Skip to content
Back to skills

E10 Systems Engineering

ASecurity

Use when scoping or gating European space systems engineering per ECSS-E-ST-10C: determine the lifecycle phase (0 through F), map each phase to its review gate (MDR, PRR, SRR, PDR, CDR, QR, AR, FRR, CRR, ER), and validate that a phase is ready to exit when its required review records are complete. The phase-gate sequence drives program planning and procurement milestones for space systems, from mission analysis through disposal. Trigger: ecss, e-st-10c, lifecycle phases, phase gate, mdr, prr,...

  • 2 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added September 27, 2026
ai-agentspython

Works with

  • claude code

Security analysis

A100/100

Pro scans all 3 files and shows the line behind each finding

Scanned September 27, 2026

npx -y skills add ashfordeOU/aero-agent-skills --skill e10-systems-engineering --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of E10 Systems Engineering?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for E10 Systems Engineering
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/ashfordeou-e10-systems-engineering/badge)](https://www.skillsdirectory.com/skills/ashfordeou-e10-systems-engineering)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: e10-systems-engineering
description: "Use when scoping or gating European space systems engineering per ECSS-E-ST-10C: determine the lifecycle phase (0 through F), map each phase to its review gate (MDR, PRR, SRR, PDR, CDR, QR, AR, FRR, CRR, ER), and validate that a phase is ready to exit when its required review records are complete. The phase-gate sequence drives program planning and procurement milestones for space systems, from mission analysis through disposal. Trigger: ecss, e-st-10c, lifecycle phases, phase gate, mdr, prr, srr, pdr, cdr, qr, ar, frr, space systems engineering."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
  - id: ecss
    reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
  domain: space-systems
  subdomain: ecss
  tags: [ecss, e-st-10c, lifecycle, phase-gate, review, systems-engineering]
  version: 0.1.0
  author: Aero Agent Skills
---

# ECSS Systems Engineering (space-systems/ecss/e10-systems-engineering)

Use when the task is European space systems engineering under
ECSS-E-ST-10C: lifecycle phases, review gates, and phase-exit
readiness for a space program.

## Domain quick reference

- ECSS-E-ST-10C (systems engineering) structures the space system
  lifecycle into phases 0 through F, each closed by a review gate.
- Phase names: 0 mission analysis and feasibility, A feasibility,
  B preliminary definition, C detailed definition, D qualification
  and production, E utilization, F disposal.
- Review gates: MDR (mission definition review) at phase 0; PRR
  (preliminary requirements review) and SRR (system requirements
  review) at A; PDR (preliminary design review) at B; CDR (critical
  design review) at C; QR (qualification review), AR (acceptance
  review), and FRR (flight readiness review) at D; CRR (commissioning
  result review) and ER (end-of-life review) at E.
- A phase is ready to exit when the reviews assigned to it are
  complete; phase gates drive program milestones and procurement.

## Workflow

1. Determine the current lifecycle phase (0 through F) for the
   element or mission.
2. Map the phase to its review gate(s) via the phase-gate table.
3. Collect the completed review records for the phase.
4. Validate phase-exit readiness: all assigned reviews complete
   (missing reviews are listed).
5. Escalate any missing gate review before advancing the phase.

## Pitfalls

- Advancing a phase with a review record still open (gate skipped).
- Confusing review order (SRR before PRR, QR before AR).
- Expecting phase E to carry design reviews (it carries CRR/ER only).
- Treating phase F (disposal) as having gate reviews (it has none).

## Behavior contract (gate 3)

The phase, review-gate, and readiness logic is exercised by the gate 3
contract test: scripts/test_e10_systems_engineering.py against
scripts/e10_systems_engineering_logic.py (stdlib unittest, offline).
Run:
python3 scripts/test_e10_systems_engineering.py

## Compliance

- ECSS standards are freely downloadable (ESA); cite the source and
  paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.

Files in this skill

  • SKILL.md3.1 KB
  • scripts/e10_systems_engineering_logic.py2.4 KB
  • scripts/test_e10_systems_engineering.py3 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

View all in ai-agents →

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.