Use when a blocking diode acceptance matrix, lot traveller set or sampling plan is under review. Evaluate a blocking diode lot record against clause 12.4.1 of ECSS-E-ST-20-08C, where two populations owe acceptance at once: the diodes being delivered and the diodes the qualification work consumes. Split the per-unit activities from the lot-sampled ones, score each sampled activity on the share of its population actually drawn, hold absent records, unrun work and recorded failures apart, flag a...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e2008-blocking-diode-acceptance-general --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E2008 Blocking Diode Acceptance General?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2008-blocking-diode-acceptance-general)More formats (shields.io, HTML) on the badges page.
---
name: e2008-blocking-diode-acceptance-general
description: "Use when a blocking diode acceptance matrix, lot traveller set or sampling plan is under review. Evaluate a blocking diode lot record against clause 12.4.1 of ECSS-E-ST-20-08C, where two populations owe acceptance at once: the diodes being delivered and the diodes the qualification work consumes. Split the per-unit activities from the lot-sampled ones, score each sampled activity on the share of its population actually drawn, hold absent records, unrun work and recorded failures apart, flag a population carrying no acceptance at all, and roll the lot into one verdict with ranked findings. Trigger: ecss, e-st-20-08c, blocking-diode-acceptance-testing-general, blocking-diode-delivery-population-acceptance, blocking-diode-qualification-population-acceptance, blocking-diode-sampled-activity-share, blocking-diode-acceptance-record-state, blocking-diode-lot-acceptance-verdict."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e-st-20-08c, e2008-blocking-diode-acceptance-general, blocking-diode-acceptance-testing-general, blocking-diode-delivery-population-acceptance, blocking-diode-qualification-population-acceptance, blocking-diode-sampled-activity-share, blocking-diode-acceptance-record-state, blocking-diode-lot-acceptance-verdict]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Blocking Diodes — Acceptance Testing, General (space-systems/ecss/e2008-blocking-diode-acceptance-general)
Use when the task is clause 12.4.1 of ECSS-E-ST-20-08C: acceptance testing is
applied to the blocking diodes being delivered and to the blocking diodes used
during the qualification work. This leaf grades a lot record on whether both
populations carry the acceptance activity set, on the basis each activity is
applied on.
## Domain quick reference
- The qualification population is the half that gets dropped. A diode consumed
by a qualification coupon is not being shipped, so acceptance reads like an
obligation somebody else carries. It is the other way round: a qualification
result only means something if the diode it was produced on was a sound diode
before the campaign touched it.
- An unaccepted blocking diode that leaks during a qualification run has settled
nothing. The result cannot separate a mounting process that does not hold from
a part that was already degraded, and the campaign is repeated at full cost.
- Blocking diodes split their acceptance work by basis. The visual inspection,
the forward voltage measurement and the reverse leakage measurement are
carried by every unit; the thermal shock, the solderability check and the seal
leak test are drawn on a sample of the lot. The basis decides what a missing
record even means.
- A sampled activity is graded on the share of its population actually drawn,
never on any single unit. Graded unit by unit it reports nearly every diode as
missing a record it never owed, and the genuinely undocumented units are lost
in the noise.
- A failure found in a sample speaks for the lot rather than for the unit it was
found on, which is why it is carried as a population finding and not folded
into one diode's verdict.
- Absent, not-run and failed are three different states and they are
dispositioned by different people through different paperwork. No record at
all is the worst, because nobody knows whether the work was skipped, lost or
never scheduled. Work recorded as not yet run is a schedule item. A recorded
failure is known and can be dispositioned.
- Exemption is a population-level defect and not a unit-level one. One diode
with a thin traveller is a paperwork problem; a whole population with empty
records is a decision somebody made, and it is reported as its own finding
rather than as a run of individually incomplete units.
- Whether a dispositioned failure leaves the lot open is a project position, and
it is read from policy twice over: once as the position itself, and once as
the cleared share the project will still carry. Assuming either answer
silently accepts or silently rejects hardware.
## Workflow
1. Resolve the policy: which activities every unit carries, which are drawn on
a sample, the sampling floor, the cleared floor and the failure position.
Refuse an activity placed on both bases at once.
2. Validate each unit: a unique identifier, one of the two populations, and
records naming only activities this clause owes.
3. Grade each unit against the every-unit activities only -- what has no record,
what is recorded as not run, what failed and what passed. A unit never drawn
into a sample is not missing anything.
4. Rank the unit verdict -- absent record first, then unrun, then failed -- so
the lot report names the root cause before the consequence.
5. Grade each sampled activity over its population: how many units were drawn,
what share of the population that is against the floor, and which drawn units
failed.
6. Summarise each population: how many units it holds, how many are clear, the
cleared share against its floor, the sampled results and the weakest unit.
7. Detect a population absent from the lot and a population present whose units
carry no acceptance work at all; report each as its own finding.
8. Report the lot: units in rank order, both population summaries, and one
verdict with every finding ranked.
## Pitfalls
- Running the acceptance matrix over the delivery lot only. The qualification
diodes are inside the clause, and leaving them out is the single defect this
leaf exists to catch.
- Grading a sampled activity unit by unit. Nearly every diode then looks as
though it is missing a record, and the real gaps disappear into the noise.
- Grading an every-unit activity as a sample. A lot of thousands closes on a
handful of visual inspections nobody agreed to substitute.
- Reading an empty acceptance record as a pass. A diode with no record has not
been shown sound; it has been shown undocumented.
- Collapsing absence into failure. They reach different desks through different
paperwork, so the verdict keeps them apart.
- Folding a sampled failure into one unit's verdict. The sample was drawn to
speak for the population, so the finding belongs to the population.
- Assuming a failed diode closes the lot. Both answers are legitimate project
positions, and assuming either produces a verdict nobody agreed to.
- Judging a drawn share or a cleared share that lands exactly on its floor by
bare arithmetic. Both are quotients of counted units, so a lot drawn to
exactly the declared fraction can land a unit in the last place below it; the
comparison absorbs that while the floor stays as declared.
## Behavior contract (gate 3)
The policy resolution with its two-basis split, the per-unit grading over the
every-unit set, the four record states and the ranked unit verdict, the sampled
activity share against its floor, the per-population roll-up with its cleared
share, the absent and untouched population detectors, the failure position and
the single lot verdict are exercised by the gate 3 contract test:
scripts/test_e2008_blocking_diode_acceptance_general.py against
scripts/e2008_blocking_diode_acceptance_general_logic.py (stdlib unittest,
offline). Run:
python3 scripts/test_e2008_blocking_diode_acceptance_general.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.