Use when an acceptance campaign is about to be signed off as a screen it may be too shallow or too long to be. Evaluate whether an acceptance thermal cycling run on a photovoltaic assembly serves the two purposes ECSS-E-ST-20-08C clause 5.5.3.7.1 gives it, revealing infant mortality and confirming supplier workmanship: hold the cycle count, the range and the dwell soak above the depth a screen needs, convert the run into qualification-equivalent damage and cap the demonstrated fatigue life it...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e2008-thermal-cycle-acceptance-purpose --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E2008 Thermal Cycle Acceptance Purpose?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2008-thermal-cycle-acceptance-purpose)More formats (shields.io, HTML) on the badges page.
---
name: e2008-thermal-cycle-acceptance-purpose
description: "Use when an acceptance campaign is about to be signed off as a screen it may be too shallow or too long to be. Evaluate whether an acceptance thermal cycling run on a photovoltaic assembly serves the two purposes ECSS-E-ST-20-08C clause 5.5.3.7.1 gives it, revealing infant mortality and confirming supplier workmanship: hold the cycle count, the range and the dwell soak above the depth a screen needs, convert the run into qualification-equivalent damage and cap the demonstrated fatigue life it may spend, group every failure by onset so an early escape is charged to workmanship while a late one is escalated, and report the lot escape rate. Trigger: ecss, e-st-20-08c-clause-5-5-3-7-1, solar-array-acceptance-thermal-cycling, infant-mortality-screen-adequacy, supplier-workmanship-confirmation, coffin-manson-life-consumption, cycle-dwell-soak-adequacy, failure-onset-grouping."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-08-photovoltaic-assembly-scope, e2008-thermal-cycle-acceptance-purpose, solar-array-acceptance-thermal-cycling, infant-mortality-screen-adequacy, supplier-workmanship-confirmation, coffin-manson-life-consumption, cycle-dwell-soak-adequacy, failure-onset-grouping]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Photovoltaic Assemblies -- Acceptance Thermal Cycling Purpose (space-systems/ecss/e2008-thermal-cycle-acceptance-purpose)
Use when the task is clause 5.5.3.7.1 of ECSS-E-ST-20-08C -- why a
flight photovoltaic assembly is thermally cycled at acceptance at all.
The design is already qualified, so this run is not a second
qualification. It exists to stress the article hard enough that an
early-life escape declares itself on the ground, and to give evidence
that the supplier's process produced this particular assembly the way
it produced the qualified one.
## Domain quick reference
- The two purposes are separate and can be served or missed
independently. A campaign that finds an escape has revealed infant
mortality and done its job; the same campaign has not confirmed
workmanship, because a confirmation is what a clean run produces.
- The campaign sits between two walls. Too few cycles, too shallow a
range or dwells too short to soak and nothing is precipitated, so
the run is a schedule item rather than a screen. Too much and the
acceptance run spends the fatigue life the qualification demonstrated
-- which is the life the mission was sold.
- Dwell length is a thermal question, not a procedural one. An
assembly needs roughly three thermal time constants at an extreme
before its joints are actually at chamber temperature, so a short
dwell delivers a smaller range than the profile sheet claims while
every recorded number still looks nominal.
- Damage is not linear in cycle count. A Coffin-Manson exponent
scales it with the temperature range, so acceptance cycles at one
range have to be converted into qualification-equivalent cycles
before a consumed-life fraction means anything. Twenty deep cycles
can cost more than two hundred shallow ones.
- Where a failure appears is the evidence that separates the two
purposes. An opening-cycle failure is an early-life escape and
speaks about the process that built this unit; a failure that only
appears once most of the campaign has run is a different mechanism
and belongs to design or wear-out.
- The escape rate across the delivered lot is the workmanship number
that survives the campaign. A single unit says little; the share of
the lot that failed at acceptance is what a supplier audit acts on.
## Workflow
1. Validate the acceptance profile and the qualification profile it is
measured against. An inverted extreme pair or a missing dwell stops
the judgement rather than defaulting to something plausible.
2. Check the campaign can precipitate anything: cycle count above the
screen floor, range deep enough to strain the joints, and both
dwells above the soak floor in thermal time constants.
3. Convert the acceptance cycles into qualification-equivalent cycles
with the fatigue exponent, and hold the consumed fraction of the
demonstrated life under its ceiling.
4. Group every recorded failure by the cycle it appeared in. Early
onsets are charged against supplier workmanship; later onsets are
escalated to the design authority instead of being written into a
supplier report where they will be answered with a process change
that fixes nothing.
5. Compute the escape rate over the units cycled, not over the units
that failed, so a lot with one bad article is separable from a lot
with a bad process.
6. Close with the verdict the evidence supports: workmanship
confirmed, infant mortality revealed, or the purpose not served at
all because the campaign could never have shown either.
## Pitfalls
- Reading a clean acceptance run as proof the assembly is sound. It is
proof the screen found nothing, and a screen too shallow to
precipitate a defect finds nothing by construction.
- Treating a late failure as a workmanship escape. The onset is the
evidence: a mechanism that needs most of the campaign to appear is
not the one an acceptance screen was built to catch, and charging it
to the supplier buys a corrective action against the wrong cause.
- Counting acceptance cycles against a qualification cycle count
directly. Without the range conversion a deep acceptance run looks
cheap while it is quietly spending the demonstrated life.
- Setting the dwell from the chamber controller rather than from the
assembly. The controller reaches temperature long before the joints
do, and a dwell measured against the controller overstates the
applied range.
- Comparing a soak ratio or a consumed-life fraction against its limit
by bare arithmetic. Both are float quotients that can land a few
units in the last place either side of a limit written in another
unit, so the comparison absorbs that error while the limit itself is
never relaxed.
- Quoting an escape count without the lot size. Two failures mean
different things in a lot of four and a lot of two hundred, and the
supplier action that follows is different in each case.
## Behavior contract (gate 3)
The two-purpose separation, screen-capability floors on cycle count,
range and dwell soak, the Coffin-Manson conversion into
qualification-equivalent cycles, the consumed-life ceiling, the
failure-onset grouping and the lot escape rate are exercised by the
gate 3 contract test:
scripts/test_e2008_thermal_cycle_acceptance_purpose.py against
scripts/e2008_thermal_cycle_acceptance_purpose_logic.py (stdlib
unittest, offline). Run:
python3 scripts/test_e2008_thermal_cycle_acceptance_purpose.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.