Use when planning or reviewing a long duration blocking diode life test before qualification closes. Verify that a blocking diode life test under ECSS-E-ST-20-08C clause 12.6.8 establishes stability over the mission rather than over the part of it the bench reached: confirm the run is both hot enough and loaded hard enough to accelerate, convert its hours into mission-equivalent hours through the Arrhenius factor those conditions buy, measure the signed drift of every watched parameter agains...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e2008-blocking-diode-life-test --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E2008 Blocking Diode Life Test?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2008-blocking-diode-life-test)More formats (shields.io, HTML) on the badges page.
---
name: e2008-blocking-diode-life-test
description: "Use when planning or reviewing a long duration blocking diode life test before qualification closes. Verify that a blocking diode life test under ECSS-E-ST-20-08C clause 12.6.8 establishes stability over the mission rather than over the part of it the bench reached: confirm the run is both hot enough and loaded hard enough to accelerate, convert its hours into mission-equivalent hours through the Arrhenius factor those conditions buy, measure the signed drift of every watched parameter against its limit, and project the same drift rate to end of mission so a parameter that passes the run but not the mission is caught. Trigger: ecss, e-st-20-08c-clause-12-6-8, blocking-diode-life-test-extreme-conditions, blocking-diode-life-test-mission-coverage, blocking-diode-life-test-parameter-drift-limit, blocking-diode-life-test-end-of-life-projection, blocking-diode-life-test-acceleration-factor."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-08-photovoltaic-assembly-scope, e2008-blocking-diode-life-test, blocking-diode-life-test-extreme-conditions, blocking-diode-life-test-mission-coverage, blocking-diode-life-test-parameter-drift-limit, blocking-diode-life-test-end-of-life-projection, blocking-diode-life-test-acceleration-factor]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Photovoltaic Assemblies -- Blocking Diode Life Test (space-systems/ecss/e2008-blocking-diode-life-test)
Use when the task is to plan or defend the long duration life test run on
blocking diodes under ECSS-E-ST-20-08C clause 12.6.8 -- at what
conditions, for how many hours that convert into mission hours, watched
through which parameters, and what the drift says about end of mission.
## Domain quick reference
- The clause asks for stability over time, and time here means mission
time, not bench time. Bench hours become mission hours only through the
acceleration the conditions buy.
- Conditions have to be extreme on two axes at once: a case temperature
at or above the declared floor, and a loading at or above a declared
share of the device rating. A long run at benign conditions buys
equivalent hours slowly and can run for months without reaching the
mission.
- Coverage is a declared floor, not the whole mission. Few programmes can
run a life test to full mission duration; the floor fixes how much of
it the test has to reach before the remainder is allowed to be
extrapolated.
- Stability is two checks, not one. What the parameter did during the run
is the first. What the same drift rate projects to at end of mission is
the second, and a parameter can pass the first and fail the second.
That second finding is the whole reason a life test is run early.
- Drift is a signed fraction of the starting value and is judged on its
magnitude. A forward voltage that fell is as much a change as one that
rose, and a parameter walking in either direction is not stable.
- Each watched parameter carries its own limit, and the limits are not
interchangeable. Reverse leakage is allowed to move much further than
forward voltage before it means anything.
- A parameter with no declared limit cannot be judged, so an unrecognised
or unlimited parameter is a data defect rather than a passing reading.
## Workflow
1. Validate the life test policy first: hours floor, extreme-condition
floors, mission duration, coverage floor and the per-parameter drift
limits. An unrecognised parameter in the limit set is refused rather
than ignored.
2. Take the conditions before anything else: the stress ratio against the
rating, and the case temperature against its floor. Both have to hold
or the run is long rather than accelerated.
3. Size the Arrhenius acceleration the case temperature buys against the
use temperature, and convert the bench hours into mission-equivalent
hours.
4. Compare the bench hours against the hours floor and the equivalent
hours against the coverage floor. These are separate failures: a run
can be long and still cover little, or short and strongly accelerated.
5. Take the signed drift of every watched parameter, group the
measurements, and refuse a parameter measured twice or with no limit
declared.
6. Judge each drift twice -- as measured, and projected to end of mission
at the same rate -- and report the second set separately, because a
parameter named only there passed the run.
7. Close on one verdict -- life test not performed, conditions not
extreme, coverage short, parameter unstable, projected drift exceeded,
or stability demonstrated -- reporting every inadequacy found, not
only the first. A value landing exactly on a floor or a limit is
accepted; the comparison tolerance absorbs representation error and
the limit does not move.
## Pitfalls
- Reading bench hours as mission hours. A thousand hours at benign
conditions is a thousand hours, and the clause is written about the
mission the diode has to survive.
- Calling a long run an accelerated one. Duration and acceleration are
independent, and only the second converts hours into mission coverage.
- Stopping at the measured drift. A parameter comfortably inside its
limit after the run can be outside it at end of mission at the same
rate, and that is the finding the test exists to produce.
- Taking drift as an absolute change. The limit is a fraction of where
the parameter started, so the same millivolt means different things on
different devices.
- Ignoring a parameter that fell. Magnitude is what is judged; a
capacitance walking down is as much instability as one walking up.
- Sharing one drift limit across the parameter set. Reverse leakage and
forward voltage do not move on the same scale and cannot be held to
the same number.
- Stopping at the first finding. A run can be benign, short and unstable
at once, and a report naming one of the three understates the repair.
## Behavior contract (gate 3)
The policy validation, the stress ratio and extreme-condition check, the
Arrhenius acceleration factor, the mission-equivalent hours and coverage
ratio, the signed per-parameter drift, the measured and projected
instability sets, and the life test verdict are exercised by the gate 3
contract test: scripts/test_e2008_blocking_diode_life_test.py against
scripts/e2008_blocking_diode_life_test_logic.py (stdlib unittest,
offline). Run: python3 scripts/test_e2008_blocking_diode_life_test.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.