Skip to content
Back to skills

Plan Phases

ASecurity

Restructure an existing plan into phases with /verify gates after each phase and critical outcomes, plus blocking pre-action gates for safety prerequisites. Trigger when the user runs /phase-plan or asks to "add phases to this plan", "gate this plan", "restructure the plan", or "add checkpoints". Use plan-create for new plans and plan-deep-dive for inspection without restructuring.

  • 14 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added September 6, 2026
ai-agentsgosecurity

Security analysis

A100/100

Pro scans all 2 files and shows the line behind each finding

Scanned September 22, 2026

npx -y skills add allemaar/open-skills --skill plan-phases --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Plan Phases?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Plan Phases
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/allemaar-plan-phases/badge)](https://www.skillsdirectory.com/skills/allemaar-plan-phases)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: plan-phases
description: >
  Restructure an existing plan into phases with /verify gates after each phase and critical outcomes, plus blocking pre-action gates for safety prerequisites. Trigger when the user runs /phase-plan or asks to "add phases to this plan", "gate this plan", "restructure the plan", or "add checkpoints". Use plan-create for new plans and plan-deep-dive for inspection without restructuring.
visibility: public
self-improvable: true
next-skills:
  - skill: plan-execute
    phrase: "/plan-execute"
    why: "Run the now-phased plan"
  - skill: plan-deep-dive
    phrase: "/plan-deep-dive"
    why: "Inspect the phased plan before running it"
triggers:
  - "/phase-plan"
  - "add phases to this plan"
  - "gate this plan"
  - "restructure the plan"
  - "add checkpoints"
---

# /phase-plan

Take an existing flat or unstructured plan and restructure it into phased execution. Add `/verify` gates after each phase and critical outcome. Add blocking gates before actions whose safety prerequisites must already be true.

> **Structured execution spec:** [`protocol.yon`](protocol.yon). Read it for the canonical rules and step sequence; this file is explanation. The two must stay in sync — if you edit one, update the other and refresh the `@STAMP` date.

> **Plan Restructuring Protocol — transforms any plan into a gated, phased structure for structural legibility and explicit checkpointing.** Restructure, never delete. All original content is preserved.

## What is `/verify`?

`/verify` is a verification gate — a point where execution stops and the current state is validated before proceeding. When you encounter a `/verify` gate in a restructured plan:

1. Review what the gate specifies
2. Verify each condition is met
3. Only continue to the next phase/step once the gate passes

If `/verify` is not a recognized command in your session, replace it with an explicit user confirmation prompt: pause, state what you're verifying, and wait for the user to confirm before continuing.

A `/verify` gate may sit before or after an action. It must block **before** mutation when it proves a prerequisite whose absence would make the action unsafe. Examples include authorization, no-follow target resolution, backup or readback readiness, live-data scope, and destructive-target confirmation. Retain a separate gate **after** the action to verify the intended outcome.

## Phase 1 — Locate & Load Existing Plan

1. **Find the plan** — check `implementation_plan.md`, `PLAN.md`, `task.md`, recent conversation context, or user-provided file. Load the full content. If multiple candidates exist, use the most recently modified file and note the choice.
2. **Assess structure** — flat (single list)? Partially phased? Missing verification steps? Identify structural gaps.

**If no plan is found** after checking all locations → stop. Ask the user to provide the plan before continuing.

## Phase 2 — Decompose Into Phases

1. **Identify natural phase boundaries** — group related steps by dependency order, component, or concern. Each phase must be independently verifiable. Mark critical steps that need individual `/verify` gates.
2. **Define phases** — each phase needs:
   - Clear name
   - Goal / deliverable
   - Ordered steps
   - Success criteria

Ensure phases flow logically — dependencies before dependents.

## Phase 3 — Insert Check Gates

1. **Phase-level gates** — insert a `/verify` gate **after every phase**. Gate focus must be specific to what that phase accomplished and what the next phase depends on.
2. **Critical step gates** — identify steps within phases that warrant individual `/verify` gates:
   - Risky operations
   - Breaking changes
   - Schema migrations
   - Cross-package impacts
   - Security-sensitive changes

   For each critical step, place any safety-prerequisite `/verify` gate before the step, then place an outcome `/verify` gate immediately after it.

### Gate Quality Reference

A gate must validate something observable. If it can't fail, it's ceremonial.

| | Example |
|-|---------|
| **Good gate** | `/verify` — migration applied: `users.email` column is non-null, existing rows have values, no FK errors in test suite |
| **Bad gate** | `/verify` — make sure the migration looks right |

The bad gate has no observable condition. The good gate has three specific pass/fail criteria a different person could verify independently.

### Gate Placement Rules

- MUST insert a `/verify` gate after completing any phase
- MUST insert a blocking pre-action `/verify` gate when authorization, no-follow target proof, backup or readback readiness, live-data scope, destructive-target confirmation, or another safety prerequisite must be established before mutation
- MUST retain a separate post-action `/verify` gate for the operation's outcome; a safety prerequisite cannot be validated only after the action
- MUST insert an inline post-action `/verify` gate after any schema migration, breaking change, or security-sensitive step
- MUST insert an inline `/verify` gate after any step with cross-package impact
- SHOULD split phases with >5 steps into sub-phases with intermediate `/verify` gates

## Phase 4 — Rewrite & Output

1. **Rewrite the plan** — in its original format (`implementation_plan.md`, `PLAN.md`, or `task.md`) with the new phased structure. Preserve all original content — restructure, do not delete. Each phase should clearly show: steps, `/verify` gate, and what the gate validates. **If the plan has no source file** (existed only in conversation context), output the full restructured plan as a fenced code block in the response instead.
2. **Diff report** — summarize what changed: how many phases created, how many `/verify` gates added, any steps reordered or split.

## Rules

- MUST preserve ALL original plan content — restructure, never delete
- MUST maintain original intent and goal alignment
- MUST use the same file format as the original plan
- MUST NOT add new scope or features not in the original plan
- MUST NOT create ceremonial `/verify` gates with vague focus

## Next Steps

- `/plan-execute` — implement the newly phased plan
- `/double-check` — verify the restructured plan before executing

> **Human output.** This skill's handler-facing output obeys the human-output
> contract (`human-output/SKILL.md`).

> **Next skills.** On completion, run the Next Skills protocol (`next-skills/SKILL.md`): surface the `next-skills` recommendations from front-matter for the caller to pick. Offer only — never auto-invoke.

> **Self-improvement.** On completion, run the Self-Improvement Protocol (`self-improve/SKILL.md`): if this run surfaced a concrete, blocking-or-recurring weakness in this skill, propose a specific fix for the handler to approve. Conservative — silent otherwise. Never auto-apply.

Files in this skill

  • SKILL.md5.7 KB
  • protocol.yon7.4 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.