Skills DirectorySkills Directory
SkillsLearnSecurityCategoriesDocsCommunityBlog
Sign InSubmit Skill
Skills Directory

Security-tested agent skills for Claude, coding agents, and AI workflows.

Directory

  • Browse Skills
  • All Skills A–Z
  • Claude Skills
  • Claude Code Skills
  • Agent Skills
  • Categories
  • Authors
  • Submit a Skill

Learn

  • Learn Hub
  • Install Claude Skills
  • Write SKILL.md
  • Skills vs MCP
  • Directories Compared

Security

  • Security
  • Methodology
  • Secure Claude Skills
  • Security Badges

Company

  • About
  • Community
  • Blog
  • API Docs
  • Advertise

2026 Skills Directory. All rights reserved.

ProTermsPrivacyRefunds
Back to skills

E1003 Management

ASecurity

Use when manage a system-level test campaign under ECSS-E-ST-10C §4.3.1: assign customer and supplier responsibilities to each test event, verify that all mandatory readiness conditions (configuration baseline locked, procedure approved, support-equipment calibrated, personnel qualified, safety clearance granted) are satisfied before authorising a test, sequence campaign phases from planning through closeout, and flag any responsibility gap or unmet readiness prerequisite before the test-read...

2 stars
0 votes
0 copies
0 views
Added 9/27/2026
ai-agentspythontesting

Works with

claude code

Security Analysis

A100/100

Scanned 9/27/2026

Install to Claude Code

$npx -y skills add ashfordeOU/aero-agent-skills --skill e1003-management --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of E1003 Management?

Add the live security badge to your README — it updates automatically with every re-scan.

Security grade badge for E1003 Management
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/ashfordeou-e1003-management/badge)](https://www.skillsdirectory.com/skills/ashfordeou-e1003-management)

More formats (shields.io, HTML) on the badges page.

Download with Pro
Files
SKILL.md
---
name: e1003-management
description: "Use when manage a system-level test campaign under ECSS-E-ST-10C §4.3.1: assign customer and supplier responsibilities to each test event, verify that all mandatory readiness conditions (configuration baseline locked, procedure approved, support-equipment calibrated, personnel qualified, safety clearance granted) are satisfied before authorising a test, sequence campaign phases from planning through closeout, and flag any responsibility gap or unmet readiness prerequisite before the test-readiness review is held. Trigger: ecss, e-st-10-system-scope, test-management, test-campaign, readiness-review, customer-supplier, test-responsibility, test-readiness."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
  - id: ecss
    reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
  domain: space-systems
  subdomain: ecss
  tags: [ecss, e-st-10-system-scope, test-management, test-campaign, readiness-review, customer-supplier, test-responsibility]
  version: 0.1.0
  author: Aero Agent Skills
---

# ECSS System Testing — Test Campaign Management (space-systems/ecss/e1003-management)

Use when the task is to organise a system-level test campaign per
ECSS-E-ST-10C §4.3.1 — assigning responsibilities between customer and
supplier, verifying test readiness before a run is authorised, and
sequencing campaign phases in the required order.

## Domain quick reference

- §4.3.1 partitions test-campaign responsibilities into two roles.
  The **customer** owns witness decisions, procedure approval sign-off,
  and final acceptance of test results. The **supplier** conducts tests,
  prepares and executes procedures, controls the test environment, and
  maintains the configuration baseline. Some events (system integration,
  combined operations) are joint — both parties share responsibility for
  planning and execution.
- Readiness conditions are mandatory prerequisites that must each be
  confirmed true before a test is authorised to start. The five canonical
  conditions are: configuration baseline locked; test procedure approved;
  support equipment calibrated and within validity; personnel qualified for
  the test; safety clearance granted. A test with any unmet condition is
  not authorised — partial satisfaction does not suffice.
- Campaign phases follow a fixed sequence: planning → preparation →
  readiness review → execution → reporting → closeout. Phases may be
  tailored out (omitted) when formally justified, but the relative order of
  retained phases must not be changed.

