E2007 Shielded Enclosure Sizing
ASecurityUse when size an EMC shielded-enclosure against ECSS-E-ST-20-07C clause 5.2.2.2: strip the absorber-lined thickness off each internal dimension to obtain the usable envelope, place the unit-under-test on its ground-plane bench with the declared edge-clearance, add the measurement-antenna standoff, the antenna-body depth and the antenna-to-absorber-tip clearance along the measurement axis, then verify the enclosure clears the required length, width and height with positive margin while the qui...
- 2 stars
- 0 votes
- 0 copies
- 5 views
- Added September 27, 2026
Works with
Security analysis
100/100Pro scans all 3 files and shows the line behind each finding
npx -y skills add ashfordeOU/aero-agent-skills --skill e2007-shielded-enclosure-sizing --agent claude-codeAre you the author of E2007 Shielded Enclosure Sizing?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2007-shielded-enclosure-sizing)---
name: e2007-shielded-enclosure-sizing
description: "Use when size an EMC shielded-enclosure against ECSS-E-ST-20-07C clause 5.2.2.2: strip the absorber-lined thickness off each internal dimension to obtain the usable envelope, place the unit-under-test on its ground-plane bench with the declared edge-clearance, add the measurement-antenna standoff, the antenna-body depth and the antenna-to-absorber-tip clearance along the measurement axis, then verify the enclosure clears the required length, width and height with positive margin while the quiet-zone diameter still covers the bench footprint. Use it to reject an enclosure too small for the declared layout before a facility slot is booked. Trigger: ecss, e-st-20-07c, shielded-enclosure-sizing, anechoic-chamber-envelope, absorber-lined-wall, measurement-antenna-placement, quiet-zone-diameter, ground-plane-bench-layout, emc-facility-adequacy."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e2007-shielded-enclosure-sizing, shielded-enclosure, anechoic-chamber-envelope, absorber-lined-wall, measurement-antenna-placement, quiet-zone-diameter, ground-plane-bench-layout]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS EMC Facility — Shielded-Enclosure Sizing (space-systems/ecss/e2007-shielded-enclosure-sizing)
Use when the task is the facility-adequacy check of ECSS-E-ST-20-07C
clause 5.2.2.2 -- deciding whether a shielded-enclosure or
absorber-lined anechoic room is physically large enough to hold the
declared unit-under-test layout and the measurement-antenna placement
that the emission and susceptibility runs require.
## Domain quick reference
- Clause 5.2.2.2 is a geometry requirement, not a shielding-performance
requirement. The enclosure's shielding-effectiveness and its
absorber-lined reflectivity are graded elsewhere; here the only
question is whether the declared layout fits inside the enclosure
with the clearances the measurement method demands.
- The internal dimensions of a shielded-enclosure are not the usable
dimensions. Absorber on the two opposing walls of each axis consumes
twice the absorber depth, and a ceiling-lined or floor-lined
enclosure loses that depth again on the vertical axis. Sizing always
works on the usable envelope, never on the raw internal envelope.
- Along the measurement axis the required length is the sum of four
terms: the depth of the unit-under-test on its bench, the declared
antenna standoff (the calibrated separation between the front face
of the unit and the antenna reference point, typically 1 m, 3 m or
10 m), the physical depth of the antenna body, and the clearance
that must remain between the antenna and the absorber tips behind
it. Dropping any one term silently shrinks the requirement.
- Across the lateral axis the required width is the bench width, which
is the unit width plus the side edge-clearance on both sides, plus
any support-equipment rack standing beside the bench and its own
separation.
- On the vertical axis the required height is the ground-plane bench
height plus the unit height plus headroom to the ceiling absorber;
the antenna also scans over a height range, so the antenna's top
scan position plus half its aperture must clear the same ceiling.
The governing vertical requirement is the larger of the two.
- The quiet zone is the region within which the absorber-lined
performance is qualified. The bench footprint diagonal must sit
inside the declared quiet-zone diameter, otherwise part of the unit
radiates from or is illuminated in an unqualified region even though
the enclosure is dimensionally large enough.
## Workflow
1. Validate the enclosure record: internal length, width and height
all positive, absorber depth non-negative, and twice the absorber
depth strictly smaller than every internal dimension it is applied
to. Reject the enclosure outright rather than returning a negative
usable dimension.
2. Reduce the internal envelope to the usable envelope by removing the
absorber depth from both ends of each lined axis.
3. Validate the layout record: unit footprint and height positive,
bench height positive, edge-clearance and support-equipment
separation non-negative, antenna standoff one of the calibrated
separations, antenna type one of the recognized designations.
4. Build the requirement on each axis independently -- measurement
axis, lateral axis, vertical axis -- from the terms above.
5. Compare each requirement against the matching usable dimension and
record the signed margin. Treat a margin that is zero to within the
dimensional tolerance as satisfied; the layout terms are a sum of
floating-point lengths, so an exactly-fitting layout can otherwise
read a few units in the last place short.
6. Check the bench footprint diagonal against the declared quiet-zone
diameter under the same tolerance.
7. Aggregate the findings. The enclosure is adequate only when every
axis margin is non-negative and the quiet-zone check passes; report
the governing axis (smallest margin) so the facility search has a
number to work against.
## Pitfalls
- Sizing against the raw internal dimensions and discovering on the
day that the absorber wedges consume half a metre per wall. The
usable envelope is the only envelope that counts.
- Omitting the antenna-body depth or the antenna-to-absorber-tip
clearance because the antenna standoff sounds like the whole
requirement -- the standoff is measured to the antenna reference
point, and the hardware continues behind it.
- Taking the vertical requirement from the bench stack alone and
forgetting that the antenna scans upward; the scan ceiling often
governs a low-profile unit.
- Reading a dimensional pass as a quiet-zone pass. A large enclosure
with a small qualified quiet zone still fails clause 5.2.2.2 for a
wide bench footprint.
- Widening the engineering clearance to make an exactly-fitting layout
pass. The fix for a boundary case is a dimensional tolerance on the
comparison, never a smaller clearance.
## Behavior contract (gate 3)
The envelope-reduction, per-axis requirement, margin and quiet-zone
logic is exercised by the gate 3 contract test:
scripts/test_e2007_shielded_enclosure_sizing.py against
scripts/e2007_shielded_enclosure_sizing_logic.py (stdlib unittest,
offline). Run: python3 scripts/test_e2007_shielded_enclosure_sizing.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
Files in this skill
- SKILL.md
- scripts/e2007_shielded_enclosure_sizing_logic.py
- scripts/test_e2007_shielded_enclosure_sizing.py
Attribution
Related skills
View all in ai-agents →Comments
Loading comments…
Newsletter
Get the weekly list of safe new skills, and the ones we pulled.