Skills DirectorySkills Directory
SkillsLearnSecurityCategoriesDocsCommunityBlog
Sign InSubmit Skill
Skills Directory

Security-tested agent skills for Claude, coding agents, and AI workflows.

Directory

  • Browse Skills
  • All Skills A–Z
  • Claude Skills
  • Claude Code Skills
  • Agent Skills
  • Categories
  • Authors
  • Submit a Skill

Learn

  • Learn Hub
  • Install Claude Skills
  • Write SKILL.md
  • Skills vs MCP
  • Directories Compared

Security

  • Security
  • Methodology
  • Secure Claude Skills
  • Security Badges

Company

  • About
  • Community
  • Blog
  • API Docs
  • Advertise

2026 Skills Directory. All rights reserved.

ProTermsPrivacyRefunds
Back to skills

E20 Emc Control Plan Delivery

ASecurity

Use when draft and hand over the electromagnetic compatibility control plan in time for the preliminary design review under ECSS-E-ST-20C clause 6.2.2: categorize each mandatory plan section as management, design or verification content, list the sections the plan does not declare, score the maturity every declared section has reached, compute the completeness index the plan holds at hand-over, count the calendar lead between the issue date and the review against the data package deadline, an...

2 stars
0 votes
0 copies
0 views
Added 9/27/2026
ai-agentspythongo

Works with

claude code

Security Analysis

A100/100

Scanned 9/27/2026

Install to Claude Code

$npx -y skills add ashfordeOU/aero-agent-skills --skill e20-emc-control-plan-delivery --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of E20 Emc Control Plan Delivery?

Add the live security badge to your README — it updates automatically with every re-scan.

Security grade badge for E20 Emc Control Plan Delivery
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/ashfordeou-e20-emc-control-plan-delivery/badge)](https://www.skillsdirectory.com/skills/ashfordeou-e20-emc-control-plan-delivery)

More formats (shields.io, HTML) on the badges page.

Download with Pro
Files
SKILL.md
---
name: e20-emc-control-plan-delivery
description: "Use when draft and hand over the electromagnetic compatibility control plan in time for the preliminary design review under ECSS-E-ST-20C clause 6.2.2: categorize each mandatory plan section as management, design or verification content, list the sections the plan does not declare, score the maturity every declared section has reached, compute the completeness index the plan holds at hand-over, count the calendar lead between the issue date and the review against the data package deadline, and prove every compatibility requirement traces into a section that exists and has been started. Trigger: ecss, e-st-20-electrical-scope, emc-control-plan-delivery, emc-control-plan-sections, plan-section-maturity-index, control-plan-delivery-lead-time, emc-requirement-plan-traceability, preliminary-design-review-data-package."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
  - id: ecss
    reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
  domain: space-systems
  subdomain: ecss
  tags: [ecss, e-st-20-electrical-scope, e20-emc-control-plan-delivery, emc-control-plan-delivery, emc-control-plan-sections, plan-section-maturity-index, control-plan-delivery-lead-time, emc-requirement-plan-traceability, preliminary-design-review-data-package]
  version: 0.1.0
  author: Aero Agent Skills
---

# ECSS Electrical Engineering -- EMC Control Plan Delivery (space-systems/ecss/e20-emc-control-plan-delivery)

Use when the task is the clause 6.2.2 control plan of ECSS-E-ST-20C --
writing down how electromagnetic compatibility will be controlled on
the project and putting that document in the reviewers' hands early
enough that the preliminary design review can still act on it.

## Domain quick reference

- The plan carries twelve mandatory sections in three groups.
  Management content says what the plan applies to, who is responsible,
  what is delivered when, and how a non-conformance or waiver is
  routed. Design content carries the requirement and limit flow-down,
  the grounding and bonding concept, the shielding and harness rules,
  frequency management and protected bands, and the safety margin
  policy. Verification content carries the approach to predictive work,
  the verification and test approach, and the interference-critical
  point list. A section the plan does not declare is a gap in the
  method, not a formatting detail.
- A declared section is not automatically a delivered section. Each one
  carries a status -- not started, draft, issued, approved -- and only
  a section at issued or better is content a reviewer can act on. The
  plan's completeness index is the mean maturity over the mandatory
  set, with an undeclared section contributing nothing, so a plan
  cannot buy a high score by declaring only its finished sections.
- Because that index is a sum of maturities divided by a count, a plan
  whose sections all sit exactly at the hand-over status can land a
  unit in the last place below the threshold. The comparison absorbs
  that representation error; the threshold itself never moves.
- Delivery is a date, not an intention. The lead is the calendar
  distance between the plan's issue date and the review date, and it
  has to clear the data package deadline -- the window in which
  reviewers actually read the package. A plan issued inside that window
  is late even though its date precedes the review, and a plan issued
  after the review arrives once the architecture is already frozen,
  which is exactly the outcome the clause exists to prevent.
- The plan also has to absorb the compatibility requirements. Every
  requirement in the flow-down points at the section that implements
  it; a requirement with no section, a requirement pointing at a
  section the plan never declared, and a requirement pointing at a
  section still at not-started are three distinct findings with three
  distinct fixes.