## Workflow

1. Inventory every test event in the campaign and record its test type
   (acceptance, unit, subsystem, environmental, manufacturing, system,
   integration, combined operations, or qualification witness). Reject any
   event whose type is not on the recognised list before it enters the
   responsibility assignment step.
2. For each event, apply the responsibility rule: acceptance and
   qualification-witness tests are customer-led; unit, subsystem,
   environmental, and manufacturing tests are supplier-led; system,
   integration, and combined-operations tests are joint. Record the
   assigned role and flag any event where the assignment could not be made
   automatically (unknown type or contested override).
3. Before each test, evaluate all five mandatory readiness conditions.
   Collect which conditions are confirmed and which remain unmet. A single
   unmet condition blocks authorisation. Record unknown or ad-hoc condition
   labels as warnings — they do not satisfy the canonical list.
4. Assemble the campaign phase sequence and validate it against the
   canonical order. Flag out-of-order phases, unknown phase names, and
   duplicates; do not proceed to execution review if the sequence is invalid.
5. Build the campaign plan: aggregate responsibility assignments and
   readiness status across all events. The campaign is ready to enter
   execution only when every event carries a valid responsibility assignment
   and all readiness conditions are met for each event.

## Pitfalls

- Treating partial readiness as sufficient — all five conditions must be
  confirmed; an event that satisfies four of five is not authorised.
- Allowing an unrecognised test type to pass through without an explicit
  responsibility decision — unknown types must be resolved or rejected before
  the campaign plan is finalised.
- Reordering campaign phases to work around scheduling pressure — the
  readiness review must precede execution; bypassing it invalidates the
  authorisation chain.
- Conflating the customer witness role with joint responsibility — a customer
  witness test is customer-led (supplier conducts, customer witnesses and
  accepts); that is not the same as a joint event where both parties share
  planning and execution responsibility.

## Behavior contract (gate 3)

The responsibility-assignment, readiness-condition, phase-sequencing, and
campaign-plan logic is exercised by the gate 3 contract test:
scripts/test_e1003_management.py against scripts/e1003_management_logic.py
(stdlib unittest, offline). Run:

    python3 scripts/test_e1003_management.py

## Compliance

- ECSS standards are freely downloadable (ESA); cite the source and
  paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.

Attribution

ashfordeOUashfordeOU
View sourceMore from ashfordeOU →
SSkills DirectorySkills Directory

Know which skills are safe — weekly.

Best new skills + every skill we flagged as malicious. From the team that scanned 103,619.

Join free

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments (0)

No comments yet. Be the first to comment!

SSkills DirectorySkills Directory

Know which skills are safe — weekly.

Best new skills + every skill we flagged as malicious. From the team that scanned 103,619.

Join free

Related Skills

Caveman

Ultra-compressed communication mode that cuts output tokens while keeping technical accuracy. Levels: lite, full, ultra and the wenyan variants. Use for /caveman, "caveman mode", "talk like caveman", "be brief" or "less tokens".

1074701 votes

Hyperplan

Adversarial multi-agent planning skill. Self-orchestrates 5 hostile category members (unspecified-low, unspecified-high, deep, ultrabrain, artistry) via team-mode for ruthless cross-critique debate, distills only the defensible insights, then MANDATORILY hands the distilled insight bundle to the `plan` agent for executable plan formalization. Use when planning needs maximum rigor and surfacing of weak assumptions, blind spots, and over-engineering. Triggers: 'hyperplan', 'hpp', '/hyperplan', ...

694821 votes

Mcp Code Execution

Routes multi-tool workflows through MCP servers for large datasets and pipelines. Use when Bash tool overhead is limiting throughput on data-heavy tasks.

3351 votes

catchup

Recovers the conversation and failed tool calls of a previous Codex, Claude Code, Antigravity, Cline, Copilot CLI, Cursor, DeepSeek Harness, Kimi, OpenCode, Pi Agent, or ZCode session. Use when the user says "catch up", "what did the last session do", "get me up to speed", "I switched agents", asks to recover/summarize a previous session before continuing, or asks to diagnose or report a catchup failure. Do NOT use for the current conversation, git history, or any non-agent log.

691 votes

math-skill

A comprehensive mathematical reasoning skill for AI assistants — handles arithmetic to research-level problems with rigorous step-by-step reasoning, systematic verification, and transparent uncertainty handling

381 votes
View all in ai-agents →