Use when plan or audit a qualification approach that has to close radio-frequency power-handling-capability and gas-discharge-behaviour together, under ECSS-E-ST-20C clause 7.3.4: derive the qualification-power-level from maximum-operating-power and the agreed overstress-factor, categorize the evidence route behind each axis and refuse a non-standalone route with nothing supporting it, check the dwell reaches thermal steady state at the hot case, confirm the pressure sweep crossed the whole c...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e20-power-and-discharge-qualification --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E20 Power And Discharge Qualification?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e20-power-and-discharge-qualification)More formats (shields.io, HTML) on the badges page.
---
name: e20-power-and-discharge-qualification
description: "Use when plan or audit a qualification approach that has to close radio-frequency power-handling-capability and gas-discharge-behaviour together, under ECSS-E-ST-20C clause 7.3.4: derive the qualification-power-level from maximum-operating-power and the agreed overstress-factor, categorize the evidence route behind each axis and refuse a non-standalone route with nothing supporting it, check the dwell reaches thermal steady state at the hot case, confirm the pressure sweep crossed the whole critical band instead of sitting in vacuum, insist both axes close on one hardware-standard, and determine which axes a later design change reopens. Trigger: ecss, e-st-20-electrical-scope, power-and-discharge-qualification, qualification-power-level, qualification-overstress-factor, power-handling-capability, gas-discharge-behaviour, delta-qualification-trigger, hardware-standard-consistency."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e20-power-and-discharge-qualification, qualification-power-level, qualification-overstress-factor, power-handling-capability, gas-discharge-behaviour, delta-qualification-trigger, hardware-standard-consistency]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Electrical Engineering -- Power and Discharge Qualification (space-systems/ecss/e20-power-and-discharge-qualification)
Use when the task is the clause 7.3.4 qualification approach of
ECSS-E-ST-20C -- the one programme that has to answer both what a
radio-frequency item can carry and how it behaves when the gas around
it can break down, on hardware whose configuration is traceable
across the two answers.
## Domain quick reference
- The clause has two axes and they are not interchangeable.
Power-handling-capability is a thermal and ohmic question: the item
carries the overstressed level long enough to settle, at the hot
case it will really see. Gas-discharge-behaviour is a breakdown
question: the item stays discharge-free at that same level while the
ambient pressure is swept through the band where onset is lowest.
Closing one says nothing about the other.
- Both axes are referred to the same number. The qualification level
is the maximum operating power raised by the agreed overstress in
decibels, and the operating envelope a campaign actually qualifies
is the demonstrated level brought back down by the same factor. When
the two axes demonstrate different levels, the envelope is set by
the weaker of them.
- Evidence routes differ in what they can close alone. A dedicated
qualification model or a protoflight campaign is standalone. A
numerical prediction or an argument from heritage is not: it closes
an axis only with a correlation record or a heritage-delta behind
it, and without that record the axis stays open however good the
numbers look.
- Dwell is a physical quantity, not a schedule item. The power axis
needs enough dwell to reach thermal steady state -- several thermal
time constants, floored by a minimum -- and the discharge axis needs
enough dwell at each pressure step for onset to develop, since a
fast sweep can pass straight through the weak point.
- One hardware standard, or a recorded link. Closing the power axis on
a qualification model and the discharge axis on an engineering model
is acceptable only when a configuration link ties the two standards
together; otherwise nothing shows the qualified behaviour belongs to
one item.
- A later design change reopens the axes it touches: gap geometry,
surface treatment and venting path reopen the discharge axis;
plating and thermal interface reopen the power axis; dielectric
material, connector interface and any operating-power increase
reopen both. A change that touches neither leaves the qualification
standing.
## Workflow
1. Derive the qualification level from the maximum operating power and
the agreed overstress; reject a non-positive power or a negative
overstress.
2. Categorize the evidence route declared for each axis, resolving
aliases, and reject an unrecognized route. Flag a non-standalone
route with no supporting reference recorded against it.
3. Close the power axis: demonstrated level at or above the required
level, dwell at or above several thermal time constants floored by
the minimum, and the hot case reached. Flag a missing thermal time
constant rather than assuming one.
4. Close the discharge axis: demonstrated level at or above the
required level, the swept pressure band containing the whole
critical band, and enough dwell at each step. Report each uncovered
sub-band.
5. Check the two axes against each other: one hardware standard, or
two with a configuration link on record.
6. Compute the operating envelope the campaign supports as the weaker
axis's demonstrated level brought back through the overstress
factor.
7. Map every declared design change onto the axes it reopens and state
the delta-qualification scope. The programme is qualified only when
no axis is open, no axis is unaddressed, and no change is left
hanging.
## Pitfalls
- Reporting one axis as the qualification. A campaign that proves the
item survives its dissipation says nothing about what happens at a
few hundred pascal, and vice versa.
- Running the discharge sweep only in vacuum because that is where the
chamber is stable. The clause is about crossing the weak band, and a
vacuum-only sweep never reaches it.
- Sweeping pressure quickly. Onset needs dwell at each step; a fast
ramp can cross the weakest condition without giving a discharge time
to establish.
- Accepting a prediction as a closed axis. A numerical route earns
closure only with a correlation to a measurement, and a heritage
argument only with the delta written down.
- Splitting the axes across two hardware standards and never linking
them. The pair then qualifies no single configuration.
- Treating a late gap or venting change as a paperwork update. Those
changes reopen the discharge axis specifically, and the delta scope
follows from which axis was touched, not from how large the change
looks.
## Behavior contract (gate 3)
The evidence categorization, qualification-level, operating-envelope,
dwell, power-axis, discharge-axis, cross-axis-configuration and
delta-qualification logic is exercised by the gate 3 contract test:
scripts/test_e20_power_and_discharge_qualification.py against
scripts/e20_power_and_discharge_qualification_logic.py (stdlib
unittest, offline). Run:
python3 scripts/test_e20_power_and_discharge_qualification.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.