Compute whether the input filter of a protected load finishes charging inside the charging window it is allowed while its feeding limiter holds the current. Use when an ECSS-E-ST-20-20C clause 5.3.2.3.1 load design has to show the filter energises in time: total the filter stage capacitances the bus actually sees, take the load draw during charging off the held limiting current, charge that total at what is left, and compare against the allowed window with the project margin applied. Refuses ...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e2020-input-filter-charge-time --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E2020 Input Filter Charge Time?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2020-input-filter-charge-time)More formats (shields.io, HTML) on the badges page.
---
name: e2020-input-filter-charge-time
description: "Compute whether the input filter of a protected load finishes charging inside the charging window it is allowed while its feeding limiter holds the current. Use when an ECSS-E-ST-20-20C clause 5.3.2.3.1 load design has to show the filter energises in time: total the filter stage capacitances the bus actually sees, take the load draw during charging off the held limiting current, charge that total at what is left, and compare against the allowed window with the project margin applied. Refuses a load draw that leaves no net charging current, and reports the largest filter the window would still carry. Trigger: ecss, e-st-20-20c, load-input-filter-charge-time, filter-stage-capacitance, limitation-charging-window, net-charging-current, held-limiting-current, filter-charge-time-margin."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e2020-input-filter-charge-time, filter-stage-capacitance, limitation-charging-window, net-charging-current, held-limiting-current, filter-charge-time-margin, load-input-filter-energisation]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Power — Load Input Filter Charge Time (space-systems/ecss/e2020-input-filter-charge-time)
Use when the task is the input filter charging demonstration of
ECSS-E-ST-20-20C clause 5.3.2.3.1 — showing that the capacitive filter
at a protected load's input is fully charged before the charging window
allowed during limitation runs out.
## Domain quick reference
- Energising a load input filter is a limitation event by construction.
The protective switch feeding the unit cannot supply the inrush a
discharged capacitance demands, so it holds its output to a limiting
current and stays there while the filter charges. It only tolerates
that state for a bounded window before it opens.
- While the switch is limiting, its output is a current source, so the
filter charges linearly and the time is C*V/I. The relevant I is the
HELD limiting current, at the lower edge of whatever band the unit is
allowed to limit in, because a compliant switch may hold anywhere in
that band and the slowest charge is the binding case.
- The capacitance is every stage in parallel, not the first stage alone.
A filter is usually a common-mode stage, a differential stage and a
bulk hold-up capacitor; the bus sees all of them, and the bulk stage
is normally the one that dominates the total.
- The unit draws its own current while the filter is charging, and only
the REMAINDER of the held current reaches the capacitance. Charging at
the full held current is the common defect: it under-reports the time,
and on a unit whose housekeeping draw is a real fraction of the held
current it under-reports it badly.
- A unit whose draw during charging reaches or exceeds the held limiting
current never charges at all. There is no charge time to report: the
input voltage does not rise, the window expires and the switch opens.
That is a distinct outcome from a filter that charges too slowly, and
the repair is different, so it is reported as its own verdict.
- Inverting the charge time at the margin gives the largest total filter
the window would carry. That is the figure a designer needs when the
check fails, because it says how much capacitance has to come out.
- The charge margin and the utilisation advisory ceiling are declared
project policy rather than physical constants; the defaults in the
logic module are a starting point a project substitutes its own values
into.
## Workflow
1. Validate the filter: unique stage names and a positive capacitance
per stage. An empty stage list is refused rather than treated as a
filter of zero capacitance that charges instantly.
2. Validate the charging conditions: bus voltage, held limiting current,
the unit's own draw during charging and the allowed window. A draw of
zero is accepted; a negative one is not.
3. Total the stage capacitances the bus sees in parallel, and report
each stage's share so a reviewer can see which stage dominates.
4. Take the unit's draw during charging off the held limiting current to
get the net current that actually reaches the capacitance.
5. If that net current is zero or negative, stop and report that the
filter never charges. Do not divide by it.
6. Otherwise charge the total capacitance at the net current, apply the
project margin, and compare against the allowed window. Report the
slack in seconds and the share of the window consumed.
7. Report the largest total capacitance the window would still carry, and
raise an advisory when a passing filter already consumes most of the
window.
## Pitfalls
- Charging at the full held limiting current. The unit's own draw during
charging comes off first, and only the remainder reaches the
capacitance; ignoring it under-reports the charge time.
- Totalling only the bulk capacitor, or only the first filter stage. The
bus sees every stage in parallel, and a check run on part of the
filter passes a unit that will not start.
- Dividing by a net charging current that is zero or negative. A unit
drawing at or above the held current is a real and reportable design
state, not an arithmetic accident, and it needs its own verdict
because shedding capacitance will not repair it.
- Charging at the middle or the upper edge of the limiting band. A
compliant switch may hold anywhere in its band, so the binding case is
the lowest current it may hold, and a midpoint calculation reports a
charge a compliant unit will not deliver.
- Comparing the charge time with the window by bare arithmetic. A charge
time is built by division and the margin by multiplication, so a
filter meant to sit exactly on the window can land a few units in the
last place the wrong side of it; the comparison absorbs that
representation error while the window and the margin stay as
specified.
## Behavior contract (gate 3)
The policy validation, filter and condition validation, capacitance
totalling, net charging current, charge time, supportable-capacitance
inversion and the full clause assessment are exercised by the gate 3
contract test: scripts/test_e2020_input_filter_charge_time.py against
scripts/e2020_input_filter_charge_time_logic.py (stdlib unittest,
offline). Run:
python3 scripts/test_e2020_input_filter_charge_time.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.