Use when determine how each electrical power engineering requirement of ECSS-E-ST-20C clause 5.11.1 is verified: categorize the power verification item as a budget, sizing, dynamic or protection item, check the proposed method can actually produce closure evidence for that item, confirm the planned review point is not earlier than the method can mature, prove the evidence represents every mandatory worst-case power condition including end-of-life degradation, maximum eclipse, worst-case solar...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e20-power-engineering-verification-provisions --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E20 Power Engineering Verification Provisions?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e20-power-engineering-verification-provisions)More formats (shields.io, HTML) on the badges page.
---
name: e20-power-engineering-verification-provisions
description: "Use when determine how each electrical power engineering requirement of ECSS-E-ST-20C clause 5.11.1 is verified: categorize the power verification item as a budget, sizing, dynamic or protection item, check the proposed method can actually produce closure evidence for that item, confirm the planned review point is not earlier than the method can mature, prove the evidence represents every mandatory worst-case power condition including end-of-life degradation, maximum eclipse, worst-case solar aspect and the thermal corners, compute the demonstrated power margin from available against demanded power, and show the provision set covers every required item with no orphan. Trigger: ecss, e-st-20-electrical-scope, power-engineering-verification-provisions, power-budget-verification-evidence, energy-balance-verification-case, worst-case-power-condition, end-of-life-power-margin, power-verification-review-point."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e20-power-engineering-verification-provisions, power-engineering-verification-provisions, power-budget-verification-evidence, energy-balance-verification-case, worst-case-power-condition, end-of-life-power-margin, power-verification-review-point]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Electrical Engineering -- Power Engineering Verification Provisions (space-systems/ecss/e20-power-engineering-verification-provisions)
Use when the task is the clause 5.11.1 verification provision of
ECSS-E-ST-20C -- saying, for each electrical power engineering
requirement, by which method it is verified, at which programme review
the evidence is presented, and which worst case of the power system
that evidence has to represent.
## Domain quick reference
- A power verification item belongs to exactly one engineering family:
budget (power budget, energy balance, harness drop), sizing (solar
array, battery capacity), dynamic (bus voltage stability) or
protection (protection coordination). The family is what makes the
provision checkable -- it fixes which methods can produce evidence
and which worst case the evidence must show.
- The method set is not free choice. An energy balance closes on a
computed prediction and nothing else; a solar array size can also
close on a qualified precedent; a harness drop can close on a
measured build standard; a bus stability claim needs either a
small-signal prediction or a transient measurement, never a
document review. A method outside the item's set is a finding
against the provision, not a tailoring decision.
- Each method carries an earliest review at which its evidence is
mature. A design review and a precedent argument rest on documents
that exist at the preliminary baseline; a prediction closes against
the detailed design baseline; a build-standard check needs
manufactured hardware; a measurement needs a qualification-
configuration model. A provision that promises closure before its
method can physically deliver is a schedule risk written into the
verification matrix.
- The distinctive power engineering content is the worst case. Every
item names the conditions its evidence must represent: end-of-life
degradation, the longest eclipse, the worst solar aspect angle, the
hot and cold thermal corners, the largest load step, the maximum
source impedance case, the worst-case fault current. A prediction
run at beginning of life, nominal aspect and nominal temperature is
not evidence for a requirement that governs the end of the mission.
- A budget or sizing item closes against a number: the margin is the
surplus of available power over demanded power, expressed as a
fraction of the demand, and it is compared against the margin the
requirement demands. Because that margin is a difference of floats
divided by a float, an exactly-satisfied requirement can land a few
units in the last place low; the comparison absorbs the
representation error rather than moving the engineering limit.
## Workflow
1. Categorize each verification item into its family; reject an item
that is not a clause 5.11.1 power engineering item before it enters
the matrix.
2. Read the admissible method set for the item and flag a proposed
method that cannot produce closure evidence for it.
3. Look up the earliest review at which the proposed method matures
and flag a planned review point earlier than that.
4. Confirm the provision names an evidence artefact; a method with no
named report, procedure or drawing closes nothing.
5. Compare the conditions the evidence covers against the mandatory
worst-case set for the item, and list every condition the evidence
does not represent.
6. For a budget or sizing item, compute the margin as available power
less demanded power over demanded power, and flag a margin below
the required value; flag the provision outright when the margin
data is absent.
7. Aggregate over the whole required item set: report items with no
provision, provisions pointing at items outside the required set,
the coverage fraction and the collected findings. The provision set
is compliant only when every list is empty and coverage is
complete.
## Pitfalls
- Copying the verification method from the equipment specification
without asking what it produces -- a design review closes an
interface statement, but it cannot demonstrate that the array still
supplies the demand after fifteen years of degradation.
- Promising closure of a measurement-based provision at the
preliminary review because the schedule is tight; the model that
would carry the measurement does not exist yet, and the matrix then
hides a slip rather than showing it.
- Verifying a power budget at beginning of life and reading the
positive margin as compliance -- the requirement governs the worst
case, and end-of-life degradation with the longest eclipse is where
the budget actually closes or fails.
- Treating a named method as evidence -- "by analysis" with no report
number is an intention. The artefact is what a reviewer opens.
- Reading a complete-looking matrix as full coverage without checking
the other direction: a provision that points at a requirement
outside the agreed set inflates the count while leaving a real item
unverified.
- Failing an exactly-met margin because the subtraction of two floats
landed a fraction of a unit in the last place low, then widening the
required margin to make it pass -- the fix belongs in the
comparison, never in the requirement.
## Behavior contract (gate 3)
The item categorization, method admissibility, review-maturity,
worst-case-condition, power-margin and coverage logic is exercised by
the gate 3 contract test:
scripts/test_e20_power_engineering_verification_provisions.py against
scripts/e20_power_engineering_verification_provisions_logic.py (stdlib
unittest, offline). Run:
python3 scripts/test_e20_power_engineering_verification_provisions.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.