E1011 Mission Phases
ASecurityUse when map mission phases and identify human-in-the-loop activities for HFE requirements capture under ECSS-E-ST-10-11C §4.3.6: inventory each canonical phase (ground operations, launch, ascent, deployment, on-orbit checkout, nominal operations, contingency, disposal), categorize every operator or crew activity within each phase, flag phases with no human-in-the-loop coverage, flag critical activities lacking human oversight in safety-critical phases, and derive one HFE requirement per huma...
- 2 stars
- 0 votes
- 0 copies
- 6 views
- Added September 27, 2026
Works with
Security analysis
100/100Pro scans all 3 files and shows the line behind each finding
npx -y skills add ashfordeOU/aero-agent-skills --skill e1011-mission-phases --agent claude-codeAre you the author of E1011 Mission Phases?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-e1011-mission-phases)---
name: e1011-mission-phases
description: "Use when map mission phases and identify human-in-the-loop activities for HFE requirements capture under ECSS-E-ST-10-11C §4.3.6: inventory each canonical phase (ground operations, launch, ascent, deployment, on-orbit checkout, nominal operations, contingency, disposal), categorize every operator or crew activity within each phase, flag phases with no human-in-the-loop coverage, flag critical activities lacking human oversight in safety-critical phases, and derive one HFE requirement per human-assigned activity to populate the requirements register. Trigger: ecss, e-st-10-system-scope, e-st-10-11c, human-factors, mission-phases, human-in-the-loop, hfe-requirements, operator-activities."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, e-st-10-system-scope, e-st-10-11c, human-factors, mission-phases, human-in-the-loop, hfe-requirements, operator-activities]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Human Factors Engineering — Mission Phases (space-systems/ecss/e1011-mission-phases)
Use when the task is to map canonical mission phases and identify
human-in-the-loop activities within each phase for Human Factors Engineering
(HFE) requirements capture, following ECSS-E-ST-10-11C §4.3.6 — inventorying
operator and crew activities per phase, flagging gaps in human coverage, and
deriving one structured HFE requirement for each human-assigned activity.
## Domain quick reference
- ECSS-E-ST-10-11C §4.3.6 requires that the HFE assessment covers every
mission phase in which a human operator or crew member is involved. The
standard establishes eight canonical phases in lifecycle order: ground
operations (pre-launch), launch, ascent, deployment/separation,
on-orbit checkout, nominal operations, contingency/off-nominal operations,
and disposal/decommissioning. Each programme must step through the full
phase list and confirm which phases are within the HFE assessment scope.
- Within each in-scope phase, every human activity is catalogued by activity
type (commanding, monitoring, maintenance, procedure execution, decision
making, communication, emergency response, configuration) and by criticality
(critical, routine, or monitoring-only). Activities without human involvement
are recorded as automated but are not excluded from the inventory —
automated activities in mandatory-human phases (launch, ascent, contingency)
that carry critical criticality must be reviewed: the absence of human
oversight is itself an HFE finding that requires disposition.
- Each human-in-the-loop activity maps to a primary HFE driver category
(workload, cognitive, anthropometry, communication, or safety) that seeds
the HFE requirements register. The mapping is deterministic: commanding
and procedure-execution map to workload; monitoring and decision-making map
to cognitive; maintenance maps to anthropometry; communication maps to
communication; emergency-response maps to safety; configuration maps to
workload.
- A phase with no human activities is flagged for scope confirmation — it may
be intentionally out of scope (unmanned phase) or it may represent a gap in
the activity inventory. The distinction must be documented before the HFE
requirements register is baselined.
## Workflow
1. Enumerate the canonical phase list and confirm which phases are within the
programme's HFE scope. Mark out-of-scope phases explicitly; do not silently
drop them. Reject any phase token not drawn from the controlled vocabulary
before continuing.
2. For each in-scope phase, collect every human and automated activity.
Validate each activity's type and criticality against the controlled
vocabularies; reject unrecognized tokens with an explicit error before the
phase analysis proceeds.
3. Categorize each activity as human-in-the-loop or automated. For human
activities, determine the primary HFE driver from the activity-type mapping.
For automated activities in the mandatory-human phases (launch, ascent,
contingency), flag any critical-criticality activity that lacks human
oversight.
4. Derive one HFE requirement for each human-in-the-loop activity. Assign the
structured requirement ID `HFE-<PHASE_CODE>-<ACTIVITY_ID>` and record the
phase, activity identifier, HFE driver category, and criticality level.
5. After processing all activities, perform the per-phase coverage check: a
phase that produced no HFE requirements (all activities automated) is
flagged as a potential scope gap requiring scope-confirmation documentation.
6. Perform the completeness check across all canonical phases: any phase absent
from the activity inventory is flagged as missing. A requirements register
is ready for baselining only when both the per-phase coverage findings and
the inventory-completeness findings are empty, or each finding has a
documented disposition.
## Pitfalls
- Treating phases with no human activities as trivially compliant — an
automated phase in a crewed programme may represent a missing activity
inventory entry rather than a genuine autonomous segment, and the difference
must be documented, not assumed.
- Failing to flag critical automated activities in mandatory-human phases
(launch, ascent, contingency) — these phases carry heightened safety
significance, and any critical task without a human check is an HFE risk
that requires a formal disposition even if no HFE requirement is generated.
- Accepting free-text activity-type or criticality tokens without validation —
uncontrolled tokens prevent consistent driver mapping and break downstream
traceability into the HFE requirements register.
- Generating HFE requirements only for the phases the analyst remembers —
stepping through the full canonical phase list programmatically ensures no
phase is silently omitted from the assessment scope.
- Treating the per-phase coverage check as optional — a phase that yields zero
HFE requirements is not automatically out of scope; the absence of
requirements must be a deliberate, documented decision.
## Behavior contract (gate 3)
The phase-code validation, activity-type validation, criticality validation,
activity categorization, HFE-driver mapping, requirement-ID generation,
phase-analysis, completeness-check, and full-map logic is exercised by the
gate 3 contract test: scripts/test_e1011_mission_phases.py against
scripts/e1011_mission_phases_logic.py (stdlib unittest, offline). Run:
python3 scripts/test_e1011_mission_phases.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
Files in this skill
- SKILL.md
- scripts/e1011_mission_phases_logic.py