Use when plan, verify and record the pre-launch removal, replacement or storage of a spacecraft battery module under ECSS-E-ST-20C clause 5.6.4: categorize the module access path (direct-hatch-access, panel-removal, harness-demate, stack-teardown or non-removable), project the open-circuit state of charge a stored module reaches from its temperature-corrected self-discharge rate, screen the storage envelope for temperature excursion, deep-discharge, shelf-life and humidity breaches, derive th...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill e20-battery-removal-and-storage --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of E20 Battery Removal And Storage?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e20-battery-removal-and-storage)More formats (shields.io, HTML) on the badges page.
---
name: e20-battery-removal-and-storage
description: "Use when plan, verify and record the pre-launch removal, replacement or storage of a spacecraft battery module under ECSS-E-ST-20C clause 5.6.4: categorize the module access path (direct-hatch-access, panel-removal, harness-demate, stack-teardown or non-removable), project the open-circuit state of charge a stored module reaches from its temperature-corrected self-discharge rate, screen the storage envelope for temperature excursion, deep-discharge, shelf-life and humidity breaches, derive the delta re-verification task set the operation triggers, and decide whether the module keeps its acceptance status or has to re-establish it. Trigger: ecss, e-st-20-electrical-scope, battery-module-removal, pre-launch-battery-replacement, battery-storage-envelope, open-circuit-self-discharge, maintenance-charge-interval, delta-reverification-scope, acceptance-status-retention."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-20-electrical-scope, e20-battery-removal-and-storage, battery-module-removal, battery-storage-envelope, open-circuit-self-discharge, delta-reverification-scope, acceptance-status-retention]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Electrical Engineering -- Battery Removal and Storage (space-systems/ecss/e20-battery-removal-and-storage)
Use when the task is the ECSS-E-ST-20C clause 5.6.4 case: a battery
module must be removable or replaceable on the integrated spacecraft
before launch, and the removal plus the storage interval that follows
must not quietly destroy the acceptance status the module already
holds.
## Domain quick reference
- Clause 5.6.4 is a design-for-access requirement with a verification
consequence. The design side asks whether the module can be taken
out at all; the verification side asks what has to be re-done
afterwards. A module that is physically reachable but whose removal
forces a full re-acceptance has not satisfied the intent.
- The access path is the driver. Five paths are distinguished, ordered
by how much qualified hardware they disturb: direct-hatch-access and
panel-removal reach the module without breaking a qualified
electrical interface; harness-demate breaks the connector interface
and therefore pulls in continuity and bonding checks; stack-teardown
disturbs the mechanical load path as well and pulls in a capacity
retest and a workmanship vibration retest; non-removable means the
clause is not met at all, whatever the storage plan says.
- Storage is a second, independent way to lose acceptance status. A
removed module sits on open circuit and self-discharges. The rate is
strongly temperature dependent -- take it as doubling for every 10 K
above a 20 degC reference and halving for every 10 K below -- so the
state of charge reached after a storage interval is a computed
number, not a stated one. Four envelope parameters are screened:
storage temperature band, the deep-discharge floor the cells must
never drop below, the shelf-life limit, and the humidity limit.
- The maintenance charge interval falls out of the same model: the
days of open-circuit storage before the module drifts from its
as-stored state of charge down to its floor. It is the schedule
constraint the storage procedure has to respect, and it shortens by
a factor of four for every 20 K of extra storage temperature.
- Acceptance status resolves to one of three states: preserved subject
to a delta re-verification, invalidated because the required tasks
exceed the delta allowance agreed for the programme, or invalidated
because the module was never removable. The first is the only
passing outcome, and only when the storage envelope is also clean.
## Workflow
1. Validate the module record: identifier, access path, state of
charge and rate figures, the storage band, the shelf-life limit and
the humidity limit. Reject an unknown access path, a percentage
outside 0..100, an inverted temperature band, or a starting state
of charge that is already at or below the floor.
2. Categorize the access path and read off two things: whether the
module is removable at all, and which qualified interfaces the
removal breaks.
3. Compute the temperature-corrected self-discharge rate, project the
state of charge at the end of the storage interval, and compute the
maintenance charge interval from the same rate.
4. Screen the storage envelope for the four breach types -- temperature
excursion, deep discharge below the floor, shelf-life exceeded,
humidity limit exceeded. A value exactly at a limit is inside it.
5. Build the delta re-verification task set: the tasks the access path
forces, plus one task per storage breach, de-duplicated and kept in
a stable order.
6. Compare that set against the programme's delta re-verification
allowance and resolve the acceptance state. The module is compliant
only when the state is preserved and no storage breach was raised.
## Pitfalls
- Reading "the module can be removed" as clause satisfaction and
stopping there. Removability is necessary, not sufficient; the
question the clause actually asks is whether acceptance status
survives, and that is decided by the re-verification task set, not
by the geometry.
- Treating the stored state of charge as the as-removed state of
charge. Open-circuit self-discharge over a multi-month storage
interval is the normal way a module arrives at re-installation
already below its floor, and a warm store makes it far faster than a
room-temperature figure suggests.
- Applying a single self-discharge rate regardless of store
temperature. A module held at 40 degC drains four times as fast as
the same module at 20 degC, so a maintenance charge interval derived
at the reference temperature is optimistic by the same factor.
- Letting a storage breach be "closed" by noting it and moving on. A
deep-discharge excursion or an exceeded shelf life adds a
re-verification task, and that task then has to fit inside the delta
allowance like any other -- a breach can be what pushes the module
from preserved into invalidated.
- Allowing a task the programme never agreed to as a delta activity to
be silently absorbed into the allowance. The allowance is an input
to the assessment, not something the assessment gets to widen.
## Behavior contract (gate 3)
The module validation, access-path categorization, self-discharge and
storage-projection arithmetic, envelope screening, task-set derivation
and acceptance-state resolution are exercised by the gate 3 contract
test: test_e20_battery_removal_and_storage.py against
e20_battery_removal_and_storage_logic.py (stdlib unittest, offline,
deterministic). Run: `python3 scripts/test_e20_battery_removal_and_storage.py`
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.