Use when a bare cell qualification flow, cell lot sizing or test sequence has to be assessed. Validate the production and test schedule of clause 7.4.2 of ECSS-E-ST-20-08C followed while qualifying a bare solar cell: confirm every required production, measurement, environmental and documentation step is declared, hold each step behind the steps it depends on rather than merely present in the list, walk the cell lot through the declared order so each step is checked against the cells still in ...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e2008-bare-cell-qualification-schedule --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E2008 Bare Cell Qualification Schedule?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2008-bare-cell-qualification-schedule)More formats (shields.io, HTML) on the badges page.
---
name: e2008-bare-cell-qualification-schedule
description: "Use when a bare cell qualification flow, cell lot sizing or test sequence has to be assessed. Validate the production and test schedule of clause 7.4.2 of ECSS-E-ST-20-08C followed while qualifying a bare solar cell: confirm every required production, measurement, environmental and documentation step is declared, hold each step behind the steps it depends on rather than merely present in the list, walk the cell lot through the declared order so each step is checked against the cells still in the pool after the destructive steps ahead of it retired theirs, size the lot against a retest reserve, and rank the findings into one schedule verdict. Trigger: ecss, e-st-20-08c, bare-cell-qualification-schedule, bare-solar-cell-qualification-sequence, bare-cell-schedule-step-precedence, bare-cell-lot-sizing, bare-cell-destructive-test-placement."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e2008-bare-cell-qualification-schedule, e-st-20-08c, bare-cell-qualification-schedule, bare-solar-cell-qualification-sequence, bare-cell-schedule-step-precedence, bare-cell-lot-sizing, bare-cell-destructive-test-placement]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Photovoltaic — Bare Cell Qualification Schedule (space-systems/ecss/e2008-bare-cell-qualification-schedule)
Use when the task is clause 7.4.2 of ECSS-E-ST-20-08C: the production and
test schedule followed while a bare solar cell is qualified. This leaf
reads a declared sequence of steps and one identified cell lot, and
returns the steps that cannot run where they are placed, the steps nobody
declared, and the step at which the lot can no longer field a sample.
## Domain quick reference
- The schedule is about a bare cell, before any coverglass, interconnect
or adhesive exists. Everything the sequence measures is a property of
the cell itself, so a step that belongs to an assembly flow does not
belong here and a step that establishes the cell baseline cannot be
skipped.
- Order is the content of the schedule, not its presentation. An
environmental exposure placed before the illuminated baseline leaves
no before-and-after to read the degradation against, and a final
inspection placed before the exposure it is meant to reveal is a
signature on a blank page.
- Presence and position are separate questions. A step that appears in
the list but sits ahead of what it depends on is not a covered step,
and a plan reviewed by ticking names off a list passes that schedule
every time.
- Marking comes before measurement. A number taken off an unmarked cell
cannot be traced back to the cell it describes, so the whole lot
becomes one anonymous population rather than a set of identified
articles.
- The lot is a live pool, not a budget. Every step draws a sample; only
the destructive steps and the irradiation retire what they drew. Two
sequences that retire the same number of cells in total therefore run
out at different steps.
- Sample size and consumption are different quantities. A step needs its
whole sample available at once where it is placed, which a running
total of consumption never shows.
- A reserve is held above the campaign. A lot sized exactly to
consumption leaves nothing for the repeat that one anomalous cell
forces, so the closing balance is compared against a declared retest
reserve.
- The arms are ranked, not merged. An absent prerequisite is reported
ahead of a misplaced step, and a misplaced step ahead of a sample
shortfall, because enlarging a lot for a sequence still in the wrong
order buys cells for a campaign nobody can run.
## Workflow
1. Read the declared sequence and the lot it starts with. Reject an
unknown step, a repeated step or an empty sequence rather than
grading a list nobody can run.
2. Index the declared positions and resolve each step's prerequisites
into two separate lists: the ones absent from the sequence entirely
and the ones placed after the step that needs them.
3. Walk the lot through the declared order, recording the opening
balance, the sample drawn, the cells retired and the closing balance
at every step, and the first step the lot cannot supply.
4. Compare the closing balance against the declared retest reserve.
5. Rank the arms into one step verdict: absent prerequisite first, then
misplacement, then sample shortfall.
6. Roll the schedule up: name the steps nobody declared, group the rest
by verdict, test that marking precedes the first measurement and that
the report closes the sequence, report the declared share of the
required step set, and return a verdict that is clean only when
nothing is open.
## Pitfalls
- Grading a bare cell schedule with an assembly checklist. The coupon
steps of an assembly qualification have no article to run on yet, and
the cell baseline steps they omit are the ones this clause turns on.
- Sizing the lot against the largest single sample. Retirement
accumulates along the sequence, so a lot that covers the widest step
can still be short two cells by the time the last destructive test is
reached.
- Summing the consumption instead of walking it. The total says whether
the lot is big enough; only the walk says which step stops, and that
is the step the procurement has to be timed against.
- Treating every step as consuming its sample. A visual inspection
returns its cells to the pool and a pull test does not, and a schedule
graded as though both consume is rejected for a shortage it does not
have.
- Placing a destructive test ahead of the baseline measurements. The
test still runs and the cells are still gone, but nothing was recorded
about them first.
- Measuring before the lot is marked. The readings are real and belong
to no identified cell, which no later step can repair.
- Merging the arms into one pass or fail. A schedule missing a step and
a schedule holding all of them in the wrong order need different
corrections, and one verdict asks for the same one twice.
## Behavior contract (gate 3)
The required step set, the prerequisite resolution into absent and late
lists, the cell walk with its per-step opening balance, sample draw and
retirement, the retest reserve, the ranked step verdict and the rolled-up
completeness, marking-before-measurement and report placement checks are
exercised by the gate 3 contract test:
scripts/test_e2008_bare_cell_qualification_schedule.py against
scripts/e2008_bare_cell_qualification_schedule_logic.py (stdlib unittest,
offline). Run:
python3 scripts/test_e2008_bare_cell_qualification_schedule.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.