Use when a bare-cell test matrix, qualification schedule or batch sampling plan has to be graded. Evaluate a bare solar cell test programme against the two errands clause 7.1.1 of ECSS-E-ST-20-08C puts on it, qualification of the cell design and procurement of a delivery batch: hold each declared activity to the errand it serves, check the specimen kind that errand allows and refuse a destructive run on a cell meant for delivery, size each sample against a floor that grows with the batch for ...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e2008-bare-cell-testing-overview --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E2008 Bare Cell Testing Overview?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2008-bare-cell-testing-overview)More formats (shields.io, HTML) on the badges page.
---
name: e2008-bare-cell-testing-overview
description: "Use when a bare-cell test matrix, qualification schedule or batch sampling plan has to be graded. Evaluate a bare solar cell test programme against the two errands clause 7.1.1 of ECSS-E-ST-20-08C puts on it, qualification of the cell design and procurement of a delivery batch: hold each declared activity to the errand it serves, check the specimen kind that errand allows and refuse a destructive run on a cell meant for delivery, size each sample against a floor that grows with the batch for procurement and stays fixed for qualification, measure coverage per errand, and return one programme verdict. Trigger: ecss, e-st-20-08c, bare-solar-cell-test-programme, bare-cell-qualification-and-procurement-errands, bare-cell-batch-sampling-floor, bare-cell-test-specimen-eligibility, bare-cell-destructive-test-allocation, bare-cell-programme-coverage."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e-st-20-08c, e2008-bare-cell-testing-overview, bare-solar-cell-test-programme, bare-cell-qualification-and-procurement-errands, bare-cell-batch-sampling-floor, bare-cell-test-specimen-eligibility, bare-cell-destructive-test-allocation, bare-cell-programme-coverage]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Photovoltaic -- Bare Cell Testing Overview (space-systems/ecss/e2008-bare-cell-testing-overview)
Use when the task is the bare-cell test programme of ECSS-E-ST-20-08C clause
7.1.1 -- the tests carried out to qualify a bare solar cell and the tests
carried out to procure a batch of them -- and the declared matrix has to be
graded rather than merely listed.
## Domain quick reference
- A bare cell is the cell before coverglass, interconnector or adhesive. Its
test programme therefore says nothing about the assembly built from it, and
an assembly-level result cannot be read back down onto the cell.
- The programme serves two errands that share a vocabulary and almost nothing
else. Qualification asks whether this cell design, from this line, survives
the mission; it is answered once per design and process baseline. Procurement
asks whether the batch being bought is the same cell that was qualified; it
is answered every batch. Reading a result across the two is the single most
common way a programme looks complete and is not.
- The specimen follows the errand. A qualification answer needs cells drawn
from the lot set aside for qualification, or witness cells built alongside
them; a procurement answer needs cells sampled from the batch being bought.
A cell destined for delivery is the product, not a test article, and the
moment a destructive activity is pointed at one the deliverable is gone.
- Sample sizes scale differently per errand, and for a reason. A procurement
sample speaks for a batch, so its floor grows with the batch. A qualification
sample speaks for a design, so its floor is fixed and adding cells to it buys
very little. Sizing both the same way over-samples one and under-samples the
other.
- A sampling floor derived from a square root is computed in integers. The
square root of a perfect square can land a hair under the exact root on one
platform and exactly on it on another, which moves a floor by a whole cell
and turns an adequate sample into a finding on one machine only.
- The environments -- humidity, thermal cycling, particle irradiation,
ultraviolet exposure, reverse bias -- sit on the qualification side and
consume their specimens. The measurements -- visual, dimensional, electrical
performance, mass -- sit on both sides and do not.
- Coverage is per errand, never pooled. A programme can be complete for
procurement and empty for qualification while showing a healthy total
activity count, so the totals are reported separately and the shortfall is
named by activity.
## Workflow
1. Take the batch size the programme is written against and the declared
activity list, each activity carrying its errand, its specimen kind and its
sample size.
2. Per activity, check the specimen kind against the errand: refuse a
qualification answer read off a procurement sample, and refuse any activity
pointed at a cell destined for delivery.
3. Derive the sample floor for that errand and batch, in integer arithmetic,
and compare the declared sample with it. Report a sample larger than the
batch separately from a sample under the floor -- they are different
mistakes.
4. Mark each activity as required for its errand or supplementary, so an
extra measurement is carried as an addition rather than mistaken for
coverage of something else.
5. Count coverage per errand over that errand's own required set, crediting
only activities that are themselves acceptable; an activity on the wrong
specimen covers nothing.
6. Report the qualification share of the declared programme, so a matrix that
is almost entirely batch measurement is visible as such.
7. Roll up: an unacceptable activity or an errand under its coverage threshold
makes the programme not acceptable; supplementary activities alone make it
acceptable with findings.
## Pitfalls
- Reading a qualification conclusion off a procurement sample. The sample was
drawn to show a batch matches a design, and it cannot show the design was
ever right.
- Running a destructive activity on cells that are going to be delivered. The
test passes and the deliverable is consumed, which is why the specimen kind
is checked before the sample size.
- Sizing a qualification sample from the batch. It speaks for a design, so
scaling it with the purchase order adds cost and no evidence.
- Sizing a procurement sample from a fixed number. A small fixed sample stops
being representative as soon as the batch grows.
- Computing a square-root sampling floor in floating point. On a perfect
square the result can differ by one between platforms, and the sample that
passed locally becomes a finding in CI.
- Pooling coverage across the two errands. A single completeness percentage
hides an empty qualification column behind a full procurement one.
- Crediting an activity that was declared but placed on an ineligible
specimen. It appears in the matrix, it consumed a specimen, and it covers
nothing.
- Treating a supplementary measurement as coverage. It may be genuinely
useful and it still does not discharge a required activity.
- Comparing a coverage share with its threshold by bare arithmetic. Both are
ratios of small counts and a programme that is exactly at the threshold can
evaluate a few units in the last place under it; the comparison absorbs that
while the threshold stays as written.
## Behavior contract (gate 3)
The integer sampling floor, the per-errand sample policy, specimen
eligibility, the destructive-on-deliverable refusal, per-activity grading,
per-errand coverage, the qualification share and the programme rollup are
exercised by the gate 3 contract test:
scripts/test_e2008_bare_cell_testing_overview.py against
scripts/e2008_bare_cell_testing_overview_logic.py (stdlib unittest, offline).
Run:
python3 scripts/test_e2008_bare_cell_testing_overview.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.