Use when maintain the analysis and test planning inside a spacecraft charging protection programme under ECSS-E-ST-20C clause 6.3.4.2: categorize each planned activity as a charging analysis task or a charging test task, derive the mandatory task set from the charging regime the item is exposed to, report every required task that is absent or left unplanned, compute the steady-state field a penetrating electron flux drives into a dielectric against its derated breakdown strength, derive the c...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e20-charging-programme-analysis-and-testing --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E20 Charging Programme Analysis And Testing?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e20-charging-programme-analysis-and-testing)More formats (shields.io, HTML) on the badges page.
---
name: e20-charging-programme-analysis-and-testing
description: "Use when maintain the analysis and test planning inside a spacecraft charging protection programme under ECSS-E-ST-20C clause 6.3.4.2: categorize each planned activity as a charging analysis task or a charging test task, derive the mandatory task set from the charging regime the item is exposed to, report every required task that is absent or left unplanned, compute the steady-state field a penetrating electron flux drives into a dielectric against its derated breakdown strength, derive the charge bleed-off time constant against the permitted limit, and confirm every planned test severity envelopes the worst case the analysis predicts. Trigger: ecss, e-st-20c-clause-6-3-4-2, spacecraft-charging-protection-programme, charging-analysis-planning, charging-test-planning, deep-dielectric-charging, electrostatic-discharge-test-environment, bleed-off-time-constant, differential-potential-onset."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e20-charging-programme-analysis-and-testing, spacecraft-charging-protection-programme, charging-analysis-planning, charging-test-planning, deep-dielectric-charging, bleed-off-time-constant, differential-potential-onset]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Electrical Engineering -- Charging Programme Analysis and Testing (space-systems/ecss/e20-charging-programme-analysis-and-testing)
Use when the task is the clause 6.3.4.2 planning content of
ECSS-E-ST-20C -- keeping a spacecraft charging protection programme
carrying both a predictive workstream and a hardware workstream, sized
to the charging environment the item actually sees, with the planned
test conditions still bounding what the prediction says will happen.
## Domain quick reference
- A charging protection programme holds two families of activity and
the clause asks for both. The predictive family covers absolute and
differential potential work, the internal field a penetrating
electron flux builds inside a dielectric, the energy a discharge
would release, and the path charge takes to drain away. The hardware
family covers electron-beam charging of a coupon, discharge
susceptibility of a unit, measurement of the bleed-off resistance,
screening of dielectric breakdown, and transient injection on the
harness. An activity that belongs to neither family is not a
programme task and is rejected before the plan is graded.
- The mandatory task set follows the charging regime. A geostationary
surface-charging item, an auroral low-orbit item, an internally
charged dielectric and a solar-array triple junction each draw a
different combination, and every regime draws at least one task from
each family -- the clause cannot be closed by prediction alone, nor
by testing an item whose exposure was never predicted. A required
task that is absent from the plan, carried with no status, or parked
as not planned is the same finding: the programme does not cover it.
- The internal field in a dielectric at steady state is the penetrating
current density multiplied by the bulk resistivity of the material.
It is compared against the breakdown strength derated by a safety
factor, not against the raw strength. The same resistivity, with the
material permittivity, sets the bleed-off time constant: how long a
deposited charge takes to drain. A highly resistive material is the
worst of both -- it builds a larger field and holds it longer.
- The differential potential between a surface and the structure it
sits on is what drives a discharge, and only its magnitude matters;
charging potentials are normally negative and the sign carries no
information for the onset check.
- The consistency rule between the two families is one-directional:
every severity parameter the analysis predicts must be met or
exceeded by the planned test. A test planned below the predicted
severity does not qualify the item, and a predicted parameter the
test plan never names is an uncovered prediction, reported on its
own terms rather than folded into the severity comparison.
## Workflow
1. Categorize every activity the programme plans as an analysis task
or a test task; reject an activity that is neither before the plan
is graded.
2. Derive the mandatory task set from the item's charging regime and
list every required task the plan does not carry, treating an
absent task, a null status and a parked task alike.
3. Compute the steady-state dielectric field from the penetrating
current density and the bulk resistivity, and compare it against
the breakdown strength divided by the safety factor.
4. Derive the bleed-off time constant from the relative permittivity
and the same bulk resistivity, and compare it against the drain
time the programme permits.
5. Take the magnitude of the surface-to-structure potential difference
and compare it against the discharge-onset threshold for that
surface pair.
6. For every severity parameter in the analysis worst case, confirm
the test plan carries the parameter and plans it at or above the
predicted value; report an absent parameter separately from an
under-severe one.
7. Aggregate the planning, dielectric, bleed-off, differential and
envelope findings; the item is covered only when all five lists are
empty.
## Pitfalls
- Counting a long list of predictive work as a complete programme.
Every regime in the clause draws a hardware task as well, and a plan
with no test task is incomplete however deep the modelling goes.
- Treating a task named on the plan with no status as planned. A row
with no commitment behind it is indistinguishable from an absent row
for the purpose of the clause, and both are findings.
- Comparing the internal field against the raw breakdown strength of
the datasheet rather than the derated allowable; the safety factor
is what separates a qualification margin from a coin flip on a
material property that scatters with temperature and dose.
- Reading a low field as sufficient evidence and skipping the drain
check. Field magnitude and drain time come from the same resistivity
but answer different questions, and a material can pass the field
check while holding charge far longer than the programme allows.
- Signing the surface potential into the onset comparison. Both
potentials are usually negative, the differential is a magnitude,
and carrying the sign through flips a real exceedance into an
apparent pass.
- Planning the charging test at the predicted severity and calling the
pair consistent when the value is a sum or a product; a physically
equal case can land a few representation units on the wrong side, so
the equality is absorbed in the comparison rather than by widening
the planned severity.
## Behavior contract (gate 3)
The task categorization, regime task-set, unplanned-task, dielectric
field, bleed-off time constant, differential potential and
test-envelope logic is exercised by the gate 3 contract test:
scripts/test_e20_charging_programme_analysis_and_testing.py against
scripts/e20_charging_programme_analysis_and_testing_logic.py (stdlib
unittest, offline). Run:
python3 scripts/test_e20_charging_programme_analysis_and_testing.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.