E2007 Magnetic Cleanliness Control Plan
ASecurityUse when audit the documented magnetic-cleanliness control plan required by ECSS-E-ST-20-07C clause 4.2.5.1: check the plan carries its mandatory parts — design-guidelines, source-emission-limits, magnetic-screening procedure, verification-approach and dipole-budget maintenance — then allocate the system stray-field requirement down to each item by equal-share or root-sum-square, evaluate each item's dipole-moment contribution at the reference-distance in the axial or equatorial orientation, ...
- 2 stars
- 0 votes
- 0 copies
- 3 views
- Added September 27, 2026
Works with
Security analysis
100/100Pro scans all 3 files and shows the line behind each finding
npx -y skills add ashfordeOU/aero-agent-skills --skill e2007-magnetic-cleanliness-control-plan --agent claude-codeAre you the author of E2007 Magnetic Cleanliness Control Plan?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e2007-magnetic-cleanliness-control-plan)---
name: e2007-magnetic-cleanliness-control-plan
description: "Use when audit the documented magnetic-cleanliness control plan required by ECSS-E-ST-20-07C clause 4.2.5.1: check the plan carries its mandatory parts — design-guidelines, source-emission-limits, magnetic-screening procedure, verification-approach and dipole-budget maintenance — then allocate the system stray-field requirement down to each item by equal-share or root-sum-square, evaluate each item's dipole-moment contribution at the reference-distance in the axial or equatorial orientation, categorize every item into its magnetic-screening level from its permanent-magnet content, ferromagnetic mass and declared moment, and flag any item that exceeds its allocation or has no screening record. Trigger: ecss, e-st-20-electrical-scope, magnetic-cleanliness-control-plan, stray-magnetic-field, dipole-emission-limit, magnetic-screening, residual-magnetic-moment, demagnetization-procedure, magnetometer-reference-distance."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e2007-magnetic-cleanliness-control-plan, magnetic-cleanliness, stray-magnetic-field, dipole-emission-limit, magnetic-screening, residual-magnetic-moment, demagnetization-procedure]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Electromagnetic Compatibility — Magnetic Cleanliness Control Plan (space-systems/ecss/e2007-magnetic-cleanliness-control-plan)
Use when the task is the magnetic-cleanliness control plan of
ECSS-E-ST-20-07C clause 4.2.5.1 — confirming the plan is documented
with its mandatory parts, allocating the system stray-field
requirement into per-item source-emission-limits, and categorizing
every item into the magnetic-screening level its construction demands.
## Domain quick reference
- Clause 4.2.5.1 asks for a plan, not a measurement: a documented
control plan carrying design-guidelines for magnetically quiet
construction, source-emission-limits allocated to items, a
magnetic-screening procedure, a verification-approach, and the rule
by which the dipole-budget is maintained through the programme. A
plan missing any of those parts is incomplete even when every item
measures clean, because the control mechanism was never written down.
- The driving requirement is a stray-field level at a reference-distance,
typically the mounting position of a science magnetometer or of the
attitude-determination sensor. Allocation turns that single system
number into per-item limits. Equal-share divides it by the item count
and is conservative; root-sum-square divides it by the square root of
the item count and assumes the item moments add incoherently, which
is the usual assumption for randomly oriented residual moments.
- An item's contribution is modelled as a point magnetic-dipole: the
field falls with the cube of distance, is twice as strong along the
dipole axis as in the equatorial plane, and scales linearly with the
dipole-moment. Halving the reference-distance multiplies the field by
eight, so the distance the plan declares is as load-bearing as the
limit itself.
- The magnetic-screening level is set by construction, not by wish. An
item containing a permanent-magnet, or declaring a moment at or above
the mapping threshold, needs full three-axis dipole mapping followed
by compensation or demagnetization. An item with ferromagnetic mass
above the soft-material threshold needs full dipole mapping. An item
carrying a current-loop needs powered current-loop mapping, because
its moment only exists when it is energized. A small, non-magnetic,
unpowered item below the exemption threshold is screening-exempt and
is recorded as such rather than silently skipped.
- Screening status is part of the control loop: an item whose level is
anything other than screening-exempt must have screening planned or
complete. An item requiring screening with no screening on record is
a plan finding regardless of its declared moment, because the
declared value is then unverified.
## Workflow
1. Check the plan document for its mandatory parts and list the parts
that are absent. An absent part is a finding in its own right.
2. Read the system stray-field requirement and the reference-distance
at which it applies; reject a non-positive limit or distance.
3. Allocate the system limit across the item list by the declared
allocation method (equal-share or root-sum-square) to obtain each
item's source-emission-limit, letting an item that carries a
negotiated allocation of its own override the uniform split.
4. Categorize each item into its magnetic-screening level from its
permanent-magnet content, ferromagnetic mass, current-loop presence
and declared dipole-moment.
5. Compute each item's field contribution at the reference-distance in
the declared orientation and compare it with its allocation. Treat
an exactly on-limit item as compliant by absorbing the
floating-point representation error, never by raising the limit.
6. Combine the item contributions by root-sum-square and compare the
result with the system stray-field requirement. A uniform
root-sum-square split makes the two agree by construction, so this
step earns its place when items carry negotiated allocations: then a
set of individually compliant items can still overspend the system
requirement, and only the combined check sees it.
7. Aggregate the plan-completeness, screening-record and emission
findings; the plan is not compliant until all three lists are empty.
## Pitfalls
- Treating the plan as satisfied by a test report — clause 4.2.5.1 is
about the documented control mechanism, and a report of measurements
made without guidelines, limits and a screening procedure does not
replace it.
- Allocating by root-sum-square when the item moments are aligned by
construction (for example a row of identical actuators mounted the
same way); incoherent addition is an assumption that must hold, and
when it does not, equal-share is the defensible allocation.
- Quoting a field without its reference-distance and orientation: the
same dipole-moment gives an eightfold different field at half the
distance and a twofold difference between the axial and equatorial
direction.
- Accepting a declared dipole-moment from an item that was never
screened — the declaration is a supplier statement until the
screening procedure verifies it, so a missing screening record is a
finding even when the number looks comfortable.
- Handing out negotiated per-item allocations without re-checking the
combined total; a uniform split is self-consistent, but negotiated
limits are not, and a set of individually compliant items can then
overspend the system stray-field requirement.
- Widening an emission limit to absorb an exactly on-limit arithmetic
result; absorb the representation error in the comparison instead.
## Behavior contract (gate 3)
The plan-completeness, allocation, dipole-field, screening-level and
aggregate-compliance logic is exercised by the gate 3 contract test:
scripts/test_e2007_magnetic_cleanliness_control_plan.py against
scripts/e2007_magnetic_cleanliness_control_plan_logic.py (stdlib
unittest, offline). Run:
python3 scripts/test_e2007_magnetic_cleanliness_control_plan.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
Files in this skill
- SKILL.md
- scripts/e2007_magnetic_cleanliness_control_plan_logic.py
- scripts/test_e2007_magnetic_cleanliness_control_plan.py
Attribution
Related skills
View all in ai-agents →Comments
Loading comments…
Newsletter
Get the weekly list of safe new skills, and the ones we pulled.