, and no risk linked to the question
has a residual category above the accepted band. Evidence alone
closes nothing while an unacceptable residual is still attached.
- Feasibility is reported as a **criticality-weighted confidence**, the
closed weight over the total weight. Weighting is what stops a report
closing nine minor questions and reading as 90 percent feasible while
the question that decides the device stays open.
## Workflow
1. Check the report's section list against the required contents and
name every absent section before scoring anything.
2. Validate the declared category bands: names in worsening order with
strictly increasing upper magnitudes, the last band open-ended. A
band set that overlaps or leaves a gap cannot categorize a risk.
3. Validate every risk: identifier, severity and likelihood as whole
indices in range, and residual indices defaulting to the initial
ones when the report declares no mitigation.
4. Form the initial and residual magnitudes, band both, and compute the
reduction the mitigation buys as the magnitude difference; flag a
residual above the initial as an inconsistent entry.
5. Validate every feasibility question: identifier, positive
criticality weight, evidence reference, and the risks it depends on.
Reject a link to a risk the register does not carry.
6. Close each question against both conditions and compute the
criticality-weighted feasibility confidence over the question set.
7. Report the confidence against the required level, the count of risks
in each residual band, and the open questions, unacceptable
residuals and empty mitigations as separate findings.
## Pitfalls
- Averaging severity and likelihood instead of banding their product.
An average turns a 5-by-1 and a 3-by-3 into the same number and
erases the catastrophic-but-rare case the report exists to surface.
- Taking mitigation credit in the text but not in the indices. If the
residual scores equal the initial ones, the report has recorded an
intention, not a reduction, and the risk is still where it started.
- Closing a feasibility question on evidence while an unacceptable
residual is still linked to it. Both conditions are required; the
evidence answers the question, the residual says whether the answer
survives.
- Reporting the count of open questions instead of their weight. Ten
trivial open questions and one driving open question are very
different feasibility positions and the same count.
- Treating the magnitude product as a ratio scale and computing a
percentage reduction from it. The reduction is a movement between
bands on an ordinal scale; report the indices that moved.
## Behavior contract (gate 3)
The section check, band validation, risk scoring and banding, mitigation
reduction, question-link validation, two-condition closure and the
criticality-weighted confidence are exercised by the gate 3 contract
test: scripts/test_e2040_feasibility_risk_report_data_item.py against
scripts/e2040_feasibility_risk_report_data_item_logic.py (stdlib
unittest, offline). Run:
python3 scripts/test_e2040_feasibility_risk_report_data_item.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.