## Workflow

1. Categorize each declared section into its group; reject a section
   that is not part of the clause 6.2.2 control plan before it reaches
   the completeness count.
2. List the mandatory sections the plan does not declare.
3. Read the status of every declared section and list those below the
   minimum status expected at hand-over.
4. Compute the completeness index as the mean maturity over the
   mandatory set, and compare it against the hand-over threshold with
   a comparison that tolerates the floating-point mean.
5. Count the calendar days between the issue date and the review date;
   flag a hand-over after the review and, separately, a hand-over
   inside the data package deadline.
6. Walk the compatibility requirement flow-down and flag every
   requirement that traces nowhere, traces to an undeclared section, or
   traces to a section that has not started.
7. Aggregate the section, maturity, timing and traceability findings.
   The plan is deliverable only when every list is empty and the index
   holds the threshold.

## Pitfalls

- Delivering a table of contents with every section named and nothing
  written -- the count looks complete while the maturity of the plan is
  that of its emptiest section.
- Reading "issued before the review" as on time; the package deadline
  is the real date, and a plan that lands a few days before the review
  is read by nobody in time to change anything.
- Letting the grounding and bonding concept sit in draft at hand-over
  because the architecture "is not final" -- that concept is one of the
  inputs the review exists to settle, and deferring it inverts the
  order.
- Treating a requirement flow-down as traced because the plan mentions
  the requirement somewhere; the trace has to land in a named section,
  and that section has to have been started.
- Averaging maturity over the sections the plan happens to declare
  rather than over the mandatory set, which makes a plan missing four
  sections score higher than one that declared them all in draft.
- Widening the hand-over threshold because a plan whose sections are
  all exactly at the expected status scored a hair under it; the
  shortfall is in the arithmetic, not in the plan.

## Behavior contract (gate 3)

The section categorization, status maturity, completeness index,
delivery lead time and requirement traceability logic is exercised by
the gate 3 contract test:
scripts/test_e20_emc_control_plan_delivery.py against
scripts/e20_emc_control_plan_delivery_logic.py (stdlib unittest,
offline). Run:
python3 scripts/test_e20_emc_control_plan_delivery.py

## Compliance

- ECSS standards are freely downloadable (ESA); cite the source and
  paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.

Attribution

ashfordeOUashfordeOU
View sourceMore from ashfordeOU →
SSkills DirectorySkills Directory

Know which skills are safe — weekly.

Best new skills + every skill we flagged as malicious. From the team that scanned 103,619.

Join free

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments (0)

No comments yet. Be the first to comment!

SSkills DirectorySkills Directory

Know which skills are safe — weekly.

Best new skills + every skill we flagged as malicious. From the team that scanned 103,619.

Join free

Related Skills

Caveman

Ultra-compressed communication mode that cuts output tokens while keeping technical accuracy. Levels: lite, full, ultra and the wenyan variants. Use for /caveman, "caveman mode", "talk like caveman", "be brief" or "less tokens".

1074701 votes

Hyperplan

Adversarial multi-agent planning skill. Self-orchestrates 5 hostile category members (unspecified-low, unspecified-high, deep, ultrabrain, artistry) via team-mode for ruthless cross-critique debate, distills only the defensible insights, then MANDATORILY hands the distilled insight bundle to the `plan` agent for executable plan formalization. Use when planning needs maximum rigor and surfacing of weak assumptions, blind spots, and over-engineering. Triggers: 'hyperplan', 'hpp', '/hyperplan', ...

694821 votes

Mcp Code Execution

Routes multi-tool workflows through MCP servers for large datasets and pipelines. Use when Bash tool overhead is limiting throughput on data-heavy tasks.

3351 votes

catchup

Recovers the conversation and failed tool calls of a previous Codex, Claude Code, Antigravity, Cline, Copilot CLI, Cursor, DeepSeek Harness, Kimi, OpenCode, Pi Agent, or ZCode session. Use when the user says "catch up", "what did the last session do", "get me up to speed", "I switched agents", asks to recover/summarize a previous session before continuing, or asks to diagnose or report a catchup failure. Do NOT use for the current conversation, git history, or any non-agent log.

691 votes

math-skill

A comprehensive mathematical reasoning skill for AI assistants — handles arithmetic to research-level problems with rigorous step-by-step reasoning, systematic verification, and transparent uncertainty handling

381 votes
View all in ai-agents →