Use when verify that an electromagnetic-compatibility control plan carries the content ECSS-E-ST-20C Annex A calls for: check every content block is declared and non-empty, confirm the organisation block names the compatibility owner, its reporting path and its control-board interface, categorize each register entry by interference mechanism and control measure and reject a measure that does not act on the coupling path it claims to control, power-sum the emitter levels behind each victim and...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e20-emc-control-plan-contents --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E20 Emc Control Plan Contents?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e20-emc-control-plan-contents)More formats (shields.io, HTML) on the badges page.
---
name: e20-emc-control-plan-contents
description: "Use when verify that an electromagnetic-compatibility control plan carries the content ECSS-E-ST-20C Annex A calls for: check every content block is declared and non-empty, confirm the organisation block names the compatibility owner, its reporting path and its control-board interface, categorize each register entry by interference mechanism and control measure and reject a measure that does not act on the coupling path it claims to control, power-sum the emitter levels behind each victim and compare the resulting margin against the required one, and hold every milestone far enough ahead of the review it anchors to. Trigger: ecss, e-st-20-electrical-scope, e20-emc-control-plan-contents, emc-control-plan-content-blocks, control-measure-register, electromagnetic-budget-margin, grounding-and-bonding-scheme, interference-coupling-path, control-plan-milestone-lead."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e20-emc-control-plan-contents, emc-control-plan-content-blocks, control-measure-register, electromagnetic-budget-margin, grounding-and-bonding-scheme, control-plan-milestone-lead]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Electrical Engineering — EMC Control Plan Contents (space-systems/ecss/e20-emc-control-plan-contents)
Use when the task is the content of the electromagnetic-compatibility control
plan described by the ECSS-E-ST-20C Annex A data-requirement -- who owns
compatibility control, which design measures are being applied, what
electromagnetic budgets those measures have to buy, and when each piece of
that work lands against the programme reviews. The check is on the plan
document itself, not on the delivery date of the plan and not on the
verification activities it points to.
## Domain quick reference
- Six content blocks make up the plan: organisation-and-responsibility,
control-measure-register, electromagnetic-budget-table,
verification-approach-reference, schedule-and-milestone-list and
deviation-handling-route. A block that is present as a heading but carries
no content counts as undeclared -- an empty section is not a content
block, and reading it as one lets an unplanned area pass the review.
- The organisation block has to name three distinct things: the engineer or
authority that owns compatibility control, the reporting path by which
findings reach project management, and the interface to the board that
arbitrates changes. A delegate named without a scope is a finding, because
an unscoped delegation cannot be checked against the work breakdown.
- The control-measure register pairs an interference mechanism with the
measure that controls it. Mechanisms split into conducted-emission,
conducted-susceptibility, radiated-emission, radiated-susceptibility,
electrostatic-discharge and lightning-induced-transient; measures into a
grounding-scheme, a bonding-scheme, a shielding-scheme,
cable-category-segregation, a filtering-scheme and a
galvanic-isolation-scheme. A measure only buys margin on the coupling
paths it physically acts on: filtering and galvanic isolation act on the
conducted paths, shielding, bonding and cable-category-segregation act on
the radiated paths, bonding and grounding carry the discharge path.
- Levels in the budget table are in dB, so several emitters seen by one
victim combine by a power sum (10 log10 of the summed linear powers), not
by arithmetic addition. Two equal emitters sit about 3 dB above one of
them, never twice the level. The margin a victim holds is its
susceptibility level minus that aggregate, compared against the margin the
programme requires.
- Schedule entries anchor to a named review -- preliminary-design-review,
critical-design-review, qualification-review, acceptance-review or
flight-readiness-review -- and carry the lead in days by which the
milestone precedes it. A negative lead means the work lands after the
review it is meant to feed.
## Workflow
1. Resolve every declared block name to its canonical token and reject a
block the data-requirement does not recognise; then list the required
blocks the plan leaves undeclared or empty.
2. Read the organisation block and record a finding for each of the three
mandatory roles it does not name, and for every delegate declared
without a scope.
3. Walk the control-measure register. Resolve the mechanism and the measure
of each entry, record an unnamed owner, and reject any pairing whose
measure does not act on that mechanism's coupling path -- a rejected
pairing does not count as coverage.
4. After the register walk, list every mechanism in scope that no surviving
entry controls. Narrow the scope list explicitly if the programme has
argued a mechanism away; never let an absent entry imply an absent
mechanism.
5. For each budget row, power-sum the emitter levels, subtract the aggregate
from the victim's susceptibility level, and compare the margin against
the required one. Absorb float representation error at an exactly met
requirement rather than lowering the required margin.
6. Report the worst margin and its victim so the table has a single number
the review can carry, alongside the full breach list.
7. Check each milestone anchors to a known review and leads it by at least
the minimum lead, and that the reviews the plan must serve all carry at
least one milestone.
8. The plan is acceptable only when no block, role, mechanism, budget row
or milestone finding remains open.
## Pitfalls
- Adding emitter levels in dB. Levels are logarithmic; two 40 dB emitters
aggregate to about 43 dB, and summing them to 80 dB turns a compliant
budget into a fictional breach that costs real shielding mass.
- Counting an empty heading as a declared block. The plan then reads as
complete while an entire control area -- most often the
deviation-handling-route -- has no owner at all.
- Accepting a register entry that pairs a mechanism with a measure that
does not act on it, such as a filtering-scheme offered against a radiated
path. The entry looks like coverage in a table count but buys nothing,
and it hides the mechanism that is genuinely uncontrolled.
- Treating the absence of a register entry as evidence that the mechanism
does not apply. Scope is declared, not inferred; a mechanism argued away
belongs in the scope list with its argument, not silently missing.
- Confusing the control plan with the verification plan. Annex A content is
the control side -- organisation, measures, budgets, schedule -- and it
points at the verification approach rather than restating its activities.
- Letting a milestone carry a negative lead because the anchor slipped. A
milestone that lands after the review it feeds leaves that review with no
compatibility evidence, which is a schedule finding, not a rounding
detail.
## Behavior contract (gate 3)
The block-presence rule, the organisation-role check, the
mechanism-to-measure effectiveness rule, the dB power-sum aggregation, the
budget-margin comparison and the milestone-lead check are exercised by the
gate 3 contract test: scripts/test_e20_emc_control_plan_contents.py against
scripts/e20_emc_control_plan_contents_logic.py (stdlib unittest, offline).
Run: python3 scripts/test_e20_emc_control_plan_contents.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.