Installs into .claude/skills of the current project.
Are you the author of Cost Contracts Estimate Takeoff Discipline?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/aniruddhaadak80-cost-contracts-estimate-takeoff-discipline)
---
name: cost-contracts-estimate-takeoff-discipline
description: "Quantity takeoffs, productivity rates, risk allowances, and bid review gates."
---
# Produce estimates that survive construction
> Quantity takeoffs, productivity rates, risk allowances, and bid review gates.
**Track:** 🏗️ Construction & Built Environment · **Domain:** Cost & Contracts · **Level:** intermediate · **~40 min**
**Who this is for:** Project Engineers, Site Managers, Cost Estimators, Contractors
## When to Use This Skill
Quantity takeoffs, productivity rates, risk allowances, and bid review gates.
Use it whenever a matching task appears in conversation — the agent loads these instructions on demand.
## Steps
1. Take off quantities from issued-for-construction drawings only, revision-stamped
2. Apply productivity rates from YOUR historical data where possible
3. Price escalation exposure explicitly for long-duration packages
4. Risk register items each carry quantified allowance or explicit exclusion
5. Peer review gate before submit: two challenge questions minimum
6. Post-bid learning loop: estimate vs actual fed back by division
## Common Pitfalls
- Pricing from superseded drawing revisions
- Allowances hidden inside line items nobody can audit
## Commands
**Install with skills CLI**
```bash
npx skills add aniruddhaadak80/skills --skill cost-contracts-estimate-takeoff-discipline
```
**Install globally**
```bash
npx skills add aniruddhaadak80/skills --skill cost-contracts-estimate-takeoff-discipline -g
```
---
Part of [aniruddhaadak80/skills](https://github.com/aniruddhaadak80/skills) · Browse all at https://skills.sh/aniruddhaadak80/skills